Disclosure table
- Flood overlays affecting Golden Beach, Queensland, 4551
- Planning scheme amendments, zoning restrictions, or building code changes relating to flood risk, coastal hazard adaptation, or climate resilience
- Any strategies or documents related to Coastal Hazard Adaptation Precinct Planning (CHAPP), Coastal Hazard Adaptation Strategy (CHAS), or QCoast2100
- Discussions or modelling related to managed retreat, voluntary buybacks, or relocation frameworks for residential properties in Golden Beach or adjacent suburbs
- Correspondence with, or documents submitted by, Sunshine Coast Regional Council, and/or third-party consultants including GHD, BMT, Queensland Reconstruction Authority (QRA), Department of Environment and Science or Local Government Association of Queensland referencing any of the above; and
- Documents assessing post-Bribie Island breakthrough impacts on flood risk, sea level intrusion, or changes to zoning strategy within the Pumicestone Passage zone.
- A copy of the pre-lodgement request, or any other request(s), made by UGL in or around late 2021 (or early 2022) that resulted in the State Assessment and Referral Agency (SARA) issuing the pre-lodgement advice dated 16 February 2022 (the Pre-lodgement Advice) in relation to:
- 11040 Valley of Lagoons Road, Valley of Lagoons, Queensland, 4850 (part of Lot 6 on WS50) (the Camel Creek Site); and
- Lynd Highway, Greenvale, Queensland, 4816 (Part of Lot 6 CLK25).
- All documents recording the outcome of the discussions and/or meetings held between SARA and UGL (or any other party on behalf of UGL) in respect of the pre-lodgement request and/or Pre-lodgement Advice. Relevant documents are believed to have been created in 2021-2022.
- Any other documents between SARA and UGL relating to the properties identified in the Pre-lodgement Advice, that were created between 1 January 2021 and July 2022.
- All documents relating to the request by UGL for consent to amend the material change of use permit (MCU Permit) for the Camel Creek Site (and/or for retrospective consent to the MCU Permit). Relevant documents are believed to have been created in 2024.
- Any other pre-lodgement requests made by UGL to SARA in respect of proposed temporary workers camps or proposed sites, other than those identified in the Pre-Lodgement Advice. Relevant documents are believed to have been created in 2024.
- All assessments used to assess, define, and support the Contaminated Agricultural Runoff water ‘Capture, Test, Monitor, Treat and Release’ conditions defined in ‘Draft Conditions 2311-37994 SDA (conditions 3-4)’; and
- All communications between the Water group of Department of Local Government, Water and Volunteers and Planning group of Department of State Development, Infrastructure and Planning, in relation to ‘Draft Conditions 2311-37994 SDA’.
- 2411-43581
- 2501-44137
- 2501-44097; and,
- 2410-42724.
- All documents related to application reference 2311-37994 SDA; and
- All documents regarding, assessments and stakeholder engagement support (including industry liaison) for the capture, treat, testing and release of contaminated agricultural runoff for the following:
- Queensland Murray Darling Water Plans (Condamine and Balonne (September 2019), Border Rivers and Moonie (September 2019) and the Warrego, Paroo and Nebine (June 2017))
- All Water Act’s; and
- Regulation, Plan; and Protocol or other planning instrument.
- exclude Cabinet and Parliament related material within the document; and
- include any briefing notes prepared for the Deputy Premier, any Assistant Minister or any staff member.
- Any correspondence, emails, notes, forms, minutes of meeting and resulting instructions, relating to the lobbyist meetings held by Paolo (Paul) Bini from Crisis & Comms Co Pty Ltd (as recorded on the Queensland Lobbyist Register) with:
- Senior Advisor, Office of the Minister for State Development and Infrastructure on 1 July 2024
- Senior Policy Advisor, Office of the Minister for State Development, Infrastructure and Planning on 31 January 2025
- Senior Policy Advisor, Office of the Deputy Premier, Minister for State Development, Infrastructure and Planning on 26 March 2025; and
- All documents and correspondence sent or received by any departmental staff member, between 1 January 2024 and 29 April 2025, to any internal and external parties relating to Libra Energy Pty Ltd, and its proposal for the Bremer Battery Project. This is however to exclude any correspondence sent to or from the applicant.
- Correspondence between the MID applicant or its agents and the Minister or the Department, relating to the preliminary stakeholder engagement with the surrounding community during July and August 2022; and
- Additional submissions and correspondence between the MID applicant (or its agents) and the Minister or the Department, relating to the MID application from the start of May 2023 to 30 June 2024.
- the level crossing at South Pine Road, Alderley; and
- the applicant and related companies.
- South East Queensland Regional Plan, in relation to:
- Natural environment (Biodiversity and Koala conservation); and
- Natural resources (extractive resources); and
- State Planning Policy state interests, in relation to:
- the basis on which it was determined that sites should be identified in the City Plan Environmental significance - biodiversity areas overlay map in circumstances where those areas are not mapped as Protected areas or in circumstances where they are mapped as part of the City Plan Environmental significance - vegetation management overlay map but not mapped as Regulated vegetation
- the drafting of the 'protect in situ' outcomes of the City Plan Strategic framework 3.7 Living with nature theme, the 'protected in situ' outcomes of the City Plan Environmental significance overlay code and the 'Protect in situ' administrative definition; and
- any emails, meeting notes or other correspondence between Gold Coast City Council (Council) and the Queensland Government about the City Plan protect in situ provisions and how they are intended to operate.
- The submissions made by Macmines Austasia Pty Ltd during the period 1 March 2013 to 1 April 2013 to the proposed Environmental Offset Strategy dated 7 November 2012 prepared by Biodiversity and Carbon for Adani Mining Pty Ltd in relation to the Carmichael Coal Mine and Rail Project (the Macmines Submission).
- The following documents concerning the Macmines Submissions during the period 1 March 2013 to 22 May 2019 (inclusive):
- correspondence (including electronic communication)
- all diary entries (including any electronic calendar entries and meeting makers), file notes, and minutes of meetings, between:
- the Department of State Development, Infrastructure and Planning (hereinafter the Department), or the then Coordinator-General, or any personnel of the Department, and any of:
- Macmines Austrasia Pty Ltd, or Adani Mining Pty Ltd, or Adani Mining and Resources, or Moray Downs, or Moray Downs Pastoral, or Bravus Mining and Resources.
- Any correspondence (including electronic communications) between any personnel of the Department concerning the Macmines Submissions for the period 1 March 2013 to 22 May 2019 (inclusive).
- The submissions made by Macmines Austasia Pty Ltd during the period 1 March 2013 to 1 April 2013 to the proposed Environmental Offset Strategy dated 7 November 2012 prepared by Biodiversity and Carbon for Adani Mining Pty Ltd in relation to the Carmichael Coal Mine and Rail Project (the Macmines Submission).
- The following documents concerning the Macmines Submissions during the period 1 March 2013 to 22 May 2019 (inclusive):
- correspondence (including electronic communication)
- all diary entries (including any electronic calendar entries and meeting makers), file notes, and minutes of meetings, between:
- the Department of State Development, Infrastructure and Planning (hereinafter the Department), or the then Coordinator-General, or any personnel of the Department, and any of:
- Macmines Austrasia Pty Ltd, or Adani Mining Pty Ltd, or Adani Mining and Resources, or Moray Downs, or Moray Downs Pastoral, or Bravus Mining and Resources.
- Any correspondence (including electronic communications) between any personnel of the Department concerning the Macmines Submissions for the period 1 March 2013 to 22 May 2019 (inclusive).
- All internal documents within the Planning and Development Services (Sout East Queensland (SEQ) South) that are relevant to application reference 2408-41949 SDA;
- All correspondences between the Planning and Development Services (SEQ South) and the Department of Resources that are relevant to application reference 2408-41949 SDA
- All correspondences between the Planning and Development Services (SEQ South) and the Department of Environment, Science and Innovation that are relevant to application reference 2408-41949 SDA
- All correspondences between the Planning and Development Services (SEQ South) and Logan City Council that are relevant to application reference 2408-41949 SDA
- The Mango Hill Infrastructure Development Control Plan (excluding development applications referred to State Assessment and Referral Agency)
- Proposed amendments to the Planning Regulation 2017
- The draft Planning and Other Legislation Amendment Regulation 2024
- Referencing
- 2404-39912 SRA Development Application Modification for Material Change of Use to include waste utilisation areas for an existing approved feedlot (SARAs referral reference ID: 2404-39912 SRA)
- Responses to complaints and letters to Ministers regarding
- Minister of Environment – The Honourable Leanne Linard sent 5 July 2024 with the applicant's internal reference being 90100.112591
- Minister of Water – The Honourable Glen Butcher sent 5 July 2024 with the applicant's internal reference being 90100.112626
- Murray-Darling Basin Authority – Mr Andrew McConville sent 12 July 2024 with the applicant's internal reference being 90100.112621
- The document/report prepared by Mission Housing Australia and/or Newtown QLD Pty Ltd or their consultant, Ethos Urban that addresses and/or summarises how public submissions were considered for the Ministerial Infrastructure Designation (MID) for Social Affordable Housing, Princess Street Toowoomba (MID-0524-0845)
- South Bank Corporation
- West End State School, including its Parents and Citizens’ Association (P&C association)
- Brisbane State High School, including its P&C association
- Education Queensland
- Sekisui House
- ASM Global; and/or
- Queensland Children's Hospital.
- Correspondence (including emails) and ministerial/executive briefing notes related to one or more of the following:
- Use of external consultants including the number of times consultants have been engaged since 1 January 2023 to 24 May 2024; and
- the overall cost for external consultants during that time
- The specification document (or letter of acceptance if no specification document exists) for each ongoing engagement of a consultant since 1 January 2023 to 24 May 2024; and
- Reports, briefings and/or an executive summary about the conclusions reached by each consultant for which work was finalised between 1 January 2023 and 24 May 2024.
- All documents related to the commissioning of advice, separate to the Quirk review, which led to the decision to use the Queensland Sport and Athletics Centre (QSAC) as the track and field stadium for the Brisbane 2032 Olympic and Paralympic Games, along with any reports that commissioning generated.
- Any architectural and/or artistic visual renders of QSAC in Olympics mode that have been generated in the process of venue appraisal.
- A document(s) revealing the contributions (financial or otherwise) made by Sekisui House in relation to the development application and/or decision made in relation to Decision Notice DEV2012/235
- Documents revealing or concerning the consideration, or application, of Guideline 11 for State Facilities – Primary Schools to the development application and/or decision made in relation to Decision Notice DEV2012/235
- Emails from Department of Education (DoE) to Economic Development Queensland (EDQ) with respect to school planning for the Ripley Valley Priority Development Area (PDA) and/or a specified lot
- Consultants’ advice/reports with respect to school planning for the Ripley Valley PDA (excluding all drafts or preliminary reports/advices where a final report/advice exists); and
- The most current population modelling, dwelling forecasts and/or development composition in relation to the Ripley Valley PDA (excluding outdated or superseded modelling)
- Reports
- Emails (limit to emails relating to expenses/costs)
- Ministerial briefing notes (excluding attachments, unless the attachments relate to the costs and expenditure)
- Receipts/invoices (or receipts only where there are both invoices and receipts)
- MBN23/766
- MBN23/585
- MBN23/560 (excluding attachments)
- MBN23/794 (excluding attachments)
- MBN23/621
- MBN23/780
- MBN23/691; and
- MBN23/781 (excluding attachments)
- Correspondence between the Coordinator-General and an individual regarding Glenden.
- Copy of the final report on Glenden undertaken on behalf of the Coordinator-General.
- Copies of any pre-lodgement advice notices issued
- Any minutes of meetings, relating to the State Assessment Referral Agency’s decision to issue those pre-lodgement advice notices
- All development application material submitted or referred to the Chief Executive; and
- Copies of any referral agency response or decision notice issued by the Chief Executive.
- All MBNs that were removed/redacted/excluded from the list on the basis they were exempt (including their attachments)
- MBN22/762 (excluding attachments)
- MBN23/755 (excluding attachments)
- MBN23/263 (excluding attachments)
- MBN23/745 (excluding attachments)
- MBN22/275 (excluding attachments)
- MBN23/781 (excluding attachments)
- MBN23/651 (including attachments)
- MBN23/278 (including attachments)
- MBN23/939 (including attachments)
- MBN23/794 (excluding attachments)
- MBN23/560 (excluding attachments)
- MBN23/585 (including attachments)
- MBN23/740 (including attachments); and
- MBN23/621 (including attachments).
- the Facilitation Agreement dated 2 October 2020 between CPS Hervey Bay Pty Ltd, Hervey Bay Boat Club Inc and the State of Queensland (acting through the Department of State Development, Tourism and Innovation) (but excluding the Facilitation Agreement itself)
- the proposed Marina Square Redevelopment Project at Urangan Harbour, Hervey Bay; and/or
- any proposed redevelopment of State-owned property assets within the Urangan Harbour Precinct, Hervey Bay, including Lot 135 on CP898147.
- All documents related to the inputs, assumptions and methodologies used in the Model for Urban Land Use and Transport Interaction to generate each of the regional growth scenarios (i.e. Scenarios 1, 2 and 3) in the draft ShapingSEQ 2023 Update (draft ShapingSEQ); and
- All documents related to the proposed inclusion of the Southern Thornlands Potential Future Growth Area (Southern Thornlands) in the Urban Footprint of the draft ShapingSEQ.
- audits
- investigations; and
- reviews.
- Correspondence from Queensland University of Technology (QUT) to then Minister Kate Jones in April 2020 relating to the publication of the Queen's Wharf Longitudinal Benefits and Impacts Study; and
- Departmental advice about the matter to the then Minister and any subsequent ministers.
- The options analysis for the redevelopment of the Gabba for the 2032 Olympics, that was undertaken in the second half of 2022, as part of the Project Validation Report (PVR) process.
- And the most recent version of the Project Validation Report for the Gabba as at 3 April 2023.
- Any messages, emails and records of meetings between the Deputy Premier or the Chief of Staff and representatives of Live Nation; and
- Any briefing notes prepared for any Live Nation proposals or meetings with Live Nation.
- The report produced by Deloitte regarding Olympic Games governance structures; that was used by the state government to inform the creation of a Brisbane 2032 Coordination Office (as announced on 14 March 2023); and
- The brief sent by the state government that instructed Deloitte on said report.
- Any costings documents relating to the 2032 Olympics Infrastructure program, including the plan to rebuild/renovate the Gabba and the plan for the Brisbane Arena; and
- Any correspondence about the infrastructure costings between the Department and the Prime Minister's office or the Australian Government Department of Prime Minister and Cabinet.
- new trains, shortage of trains or reduction of train services, in relation to the South East Queensland network or the Cross River Rail; and/or
- the Cross River Rail opening.
- Chief of Staff, Office of the Deputy Premier, Minister for State Development, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure on 6 December 2021
- Chief of Staff, Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning on 9 February 2021; and
- Senior Policy Advisor, Office of the Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning on 25 February 2021, 26 February 2021 and 15 March 2021
- Director-General, Department of State Development, Infrastructure, Local Government and Planning on 18 March 2021 and 16 June 2021; and
- Executive Director, Infrastructure Planning and Advisory, Department of State Development, Infrastructure, Local Government and Planning on 8 July 2021.
- Briefing notes, memos, notes of meetings and emails relating to meetings with ASM Global (or its representatives) that involved the following officers:
- Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning Director-General, Department of State Development, Infrastructure, Local Government and Planning on 16 June 2021
- Chief of Staff, Office of the Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning on 23 April 2021; and
- Chief of Staff and Senior Policy Advisor, Office of the Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning on 15 April 2021
- Any text messages between the Deputy Premier and a named officer of ASM Global/AEG Ogden from 1 January 2021 to 31 December 2022.
- All documents and communications as between Economic Development Queensland (EDQ) and Stockland or its representatives, relating to zoning in the Aura Business Park and contemplation of its use for Indoor Sport and Recreation; and
- All minutes of meetings or discussions between EDQ and Stockland or its representatives relating to planning approvals over a Lot.
- Any proposed amendments to Sunshine Coast Planning Scheme 2014
- Buddina Urban Village
- Buddina Urban Village sub precinct LPSP-4a
- State interest review of Sunshine Coast Planning Scheme 2014, any amendments, Buddina Urban Village, and Buddina Urban Village sub precinct LPSP-4a
- Assessment of Sunshine Coast Planning Scheme 2014, any amendments, Buddina Urban Village, and Buddina Urban Village sub precinct LPSP-4a, in accordance with Minister’s Guidelines and Rules, Planning Act 2016, Planning Regulation 2017
- State Interests in relation to Sunshine Coast Planning Scheme 2014, any amendments, Buddina Urban Village, and Buddina Urban Village sub precinct LPSP-4a, in accordance with State Planning Policy 2017, South East Queensland Regional Plan 2017
- Department of State Development, Infrastructure, Local Government and Planning’s review of the Sunshine Coast Planning Scheme 2014, any amendments, Buddina Urban Village, and Buddina Urban Village sub precinct LPSP-4a. Including any consultation, reviews and comments from Sunshine Coast Regional Council including any officers, councillors or other representatives.
- Any directives from the Deputy Premier or Deputy Premier’s office to the Department or Sunshine Coast Regional Council regarding the preparation of the Sunshine Coast Planning Scheme, any amendments, Buddina Urban Village, and Buddina Urban Village sub precinct LPSP-4a.
- Briefing notes provided to and memos received from the then State Development Minister, Anthony Lyneham, and then Director-General, Michael Schaumburg; and
- File notes from meetings involving Lyneham and Schaumburg.
- The Turner and Townsend independent suitability assessment advising on the least risk option for a quarantine facility in Queensland, and any department and/or ministerial briefings related to the document.
- The independent advice from the State’s quantity surveyor on the capital cost breakdown of the revised, and original, masterplan submitted by Wagner Corporation for the Queensland Regional Accommodation Centre (QRAC) at Wellcamp, and any department and/or ministerial briefings related to the document; and
- Any department and/or ministerial briefings related to alternative uses of the QRAC site for the remainder of the lease ending April 2023.
- Any and all information / submissions / applications relating to the addition of land held by the Coordinator-General (Lot 35 on SP320296, Lot 40 on SP320296, Lot 41 on SP320296, Lot 42 on SP320296 and Lot43 on SP320296) to Water Licence 620909
- Any and all information / submissions / applications / landowner consent / Coordinator-General consent relating to the purpose for Coordinator-General or others applying to have land (Lot 35 on SP320296, Lot 40 on SP320296, Lot 41 on SP320296, Lot 42 on SP320296 and Lot43 on SP320296) added to the land to which the Water Licence 620909 attaches: and
- Any and all information relating to Water Licence 620909, including but not limited to the volume of water.
- The submission made to the Coordinator-General by the Department of Transport and Main Roads (DTMR) in response to the Environmental Impact Statement for the Gowrie to Helidon section of the Inland Rail (the Submission); and
- Any related correspondence, memos or emails, relating to the Submission, between the Coordinator-General and DTMR.
- Any application to amend the proposed use plans at Sanctuary Cove lodged in May or June 2022 by or on behalf of the Primary Thoroughfare Body Corporate (PTBC) established under the Sanctuary Cove Resort Act, excluding any submissions made by interested persons to the PTBC; and
- Any other correspondence, created after 1 September 2021 and relevant to land use at Sanctuary Cove, between the Department and/or the Deputy Premier and any of the following entities:
- PTBC
- Mulpha International BHD
- Mulpha Sanctuary Cove Pty Ltd; and/or
- Mulpha Sanctuary Cove (Developments) Pty Ltd.
- The project named ‘318-324 Chambers Flat Road, Logan - ROL 1 into 60 lots’ (SARA ref.: 2105-22493 SRA; date conditioned 11 June 2021); and
- The project named ‘45-57 Kanimbla Street, Holmview’ (SARA ref.: 2111-26140 SRA; date conditioned 7 December 2021).
- Operational work for prescribed tidal works Dungeness Breakwater and dredging; and
- Material change of use for an environmentally relevant activity (ERA 16) - (Dredging in waters adjacent to land described as Lot 540 on SP291542 and located at Dungeness Road, Lucinda.
- Any and all information / submissions / applications relating to the addition of land held by the Coordinator-General (Lot 35 on SP320296, Lot 40 on SP320296, Lot 41 on SP320296, Lot 42 on SP320296 and Lot43 on SP320296) to Water Licence 620909; and
- Any and all information / submissions / applications / landowner consent / Coordinator-General consent relating to the purpose for Coordinator-General or others applying to have land (Lot 35 on SP320296, Lot 40 on SP320296, Lot 41 on SP320296, Lot 42 on SP320296 and Lot43 on SP320296) added to the land to which the Water Licence 620909 attaches.
- Department of State Development, Infrastructure, Local Government and Planning
- the Deputy Premier, or any staff member of the Deputy Premier’s office
- Queensland Health
- the Chief Health Officer; and/or
- Wagner Corporation.
- duplicates of any documents that were provided to staff in an all-staff email that was sent by the Deputy Director-General, Corporate on 20 January 2022 regarding implementation of the policy; and
- extracts of the body text of consultation feedback emails.
- The Early Works Deed provided by the Coordinator-General to Carmichael Rail Network (CRN) that relates to Lot 4 SP315414 Title Reference 51262104; and
- The Authority to Construct provided by the Coordinator-General to CRN that relates to Lot 4 SP315414 Title Reference 51262104.
- Correspondence from the Honourable Cameron Dick MP, then Treasurer and Minister for Infrastructure and Planning to the Chief Executive Officer, Redland City Council on 23 July 2020; and
- Correspondence from the Honourable Steven Miles MP, then Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning to Chief Executive Officer, Redland City Council on 24 June 2021.
- correspondence sent to or from Martha’s Farm Pty Ltd
- emails and invoices concerning payment of fees for services by consultants.
- All interactions regarding any and all discussions about the Wanless Recycling Park at Ebenezer (that is proposed to be called in) between the Deputy Premier and:
- waste company Wanless
- lobby company Anacta Strategies
- lobbyist Evan Moorhead; and
- a named individual; and
- Any interactions with the Minister's Chief of Staff or other staff as a consequence of the Chief of Staff or other staff meeting with either waste company Wanless, lobby company Anacta Strategies, lobbyist Evan Moorhead or the named individual regarding any and all discussions about the Wanless Recycling Park at Ebenezer.
- All interactions regarding any and all discussions about the Wanless Recycling Park at Ebenezer (that is proposed to be called in) between the Deputy Premier and:
- waste company Wanless
- lobby company Anacta Strategies
- lobbyist Evan Moorhead; and
- a named individual; and
- Any interactions with the Minister's Chief of Staff or other staff as a consequence of the Chief of Staff or other staff meeting with either waste company Wanless, lobby company Anacta Strategies, lobbyist Evan Moorhead or a named individual regarding any and all discussions about the Wanless Recycling Park at Ebenezer.
- any minister, including the Deputy Premier
- Ministerial employees, advisors and internal or external consultants; and/or
- Departmental employees, advisors and internal or external consultants.
- any Minister, including the Deputy Premier
- Ministerial employees, advisors and internal or external consultants; and/or
- Departmental employees, advisors and internal or external consultants.
- publicly available documents published on the State Assessment Referral Agency website and/or Council’s PD Online portal; and
- repeat copies of the ‘bulk letter’ about the proposed call-in sent to each of the 60 submitters in relation to the proposed call-in of the development.
- waste company, Wanless
- lobby company, Anacta Strategies
- lobbyist, Evan Moorhead; or
- a named individual.
- All documents held by Coordinator-General, Economic Development Queensland and Legal Services, created between 1 September 2021 and 1 November 2021, in relation to the proposed acquisition of land at Currumbin owned by Martha’s Farm Pty Ltd (including the compulsory land acquisition initiated by the Notice of Intention to Resume (NIR) that was issued to Martha’s Farm Pty Ltd)
- The document(s) revealing the most recent costings / budget for the proposed Eco-park
- Details of the number of registrations/subscriptions for project updates/information, and any questions raised and answers provided to interested parties, for the Currumbin Eco-Parkland Project, through the website ‘haveyoursay.dsdilgp.qld.gov.au/currumbin-eco-parkland’.
- documents regarding Economic Development Queensland's planning and decision-making process for the proposed amendments to the Scheme, including in relation to any consideration of potential changes to Scheme requirements for other land within the PDA, or impacts of the proposed changes on other land within the PDA
- documents regarding the planning and decision-making process for proposed amendments to the DCOP, including changes to infrastructure requirements and charges associated with the Olympic Athlete's Village
- documents regarding funding for the development of the Olympic Athlete's Village
- master plans prepared by Archipelago Architects.
- A memorandum of understanding between the Queensland Government and Wagner Corporation in relation to the Wellcamp quarantine facility.
- The initial head of agreement, and additionally the joint agreement, between the Queensland Government and the Wagner Corporation in relation to the Wellcamp quarantine facility.
- The letter of intent between the Queensland Government and Wagner Corporation in relation to the Wellcamp quarantine facility.
- The value of the contract/agreement between the Queensland Government and the Wagner Corporation in relation to the Wellcamp quarantine facility; and
- The estimated cost of the Wellcamp quarantine facility.
- Ministerial/executive briefing notes, correspondence (including emails) and reports relating to new staff members who were appointed, between 1 July 2020 and 15 September 2021, to work in or for one or more of the following:
- the Premier's office
- the department, as media/communications officers; or
- the Digital team/unit headed by Emily Arlidge (the Digital team).
- A list of current staff members employed by the department (including staff on secondment) who, as at 15 September 2021, currently work for either:
- the Premier's office
- the department, as a media/communications officer; or
- the Digital team.
- duplicates
- documents that have already been publicly released
- names of any staff under Senior Officer (SO) level, telephone numbers and emails
- final threads of email conversations.
- All correspondence between the Department and a named individual (a member of the public), in connection with Development Permit for the Mount Emerald Wind Farm, from the period commencing 1 January 2010; and
- All reports, memoranda, correspondence and emails in relation to the Department's consideration of the approved amendment made to the Development Permit for the Mount Emerald Wind Farm made on 14 March.
- All documents relating to the proposed resumption of 107 Piggabeen Road, Currumbin Waters, being Lot 247 RP854934, Lot 1 RP854934, Lot 2 RP168012 (the Land); and
- All documents relating to the preparation of Revision C of the document titled ‘Currumbin Eco-Parkland – Final Phase 1 Deliverables – Draft Master Plan’ dated June 2021 (but not including the document itself, or Revisions A or B of that document).
- Any briefing notes between Economic Development Queensland (EDQ) officers and the Minister up until 30 August 2021 concerning the Eco-Parkland and/or proposed acquisition of the site (EDQ involvement is understood to have commenced in or around December 2020 / January 2021)
- The EDQ Project Assessment / Site Investigation and Options Paper regarding the site
- Briefing notes or other documentation between EDQ, the Minister and Office of Coordinator-General that are a record of the decision to proceed with issuing a Notice of Intention to Resume (NIR), and any documents which informed the Coordinator-General’s decision-making about using the Coordinator-General under the State Development and Public Works Organisation Act 1971
- In relation to any valuation(s) obtained for the proposed site for the Eco-Parkland, the request/briefing for the valuation, supporting documentation given to the valuer and the final valuation report/advice (a valuation is believed to have been commissioned by EDQ in or around April / May 2021)
- Any budget/costings prepared for the Eco-Parkland; and
- Any document relating to the proposed Currumbin Eco-Parkland authored by, or submitted to government by or on behalf of, Friends of Currumbin.
- duplicates
- executive council documents
- documents subject to parliamentary privilege and Cabinet documents
- draft documents, as well as emails solely dealing with preparation of draft documents (such as draft briefing notes and emails)
- reply emails that simply communicate thanks
- correspondence sent to or from representatives of Martha’s Farm Pty Ltd
- documents that have already been provided to representatives of Martha’s Farm Pty Ltd; and
- documents that are publicly available.
- The following documents relating to Gympie Regional Council’s (GRC) proposed or actual mapping methodology for MSES (Koala Habitat) in the GRC Temporary Local Planning Instrument 02/19 - Southside Structure Plan Area (TLPI 02/19) and Temporary Local Planning Instrument 03/19 - Protection of Biodiversity values (TLPI 03/19):
- Significant Risk in Southside Structure Plan Area (including maps)
- Significant Risk in Whole of Gympie Region (including maps); and
- Correspondence between GRC and the department, between 8 December 2020 and 17 August 2021, in relation to the decision to repeal TLPI 02/19 and/or TLPI 03/19.
- ministerial briefings and attachments
- reports
- audits
- reviews relating to reimbursements and/or reconciliation claims
- credit card statements (also include credit card statements of the credit card held by the Director-General’s executive assistant); and
- emails of the actual reimbursement claim, which would also include whether it was approved or not.
- The package of information/all supporting documents sent from Gympie Regional Council (GRC) to the Planning Group of the Department (Planning Group) or the Planning Minister demonstrating the significant risk to koalas and biodiversity, which informed the Department's assessment of GRC Temporary Local Planning Instrument 02/19 - Southside Structure Plan Area (TLPI 02/19) andTemporary Local Planning Instrument 03/19 - Protection of Biodiversity values ( TLPI 03/19)
- Correspondence (letters and emails) between GRC and Planning Group or the Planning Minister in relation to GRC’s proposed or actual mapping methodology for MSES (Koala Habitat) in the TLPI(s); and
- Correspondence (letters and emails) between GRC and Planning Group or the Planning Minister relating to the decision to repeal TLPI 02/19 and/or TLPI 03/19.
- All documents relating to Lease No TL 0/2207 40 on Title Reference 40041787 with the State of Queensland as Lessor, and Brisbane River Pty Ltd as Lessee (the Lease)
- All documents relating to the licencing and/or any other authorisation of commercial activities on the Leased Land under the Lease
- All documents relating to applications or notifications by the Lessee, external parties including town planners, restaurants, retail and other commercial operators in and around the leased area under the Lease in the context of commercial operations being conducted on the leased land under the Lease
- All enquiries, complaints or other contact by any party with the Department in regards to commercial activities conducted on or around the Lease.
- All documents relating to the current use and condition (if any) of the following easements:
- Easement No K444198H over part of Lot 2 on RP 807312 (Easement B)
- Easement No K444198H over part of Lot 2 on RP 8073134 (Easement D)
- Easement No K444204M over part of Lot 2 on RP 809083 (Easement LL); and
- All enquiries, complaints or other contact by any party with the Department in regards to commercial activities conducted on or around any of Easement B, Easement D or Easement LL.
- the final email of any email chain and any one-off emails (as applicable); and
- where an email forming part of a relevant email chain contained an attachment(s) that is not enclosed in the final email, the email containing the attachment(s).
- All correspondence between Australia Country Choice Production Pty Ltd, Cannon Hill Investments, a named individual, or their agents and the Department of State Development Infrastructure Local Government and Planning; and
- The record of the decision to make Brisbane City Council Temporary Local Planning Instrument No. 2 of 2021 (Colmslie Road Industry Precinct).
- Briefing notes (final approved versions only) relating to one or more of the following issues:
- delays,
- rail network closures,
- compliance issues,
- cost blowouts; and
- Correspondence and audits, held by Deputy Directors-General and equivalent or higher-level officers, relating to one or more of the following:
- cost,
- staffing; or
- misconduct issues.
- event/meeting briefing notes
- documents that are produced for the purpose of Cabinet or Parliament
- media reports/articles/releases; and
- correspondence with media.
- the Rivermakers Project, 500 Lytton Road, Morningside owned by Dunhill Properties; and/or
- any complaints about the Tenants at these premises.
- initially submitted to the Mareeba Shire Council and/or the Tableland Regional Council; and
- later subject to a ministerial call-in by Jackie Trad on 11 June 2014, with the approval being granted on 24 April 2015 and various amendments being made thereafter on 18 December 2015, 31 January 2017 and 14 March 2018.
- initially assessed and approved on 24 April 2015; and
- as subsequently assessed and amended by the Minister on 18 December 2015 and 31 January 2017.
- email and briefing note attachments
- duplicates
- documents that have already been publicly released
- media reports/statements/articles and correspondence with media.
- email and briefing note attachments
- duplicates
- documents that have already been publicly released
- media reports/statements/articles and correspondence with media.
- Application forms and covering letters, Initial Advice Statements and all documents that provided information about the project to allow the Coordinator-General to consider the matters mentioned in section 27(1)(b) to (f) and (2) of the State Development and Public Works Organisation Act 1971 for the project; and
- Responses to all queries from the Coordinator-General to requests for further information.
- Any and all documentation relating to the Approval of Temporary worker’s Accommodation (Camp) for five hundred (500) persons on Stratford, more properly described as: Lot 3821 on PH 1304
- Any approval /permit provided by Coodinator-General in relation to the Camp; and
- Any conditions or approvals in relation Camp.
- Brisbane City Council decisions, conduct etc regarding the Old Newmarket Brickworks site
- The Old Newmarket Brickworks site; and
- Requests for action such as meetings, investigations etc (in relation to one or more of the above matters).
- Affordable or social housing; or
- Stockwell site known as the Noosa Shire Business Centre; or
- Coles site at Noosa Junction.
- The notice given by Noosa Shire Council (the local government) under section (18)(2) of the Planning Act 2016 on 30 July 2020 relating to a proposed amendment to the Council's planning scheme relating to Coastal Erosion; and
- The communications strategy, Community Engagement and Communications Plan for: Noosa Plan 2020 Amendment— Coastal Erosion.
- The Ganden Report on the sewerage system at Port Hinchinbrook, Cardwell.
- The brief provided to Ganden which was used to define the scope of the report.
- A briefing note written by the Deputy Director-General, Corporate discussing the future of Tourism and Events Queensland.
- Documents discussing a recommendation in a briefing note written by the Deputy Director-General, Corporate regarding the future of Tourism and Events Queensland.
- All correspondence that the Department of State Development, Tourism and Innovation has had with John Wagner and any of the Wagner representatives regarding the funding of the Entertainment Precinct being proposed at their Wellcamp Airport site.
- Correspondence regarding the $40 million pledge that the government has made for the construction of the entertainment precinct project.
- Documents regarding the relocation from the original site to the current proposed site and any details around the support for ‘change of use’ and zoning of this agriculture land that the Wagners have or are in the process of precuring to that of commercial.
- Documents regarding the design details of the project.
- Advice by the department to the Planning Minister (Jackie Trad) on plans for and/or the proposed ministerial call-in of the West Village development (a development application by Uniacke Pty Ltd at 111 Boundary Street, 26 and 26A Little Jane Street, 19-23 Mollison Street, West End and 37 Mollison Street, South Brisbane).
- Briefing papers created by the department regarding plans for/the proposed call-in of West Village.
- Emails and correspondence with Somerset Regional Council regarding Somerset Regional Planning Scheme – Proposed Major Amendment Version 4
- The Minister's copy of the Somerset Regional Planning Scheme – Proposed Major Amendment Version 4 that the Minister received and approved.
- Emails and correspondence with Somerset Regional Council regarding Somerset Regional Planning Scheme – Proposed Major Amendment Version 4
- The Minister's copy of the Somerset Regional Planning Scheme – Proposed Major Amendment Version 4 that the Minister received and approved.
- Application forms and covering letters, Initial Advice Statements and all documents that provided information about the project to allow the Coordinator-General to consider the matters mentioned in section 27(1)(b) to (f) and (2) of the State Development and Public Works Organisation Act 1971 for the project; and
- Responses to all queries from the Coordinator-General to requests for further information.
- The State Assessment Referral Agency (SARA) assessment report for a property in Minyama, Queensland.
- Any council report(s) for a pontoon application for a property in Minyama, Queensland.
- Expert advice relating to threatened species at Meadowbank Station; and
- Correspondence with the proponent or their consultant regarding threatened species and the High Value Agriculture (HVA) permit (DGBN16/1034, SDA-0315-018836).
- The Facilitation Agreement between the State and Dexus for the Waterfront Brisbane development.
- Any associated agreement, plans or other documents which are either referenced in the text of the Facilitation Agreement or which separately relate to this Facilitation Agreement such as subsequent agreements (in whatever form) made under, or as a consequence of, the Facilitation Agreement.
- the ministerial call-in development approval and preliminary approval dated 27 November 2006; and
- development approval for permissible change dated 8 October 2013 approving reduction of the development yield from 527 dwellings to 348 standard format lots under a Community Title Scheme (reference MC13/2931).
- Documents referring to a material change of use (MCU) application lodged with Moreton Bay Regional Council.
- Documents referring to the North South Urban Arterial (NSUA) and/or the Moreton Connector and properties during the period 1 March 2016 to 27 April 2020.
- Documents created in the last 12 months which record any decisions made to proceed with construction of the NSUA and/or the Moreton Connector, or documents recording the DSDMIP’s intent to proceed (or not to proceed) with the construction of the NSUA and/or the Moreton Connector.
- South East Queensland (SEQ) Regional Plan 2005 - 2026 (including maps) and the associated SEQ Regional Infrastructure Plans and Programs
- SEQ Regional Plan 2009 – 2031 (including maps)
- Internal and/or external documents in respect of the zoning and/or planning intent for the applicant’s property having regard to the SEQ Plans; and
- Communications studies, advice and documents between the former Department of State Development, Manufacturing, Infrastructure and Planning and Logan City Council, regarding identification and selection of the Land for the Logan South Wastewater Treatment Plant B (LSWTPB), specifically, preference for location of the LSWTPB on the Land, buffer zones, setbacks and State planning advices and controls.
- South East Queensland (SEQ) Regional Plan 2005 - 2026 (including maps) and the associated SEQ Regional Infrastructure Plans and Programs
- SEQ Regional Plan 2009 – 2031 (including maps)
- Internal and/or external documents in respect of the zoning and/or planning intent for the applicant’s property having regard to the SEQ Plans; and
- Communications studies, advice and documents between DSDMIP and Logan City Council, regarding identification and selection of the Land for the Logan South Wastewater Treatment Plant B (LSWTPB), specifically, preference for location of the LSWTPB on the Land, buffer zones, setbacks and State planning advices and controls.
- The last five reports about pre-lodgement water infrastructure projects; and
- Briefing notes created between 1 November 2019 and 5 February 2020 containing a collation of water infrastructure projects with their current status.
- Any cabinet permission of exemption of this LEB review from an RIS, before the closing date of the review
- Any preliminary impact statement prepared by the departments, of this LEB review before the closing date of the review
- Any regulatory Impact Statement prepared by the departments, of this LEB review before the closing date of the review
- Any regulatory impact exemption prepared by the departments, of this LEB review before the closing date of the review
- All planning processes and consultation undertaken between the department and DES and stakeholders.
- The Noosa Shire Council's request to the Minister in a letter dated 12 December 2019 to adopt the proposed planning scheme but without attachments.
- The Department’s request to the Noosa Shire Council for further information and notification of the pausing of the timeframe given by email to the Council on 23 December 2019.
- Briefing note about the draft Planning scheme without attachments sent from the Director-General of the Department to the Minister on 14 February 2020.
- Correspondence between the Noosa Shire Council and the Minister or the Minister's office regarding the draft Noosa Planning Scheme.
- Any reports, advice or memoranda from the Planning unit of the Department to the Minister or the minister's office about the draft Noosa Planning scheme and its integration of State Interests or its inclusion of changes, after public consultation, which may be significant.
- All reports, findings, correspondence and memos prepared by the Crime and Corruption Commission (CCC), and submitted to the Department of State Development, Manufacturing Infrastructure and Planning (the Department), in relation to a complaint made by the applicant.
- All reports, findings, correspondence letters and memos prepared by the Department, and submitted to the CCC, in relation to a complaint made by the applicant.
- The full report, findings and recommendations that the Department has compiled to develop its conclusions summarised in a letter to the applicant.
- Advice and/or report prepared by the department in response to an internal investigation.
- Correspondence between Noosa Shire Council and the department about the draft Noosa Planning scheme.
- Internal correspondence between officers of the department about the draft Noosa Planning Scheme.
- File notes, memoranda by officers of the department relating to a review of the scheme to verify the integration of State interests and if there were any significant changes made after public notification.
- Documentation outlining the planning process for the Greater Brisbane Greyhound Centre, including Queensland Government justifications for the development
- Documentation outlining consultations undertaken with animal welfare experts as part of planning for the Greater Brisbane Greyhound Centre
- Documentation outlining consultation undertaken with engineering experts as part of the planning process
- Documentation outlining the Queensland Government’s proposed plans to improve greyhound animal welfare as part of the development
- Documentation outlining the Queensland Government’s proposed plans to improve oversight of the state's greyhound racing industry as part of the development (e.g. increased Government controls over animal welfare checks, increased control over drug testing); and
- Documentation outlining any concerns and obstacles identified by the Queensland Government as part of the planning process (e.g. ongoing greyhound deaths at current racetracks, protests from animal rights activists).
- All changes and amendments (from the published 2014 Environmental Impact Statement) to the Sunshine Coast Airport Expansion Project (SCAEP), submitted to the Office of Coordinator-General by Sunshine Coast Council, Sunshine Coast Airport, Sunshine Coast Airport Pty Ltd, and/or Sunshine Coast Airport Expansion Project Team
- All responses/replies from the Office of the Coordinator-General and/or departments responsible for project oversight concerning the above changes and amendments.
- cover emails for Parliamentary briefing notes
- parliamentary briefing notes
- attachments to Parliamentary briefing notes.
- all shortlisting documents
- successful applicant’s resume and statement addressing the selection criteria, with or without any covering letter
- election panel report recommending successful candidate.
- any new proposed development application(s) that is/are proposed to be lodged with the Brisbane City Council (excluding previous applications made in 2014)
- any proposal of the Brisbane City Council or another entity to purchase or resume 600 Coronation Drive, Toowong, either in whole or in part; and
- the proposed ‘green’ bridge connecting 600 Coronation Drive, Toowong with West End insofar as it relates to 600 Coronation Drive, Toowong.
- all current and proposed property leases and/or documents revealing current and proposed lease arrangements under negotiation inclusive of all correspondence between the two parties in relation to this matter
- documents confirming payments under the current leases for the past 5 years
- any applications and or approvals (such as material change of use) in relation to the properties that are not on public display on the EDQ website
- any appraisals commissioned and obtained by EDQ to ascertain the market value of rental applicable to the current and proposed leases.
- In relation to Brisbane City Council's (Council) Major Amendment Package H (Amendment Package H) to Brisbane City Plan 2014, correspondence exchanged between the Department of State Development, Manufacturing, Infrastructure and Planning (DSDMIP) and Council relating to Amendment Package H:
- about the DSDMIP's decision to put pause notices on Amendment Package H in or around September 2018 and again in January 2019
- in relation to the DSDMIP’s decision to allow Amendment Package H to progress to public notification
- comprising internal memorandum and internal correspondence about the consistency of Amendment Package H with the South East Queensland Regional Plan 2017; and
- In relation to Council's proposed Temporary Local Planning Instrument 01/19 (TLPI 01/19) relating to townhouses in low density areas:
- the draft TLPI 01/19; and
- all correspondence exchanged between the DSDMIP and Council relating to TLPI 01/19.
- the Minister
- the Chief of Staff
- any other staff member of the Office of the Minister; and/or
- the Department Liaison Officer.
- South East Queensland Regional Plan 2005–2026
- South East Queensland Regional Plan 2009–2031
- South East Queensland Regional Plan 2017 (ShapingSEQ); and
- Gold Coast City Plan, which commenced on 2 February 2016.
- The development application and subsequent approval given to the City of Gold Coast in relation to the Tugun to Bilinga Oceanway.
- Environmental and Statutory approvals given by the Director-General as assessment Manager Code Assessable Development.
- Development Permit for operational work, vegetation clearing.
- All information regarding the offering of berths within Lot 8 on Crown Plan 895066 for lease in or around 1994 (including leases for 28 year terms), whether any such leases were granted, and if so, the terms of those leases
- All information regarding the lease between Port Binnli Pty Ltd and the State of Queensland dated 24 December 1996; and
- All information regarding the use of Lot 8 prior to the construction of Raby Bay Marina in or around 1994 (e.g. commercial fishing lease, special lease for development purposes etc).
- All material relating to the construction of the Coomera Indoor Sports Centre but limited to the construction of the gymnastic pits inside the centre.
- All material relating to the discovery of water inside the gymnastic pits in or around December 2017 and the subsequent rectification works involving plumbing and waterproofing.
- projects which the Coordinator-General has approved against any departmental advice; and/or
- projects that have not yet been decided on.
- the land at 33 Bridgeport Drive, North Lakes, Queensland (described as Lot 2 on SP291250 and Lots 1, 3-6 on SP148201)
- the closure of the North Lakes Resort Golf Course (otherwise known as the North Lakes Golf Course); and/or
- the redevelopment of the North Lakes Golf Course.
- The report(s) produced out of the tender contract referred to as ‘Critique/Analysis/Qualitative/Review of the assessment quality for particular correspondence delivered at key statutory functions, under management directives undertaken by the State Assessment Referral Agency (SARA)’; and
- Any documents commenting about the research.
- The business case supporting the grant of $7.5m to enable construction of the Rheinmetall NIOA Munitions (RNM) Forging and Manufacturing facility at Maryborough, Queensland.
- Details of the relationship between the forging ability for shell cases of 155mm and the ADF projects Land 17 and Land 400, specifically - which phase of Land 400 is proposed to be supported by the new facility noting that Defence owns facilities in Benalla, Victoria with similar capabilities.
- Details of correspondence between the Department of State Development, Manufacturing, Infrastructure and Planning and the Australian Government Department of Infrastructure, Regional Development and Cities that show the ratio of Queensland Government and federal government funding was derived and agreed.
- The report produced out of the contract awarded to Pricewaterhouse Coopers (PwC) for the contract titled ‘Independent review is to examine and report on the efficiency and effectiveness of the Department’; and
- Any documents commenting about the research.
- The report produced out of the tender contract for a ‘Review of the Building our Regions (BoR) grant program’
- All documents sent to Deputy Directors-General, the Director-General and/or Executive Leadership Team about the report findings.
- the state interest coastal environment within the State Planning Policy, 2017
- the state interest natural hazards, risk and resilience within the State Planning Policy, 2017, only for the state interest policies that relate to erosion prone areas; or
- the state interest liveable communities within the State Planning Policy, 2017, only for the state interest policy ‘vibrant places and spaces, and diverse communities that meet lifestyle needs are facilitated by supporting a range of formal and informal sporting, recreational and community activities’ (policy (2)(f)).
- Final reports and studies commissioned by the state government concerning the proposed cruise ship terminal at the Southport Spit and related issues of transport, environment and/or finance
- The report commissioned by the department into the proposed cruise ship terminal that was supplied to the City of Gold Coast (Council).
- draft documents
- documents commissioned by, or supplied by, Council; and
- reports and studies about The Spit Masterplan.
- The application made by the Townsville City Council to the Minister for Local Government Main Roads and Racing to close of parts of two roads (Yule St and The Esplanade) to establish a mall for a trial period of 12 months. This application was made in 1985 under the Land Act 1936 and the approval was granted by His Excellency the Governor on the 27 June 1985. This application would have been made sometime in 1985 and should contain plans of the proposed mall and include the grounds for establishing a mall, objections, restrictions for traffic and exemptions; and
- The application made by the Townsville City Council to close parts of two roads (Yule Street and The Esplanade) for the establishment of proclamation of a permanent mall. This application was made around April 1986 and should include plans of the proposed mall, objections etc and grounds for the establishment of the mall.
- All notices, communications and correspondence between the Department of State Development, Manufacturing Infrastructure and Planning (DSDMIP) and:
- A named individual
- RMA Engineers
- iCubed Consulting
- Risen Energy (Australia) Pty Ltd
- Yarranlea Solar Pty Ltd
- Sedl Earthmoving Pty Ltd
- the Department of Environment and Science
- the Department of Agriculture and Fisheries
- the Department of Natural Resources, Mines and Energy; and/or
- the Toowoomba Regional Council,
- the construction of a ring tank on a property
- approval in respect of any extractive activity or works on a property
- development application 1708-906 SDA (Department of Local Government Infrastructure and Planning reference)
- any other applications, approvals or authorities in respect of works and/or activities on any of the following lots:
- Lot 2 on A34925
- Lot 3347 on A341649
- Lot 2 on RP18249
- Lot 2 on RP7475
- Lot 2 on RP18242
- All internal documents regarding the matters referred to at paragraph 1 above
- All notes in respect of the Period relating to any meetings, conferences and/or teleconferences between the DSDMIP and any of the parties listed at paragraphs 1 above regarding the matters referred to above
- Correspondence (including emails and text messages) between Minister Hinchliffe’s office (Minister Hinchliffe and/or Chief of Staff only) and Jackie Trad’s office (Jackie Trad and/or Chief of Staff only), sent or received between 20 August 2018 and 22 October 2018, in relation to:
- The point of consumption tax (also known as betting tax)
- The racing industry’s industrial action / strike action; and
- Correspondence (including emails and text messages) between Minister Hinchliffe’s office (Minister Hinchliffe and/or his Chief of Staff only) and racing industry representatives, sent or received between 20 August 2018 and 22 October 2018, in relation to:
- The point of consumption tax (also known as betting tax)
- The racing industry’s industrial action / strike action.
- The internal assessment report(s) (or similar, however named)
- All briefing information to the Coordinator-General (CG), or the CG’s delegate; and
- Correspondence between Department of Environment and Science (DES) and the CG or the Department of State Development that relates to any further assessment or advice by DES about Adani’s response to the information request concerning Terminal 1 (APC2017/011).
- North Galilee Basin Rail Project; and
- Carmichael Coal Mine and Rail Project.
- all directions handed down by the State re its review of the MBRC planning scheme
- all correspondence (i.e. emails, meeting notes, telephone notes etc) between the State and MBRC re its review and consideration of the planning scheme
- any correspondence re any issues with the MBRC planning scheme, such as areas of non-compliance with planning policy or state legislation
- any requirements from the State to alter or amend the planning scheme
- any instructions from the State that it was not prepared to accept the planning scheme amendment in its current form; and
- the current status of the planning scheme amendment.
- any staff members of either of Regional Economic Development or Cabinet Services; or
- the Office of the Minister for State Development, Manufacturing Infrastructure and Planning and any staff member of either of:
- Regional Economic Development; or
- Cabinet Services.
- The final report/Strategy and any drafts
- All correspondence between the department and GHD about the contents of the report/Strategy
- Correspondence providing the report/Strategy to the department
- All briefing notes relating to the report/Strategy
- All assessments/reviews of the report/Strategy by the department.
- All documents created between 8 December 2017 and 24 September 2018 relating to the proposed City of Gold Coast Temporary Local Planning Instrument No. 5 (Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5); and
- All documents relating to proposed City of Gold Coast Temporary Local Planning Instrument No. 6 (Development in the Guragunbah flood plain area) 2018, which the City of Gold Coast resolved to adopt on or about 28 August 2018.
- All submissions, formal or informal, made by the Department of Transport and Main Roads (DTMR) in relation to The Mackay, Isaac and Whitsunday Regional Plan (finalised in February 2012), including the draft of The Mackay, Isaac and Whitsunday Regional Plan, or the proposed Mackay, Isaac and Whitsunday Regional plan even before its draft state.
- Notes of any meetings with DTMR representatives whereby suggestions or submissions were made by any of those representatives.
- Initial/stage 1 and final assessment outcomes
- Any correspondence to and from ministers/ministerial offices/the Market-led Proposals Panel relating to progress of the two market-led proposals; and
- Any correspondence to and from the department relating to progress of the market-led proposals.
- any communications or records relating to the funding application submitted by the Carpentaria Shire Council in respect of the Glenore Weir Raising Project or otherwise
- any communications or records relating to the evaluation of the applications for funding
- details of any internal guidelines utilised internally by the funding body when evaluating the applications for funding
- the amount of funds that were distributed under the Community Resilience Fund were distributed for 2015/2016 to each recipient for each project (but not the identity of the recipient or identifying details of the project)
- the date that the funds were distributed to each recipient
- details of the amount of funding that was available under the Community Resilience Fund; and
- whether the total amount of funding available was distributed to the applicants of the Community Resilience Fund.
- any correspondence (including electronic communications) between the Regional Economic Development section of the department and any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation) and all attachments to such correspondence
- all diary entries, file notes, and minutes of any meetings attended by the Acting Deputy Director-General, Regional Economic Development or the Department Liaison Officer, with any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation); and
- any correspondence (including electronic communications) between any staff of the Regional Economic Development section of the Department regarding any of the organisations listed in Schedule 1 below and all attachments to such correspondence.
- the Imperium3 consortium; or
- Magnis Resources Limited; or
- CV4 LLC; or
- Boston energy and Innovation; or
- Siemens; or
- Celgard; or
- Probuild; or
- Norman Young and Disney; or
- Ausenco; or
- WT Partnership; or
- Eastman Kodak; or
- C & D Assembly.
- any correspondence (including electronic communications) between the Regional Economic Development section of the department and any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation) and all attachments to such correspondence
- all diary entries, file notes, and minutes of any meetings attended by the Acting Deputy Director-General, Regional Economic Development or the Department Liaison Officer, with any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation); and
- any correspondence (including electronic communications) between any staff of the Regional Economic Development section of the Department regarding any of the organisations listed in Schedule 1 below and all attachments to such correspondence.
- the Imperium3 consortium; or
- Magnis Resources Limited; or
- CV4 LLC; or
- Boston energy and Innovation; or
- Siemens; or
- Celgard; or
- Probuild; or
- Norman Young and Disney; or
- Ausenco; or
- WT Partnership; or
- Eastman Kodak; or
- C & D Assembly.
- any correspondence (including electronic communications) between the Regional Economic Development section of the department and any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation) and all attachments to such correspondence
- all diary entries, file notes, and minutes of any meetings attended by the Acting Deputy Director-General, Regional Economic Development or the Department Liaison Officer, with any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation); and
- any correspondence (including electronic communications) between any staff of the Regional Economic Development section of the Department regarding any of the organisations listed in Schedule 1 below and all attachments to such correspondence.
- the Imperium3 consortium; or
- Magnis Resources Limited; or
- CV4 LLC; or
- Boston energy and Innovation; or
- Siemens; or
- Celgard; or
- Probuild; or
- Norman Young and Disney; or
- Ausenco; or
- WT Partnership; or
- Eastman Kodak; or
- C & D Assembly.
- any correspondence (including electronic communications) between the Regional Economic Development section of the department and any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation) and all attachments to such correspondence
- all diary entries, file notes, and minutes of any meetings attended by the Acting Deputy Director-General, Regional Economic Development or the Department Liaison Officer, with any of the organisations listed in Schedule 1 below (regardless of with whom within the applicable organisation); and
- any correspondence (including electronic communications) between any staff of the Regional Economic Development section of the Department regarding any of the organisations listed in Schedule 1 below and all attachments to such correspondence.
- the Imperium3 consortium; or
- Magnis Resources Limited; or
- CV4 LLC; or
- Boston energy and Innovation; or
- Siemens; or
- Celgard; or
- Probuild; or
- Norman Young and Disney; or
- Ausenco; or
- WT Partnership; or
- Eastman Kodak; or
- C & D Assembly.
- ministerial, Director-General or departmental briefing notes and attachments
- internal correspondence (including emails) to the Director-General and/or Deputy Directors-General
- reports; and
- audits
- duplicates
- documents that have already been publicly released
- media statements, media reports, media articles and any correspondence with media.
- Briefing notes provided to the Minister for Local Government with the first and second show cause notices issued to Ipswich City Council; and
- Any other briefing notes about the Ipswich City Council.
- All documents that record the basis upon which the Queensland State Development Authority (or iterations of it) set the price of land at $5.50 per square metre for the following transactions:
- Lot 2 - SP228454, sold for $15,152,500 incl GST on 3 February 2009
- Lot 3 - SP228454 sold for $13,398,000 incl GST on 18 August 2009; and
- Lot 6 - SP181595, sold for $8,717,500 incl GST on 11 December 2009 (collectively the Curtis Island Sales)
- All correspondence and/or notes of discussions between the Queensland State Development Authority (or iterations of it) and:
- QCLNG Land Pty Ltd with respect to Lot 2 - SP228454, sold for $15, 152,500 incl GST on 3 February 2009
- Australia Pacific LNG Pty Ltd with respect to Lot 3 - SP228454 sold for $13,398,000 incl GST on 18 August 2009; and
- Arrow CSG (Australia) Pty Ltd with respect to Lot 6 - SP181595, sold for $8,717,500 incl GST on 11 December 2009 which records, relates to or otherwise demonstrates the basis for fixing the sales price and rate per m2.
- All correspondence and/or notes of discussion between the Queensland Valuer-General and his office, and the Queensland State Development Authority (or iterations of it) regarding the price and value of the Curtis Island Sales between 2009 and 2017.
- Correspondence (including electronic communications) between the Minister for State Development, Manufacturing, Infrastructure and Planning (the Minister) and Societe Miniere de Sud Pacifique (SMSP) and all attachments to such correspondence
- All diary entries, file notes, and minutes of any meetings attended by the Minister with named representatives of SMSP; and
- Any correspondence (including electronic communications) between the Minister and named representatives of SMSP and all attachments to such correspondence.
- Correspondence (including electronic communications) between the Department of State Development, Manufacturing, Infrastructure and Planning (the Department) and Societe Miniere de Sud Pacifique (SMSP) and all attachments to such correspondence; and
- All diary entries, file notes, and minutes of any meetings attended by the Acting Deputy Director-General, Regional Economic Development or the Department Liaison Officer (the Department Personnel), with named representatives of SMSP
- Any correspondence (including electronic communications) between any of the Department Personnel and named representatives of SMSP and all attachments to such correspondence; and
- Any correspondence (including electronic communications) between any of the Department Personnel regarding SMSP and all attachments to such correspondence.
- all directions handed down by the State re its review of the MBRC planning scheme
- all correspondence (i.e. emails, meeting notes, telephone notes etc) between the State and MBRC re its review and consideration of the planning scheme
- any correspondence re any issues with the MBRC planning scheme, such as areas of non-compliance with planning policy or state legislation
- any requirements from the State to alter or amend the planning scheme
- any instructions from the State that it was not prepared to accept the planning scheme amendment in its current form
- the current status of the planning scheme amendment.
- all directions handed down by the State re its review of the MBRC planning scheme
- all correspondence (i.e. emails, meeting notes, telephone notes etc) between the State and MBRC re its review and consideration of the planning scheme
- any correspondence re any issues with the MBRC planning scheme, such as areas of non-compliance with planning policy or state legislation
- any requirements from the State to alter or amend the planning scheme
- any instructions from the State that it was not prepared to accept the planning scheme amendment in its current form
- the current status of the planning scheme amendment.
- WMAwater having been commissioned to undertake an independent review of the flood modelling
- reporting conducted by Stockland that was provided by Sunshine Coast Council to support the Twin Waters West planning scheme amendment.
- Gympie Regional Council’s Expression of Interest (EOI) application under BoR
- All supporting documents to the EOI application:
- Eligibility checklist
- The EOI Assessment Report
- Any correspondence between Gympie Regional Council and the department regarding the unsuccessful outcome of Gympie Regional Council’s BoR EOI application.
- Notice given by the Minister under section 27(2) of the Planning Act 2016 related to the proposed Ipswich City Council Temporary Local Planning Instrument No. 1 of 2018 (Waste Activity Regulation (TLPI No. 1 of 2018)
- Any response from Ipswich City Council in relation to the notice given by the Minister; and
- Documents the Minister had regard to in deciding to exercise power under section 27 of the Planning Act 2016 to issue TLPI No. 1 of 2018.
- Gympie Regional Council's submitted List of Projects under 2016-17 Works for Queensland
- Works for Queensland eligibility guide
- Original moderation panel assessment, preliminary approval and letters
- Supporting documents and correspondence regarding project eligibility
- Endorsement brief and letters to Council
- All business cases relied upon by Gympie Regional Council for the project/allocation of funding.
- All update reports from Gympie Regional Council and all communications between Gympie Regional Council and the department regarding delays and reasons for delays (including requests for extensions of time).
- Documents relating to the application for a Material Change of Use made by Aurizon Network Pty Ltd (Aurizon)(or any other related or associated entity) in or around May 2014 in respect of rail infrastructure development or rail transport infrastructure within the Gladstone State Development Area (the Application)
- Any additional or further information submitted by Aurizon in support of, or in contemplation of, the Application
- Documents relating to the approval of the Application by the Coordinator-General in or around November 2014
- All correspondence between the Coordinator-General, the department, the Department of Transport and Main Roads, Gladstone Regional Council, any other referral agency and Aurizon from June 2013 to December 2015 in respect of the Application.
- Notice given by the Minister under section 27(2) of the Planning Act 2016 related to the proposed Ipswich City Council Temporary Local Planning Instrument No. 1 of 2018 (Waste Activity Regulation (TLPI No. 1 of 2018)
- Any response from Ipswich City Council in relation to the notice given by the Minister; and
- Documents the Minister had regard to in deciding to exercise power under section 27 of the Planning Act 2016 to issue TLPI No. 1 of 2018.
- The submission made by Gympie Regional Council in response to the 2010 community consultation and review of the Draft Wide Bay Burnett Regional Plan and the Draft Wide Bay State Planning Regulatory Provisions 2010 (excluding attachments that comprises a private submission relating to properties on Potter Street, Gympie)
- Documents disclosing all information supplied by officers of Gympie Regional Council to the former Department of Infrastructure and Planning regarding a property in Gympie.
- All documents in relation to the acquisition by Corbet Property Pty Ltd ACN 162344916 as trustee for a Family Trust from the Coordinator-General of 1944 Bruce Highway, Traveston (being Lot 520on SP263809).
- All documents in relation to any other sites Corbet Property Pty Ltd ACN 162 344 916 were considering acquiring from the Coordinator-General.
- All properties greater than 10 hectares which were available for Corbet Property Pty Ltd ACN 162 344 916 to purchase from the Coordinator-General prior to 24 July 2015.
- The Development Lease between Corbet Property Pty Ltd and the Coordinator-General, and any documents relating to it.
- Correspondence between the Department of Environment and Science (DES) or the Delegate and the Coordinator-General
- Diary notes and file notes of meetings or communications between DES or the Delegate and the Coordinator-General
- Correspondence to and from the Coordinator-General or to and from Department of State Development, Manufacturing, Infrastructure and Planning (DSDMIP) excluding personal information
- Diary notes and file notes of meetings or communications between the Coordinator-General and DSDMIP
- Correspondence passing between and diary notes and file notes of meetings or communications between the Coordinator-General and other Queensland Government departments or ministers.
- unmarked or unannotated versions of court documents, the mining lease application or the EA amendment application
- unmarked or unannotated versions of correspondence between New Acland Coal Pty Ltd (NAC) and the Coordinator-General in relation to the additional information process, the EA decision, the Coordinator-General’s Report or the EA amendment application
- the Environmental Impact Statement (EIS), the additional information to the EIS, the Coordinator-General’s Report, the Draft EA and objection notices
- the Cresswell Report; and
- duplicates.
- Administrative duties (ie. approving someone's holiday, catering expense or other internal staffing requirement)
- Invitation or event or awards proceedings that the Minister has been invited to
- Documents that have been designed specifically and used in Cabinet or Parliament
- Overseas travel reports (ie. reports by people who have travelled overseas discussing the trip)
- Correspondence involving members of the public (eg. proforma letters in response to correspondence from members of the public)
- Applications for extension in time or funding requests
- Meeting times including dates of future meetings.
Department of State Development, Infrastructure and Planning | RTI2425-055-DSDIP | 23 May 2025 | Time period / date range for the request: 1 January 2022 to 26 May 2025. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-054-DSDIP | 23 May 2025 | To be published after documents are accessed | Currently being processed | |
Department of State Development, Infrastructure and Planning | RTI2425-051-DSDIP | 13 May 2025 | Time period / date range for the request: 1 January 2023 to 31 December 2024. | To be published after documents are accessed | Currently being processed |
Department of State Development, Infrastructure and Planning | RTI2425-050-DSDIP | 28 April 2025 | All documents regarding the assessment of the operational works permit application / change application and refusal decision for State Assessment and Referral Agency application reference number 2410-42724 SRA. Time period / date range for the request: 1 January 2024 to 24 April 2025. | To be published after documents are accessed | Currently being processed |
Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations | RTI2425-049-DPMSDIPMIR | 14 April 2025 | Any communication, held by the Deputy Premier, Chief of Staff and/or policy advisors, in respect to “Tewantin” and "Bright Place, Birtinya". The application is to exclude Cabinet and Parliament related matters within a document, final published media releases and press clippings. Time period / date range for the request: 1 November 2024 to 31 March 2025. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-048-DSDIP | 15 April 2025 | All documents regarding the assessment of the operational works permit applications / change application and refusal for the following SRA application references: Time period / date range for the request: 1 January 2021 to 14 April 2025. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-047-DSDIP | 15 April 2025 | Time period / date range for the request: 1 September 2019 to 14 April 2025. | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations | RTI2425-046-DPMSDIPMIR | 11 April 2025 | All finalised briefing notes to or from the Office of the Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations. This includes, but is not limited to, briefing notes for noting and decision briefs. The application is to: Time period / date range for the request: 1 January 2025 to 31 March 2025 | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations | RTI2425-045-DPMSDIPMIR | 11 April 2025 | Any communication in respect of a named individual. Time period / date range for the request: 1 March 2025 to 11 April 2025 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-043-DSDIP | 9 April 2025 | All correspondence between (former) Economic Development Queensland (EDQ) Chief Executive Officer (CEO) Debbie McNamara and the EDQ board, Director-General, and/or Minister's office regarding Debbie McNamara's future in the role, including any notification of her resignation. Time period / date range for the request: 1 February 2025 to 9 April 2025 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-041-DSDIP | 29 April 2025 | To be published after documents are accessed | Currently being processed | |
Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations | RTI2425-040-DPMSDIPMIR | 25 March 2025 | The draft report for Brisbane 2032 Olympic and Paralympic Games 100-day Review that was submitted to the Deputy Premier on 22 February 2025. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure and Planning | RTI2425-039-DSDIP | 31 March 2025 | The following documents relating to Ministerial Infrastructure Designation (MID) application MID 1222 0658 - Mt St Michael's College: | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure and Planning | RTI2425-036-DSDIP | 27 March 2025 | Documents relating to a recruitment process. Time period / date range for the request: 1 September 2022 to 31 October 2023 | Name withheld1 | Application finalised2 |
Department of State Development, Infrastructure and Planning | RTI2425-035-DSDIP | 28 January 2025 | The diary of Mr John Sosso, Director-General, Department of State Development, Infrastructure and Planning. Time period / date range for the request: 11 November 2024 to 28 January 2025 | Office of the Leader of the Opposition | Application finalised Documents for RTI2425-035 ( |
Deputy Premier, Minister for State Development, Infrastructure and Planning and Minister for Industrial Relations | RTI2425-034-DPMSDIPMIR | 28 January 2025 | All communications, and phone call log if a telephone conversation occurred, between the Deputy Premier (in any of his ministerial capacities) and certain named individuals. Time period / date range for the request: 28 October 2024 to 28 January 2025 | Office of the Leader of the Opposition | Application finalised Documents for RTI2425-034-DPMSDIPMIR ( |
Department of State Development, Infrastructure and Planning | RTI2425-031-DSDIP | 16 January 2025 | The conflict of interest declaration / statement (or other document however described) completed by Graham Quirk in relation to his work on the Sports Venue Review. | Save Victoria Park Inc | Application finalised The documents may be accessed by contacting the Right to Information team. |
Department of State Development, Infrastructure and Planning | RTI2425-030-DSDIP | 22 January 2025 | Documents relating to: Time period / date range for the request: 1 January 2012 to 16 January 2025. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure and Planning | RTI2425-029-DSDIP | 10 January 2025 | The final report on Short Term Rental Accommodation which was completed by the University of Queensland in October 2024. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-028-DSDIP | 20 January 2025 | Documents relating to the State Interest Review of the making of the Gold Coast City Plan (as made and as amended from time to time), particularly: The application is to exclude submissions or correspondence from third parties outside of the department and Council. Time period / date range for the request: 2012 to 2016 | Saunders Havill Group | Application finalised Documents for RTI2425-028 ( |
Department of State Development, Infrastructure and Planning | RTI2425-027-DSDIP | 8 January 2025 | Document(s) revealing the identities of the entities that made the ten (10) submissions considered as part of the Sport Venue Review that referenced ‘Victoria Park’, which are referred to in the pie chart that appears in the ‘Appendix – Summary of Key Themes from Submissions’ on page 76 of the final report of the Sport Venue Review. | Save Victoria Park Inc | Documents for RTI2425-027-DSDIP ( |
Department of State Development, Infrastructure and Planning | RTI2425-026-DSDIP | 9 January 2025 | Time period / date range for the request: 1 March 2013 to 22 May 2019 | Mineralogy Pty Ltd | Application finalised Documents for RTI2425-026-DSDIP ( |
Department of State Development, Infrastructure and Planning | RTI2425-027-DSDIP | 8 January 2025 | Document(s) revealing the identities of the entities that made the ten (10) submissions considered as part of the Sport Venue Review that referenced ‘Victoria Park’, which are referred to in the pie chart that appears in the ‘Appendix – Summary of Key Themes from Submissions’ on page 76 of the final report of the Sport Venue Review. | Save Victoria Park Inc | Documents for RTI2425-027-DSDIP ( |
Department of State Development, Infrastructure and Planning | RTI2425-026-DSDIP | 9 January 2025 | Time period / date range for the request: 1 March 2013 to 22 May 2019 | Mineralogy Pty Ltd | Application finalised Documents for RTI2425-026-DSDIP ( |
Department of State Development, Infrastructure and Planning | RTI2425-025-DSDIP | 23 December 2024 | All documents relating to request for funding, negotiation and awarding of funding between the Mayor of Mount Isa City Council (or any representative of the Council), Isa Rodeo Ltd and the State of Queensland for funding from the Mount Isa Transition Fund. Time period / date range for the request: 21 October 2024 to 21 December 2024 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-023-DSDIP | 16 December 2024 | Time period / date range for the request: 16 August 2024 to 30 September 2024 | Landarch Properties Pty Ltd | Application finalised5 |
Department of State Development, Infrastructure and Planning | RTI2425-022-DSDIP | 13 December 2024 | Application, approvals, conditions, correspondence and reports referencing: 2404-34309 SRA (Development application modification for material change of use to include waste utilisation areas for an existing approved feedlot) SARAs referral reference ID is: 2404-34309 SRA. Time period/date range for the request: 1 May 2023 to 12 December 2024 | Name withheld1 | Documents were not accessed by the applicant. |
Department of State Development, Infrastructure and Planning | RTI2425-021-DSDIP | 10 December 2024 | The briefing note and all attachments referenced in paragraph 2.1 of the Statement of Reasons dated 4 September 2024 in respect of the Temporary Local Planning Instrument No. 1/2024 - Arundel Hills. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-020-DSDIP | 4 December 2024 | All communications, pre-lodgement advice and/or reports from the State Assessment and Referral Agency and its Technical Agencies in regards to the proposed sand extraction at a property in Killaloe. Time period / date range for the request: 1 August 2023 to 30 June 2024 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure and Planning | RTI2425-018-DSDIP | 2 December 2024 | All communications between the Department of State Development, Infrastructure and Planning (as well as the former Department of Housing, Local Government, Planning and Public Works) and Moreton Bay Regional Council regarding: Time period / date range for the request: 19 April 2024 to 29 November 2024 | Name withheld1 | Application finalised Documents for RTI2425-018-DSDIP ( |
Department of State Development, Infrastructure and Planning | RTI2425-017-DSDIP | 26 November 2024 | Applications, approvals, conditions, correspondence and reports: | EnviroAg Australia Pty Ltd | Application finalised5 |
Department of State Development, Infrastructure and Planning | RTI2425-016-DSDIP | 15 November 2024 | The following documents relating to the Ministerial Infrastructure Designation (MID) for Social Affordable Housing, Princess Street Toowoomba (MID-0524-0845) made by the then Minister for Housing, Local Government and Planning and Minister for Public Works on 30 September 2024: | Name withheld2 | Application finalised Documents for RTI2425-016-DSDIP ( ![]() |
Department of State Development, Infrastructure and Planning | RTI2425-015-DSDIP | 4 November 2024 | Submissions made as part of the public consultation process for Temporary Local Planning Instrument No. 1 of 2023 Kurilpa Sustainable Growth Precinct (TLPI 01/2023), by the following entities: | Brisbane Times | Application finalised Documents for RTI2425-015-DSDIP ( ![]() |
Department of State Development and Infrastructure | RTI2425-013-DSDI | 11 October 2024 | Copies of the ‘advice’ and ‘consultation’ referred to on page 40 of the 2021-2023 annual report of the Brisbane Organising Committee for the 2032 Olympic and Paralympic Games. Time period / date range for the request: 20 December 2021 to 30 June 2023. | Name withheld1 | Application finalised1 |
Department of State Development and Infrastructure | RTI2425-010-DSDI | 18 September 2024 | The document containing the original scope of works as provided to, and understood by Ganden (excluding the actual Ganden report); and The letter from Ganden to the Department of State Development, Manufacturing, Infrastructure and Planning dated 8 November 2019. | Name withheld1 | Application finalised Documents for RTI2425-010-DSDI ( ![]() |
Department of State Development and Infrastructure | RTI2425-008-DSDI | 2 September 2024 | The letter of offer and grant application in relation to Western Downs Regional Council securing a $14.1 million grant from the Resource Community Infrastructure Fund for the Dalby Cultural Centre. | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-079-DSDI | 30 May 2024 | All drafts and other working versions of the development scheme for the Sunshine Coast Airport priority development area. | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-077-DSDI | 23 May 2024 | Emails enclosing architectural and/or artistic visual renders of Queensland Sport and Athletics Centre (QSAC) that have been generated in the process of venue appraisal for the Brisbane 2032 Olympic and Paralympic Games. Time period / date range for the request: 1 January 2023 to 23 May 2024 | Brisbane Times | Application finalised Documents for RTI2324-077-DSDI ( ![]() |
Department of State Development and Infrastructure | RTI2324-074-DSDI | 24 May 2024 | For the purpose of the application searches are to be limited to the Director-General | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-073-DSDI | 24 April 2024 | Time period / date range for the request: 25 February 2024 to 24 April 2024 | Name withheld1 | Application finalised1 |
Department of State Development and Infrastructure | RTI2324-068-DSDI | 12 April 2024 | Planning approvals and overlays in relation to a community residence. Time period / date range for the request: 1 October 2021 and 12 April 2024 | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-066-DSDI | 19 June 2024 | Time period / date range for the request: 2021-2022 (for items 3 and 4 only). | Name witheld2 | Application finalised Documents for RTI2324-066-DSDI ( ![]() |
Department of State Development and Infrastructure | RTI2324-065-DSDI | 28 March 2024 | All correspondence/information regarding an unlawful fence structure(s) on public land adjacent to a property in Clagiraba. Time period / date range for the request: January 2022 to 28 March 2024 | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-064-DSDI | 21 March 2024 | The following documents relating to hospitality, travel, entertainment, and accommodation expenditure in relation to the 2023 Los Angeles and Boston overseas mission. Time period / date range for request: 1 May 2023 to 21 March 2024. | Seven Network (Operations) Limited | Application finalised Documents for RTI2324-064-DSDI ( ![]() |
Department of State Development and Infrastructure | RTI2324-063-DSDI | 20 March 2024 | Documents in relation to ‘Change Request 1’ and/or the ‘Change Request Report No.1’ for the following projects: a) North Galilee Basin Rail Project; and b) Carmichael Coal Mine and Rail Project. Time period / date range for the request: 1 January 2014 to 31 May 2018 | Name withheld2 | Application finalised Documents for RTI2324-063-TCG ( ![]() |
Department of State Development and Infrastructure | RTI2324-062-DSDI | 14 March 2024 | All information regarding a complaint about a property. | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-060-DSDI | 13 March 2024 | Documents in relation to a dog attack. Time period / date range for the request: 20 January 2024 to 24 January 2024 | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-058-DSDI | 26 February 2024 | Records of all vegetation management work and the use of products used for work carried out in the Local Government Area of Townsville, Queensland by Townsville City Council workers and contractors between Tuesday 15 August 2023 and Monday 21 August 2023. | Name withheld1 | Application withdrawn |
Minister for State Development and Infrastructure, Minister for Industrial Relations and Minister for Racing | RTI2324-056-MSDI | 14 February 2024 | Full staff list for the Minister Grace's office as at the 22 February 2024 including name (first and surname), position title, and pay scale (excluding pay point within the scale). | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-055-DSDI | 29 January 2024 | CCTV footage from an Australia Post postal office on the 1 February 2024 and 31 January 2024. | Name withheld1 | Application withdrawn |
Department of State Development and Infrastructure | RTI2324-052-DSDI | 29 January 2024 | Maroochy Shire Council's extractive industry re-zoning application made in 1990, and the Minister for Planning’s decision notice, for the Dulong Quarry. Time period / date range for the request: January 1989 to December 1991 | Name withheld1 | Application finalised1 |
Department of State Development and Infrastructure | RTI2324-051-DSDI | 22 January 2024 | The following ministerial briefing notes prepared for the then Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympic and Paralympic Games Infrastructure: | Seven Network (Operations) Limited | Documents for RTI2324-051-DSDI ( |
Minister for State Development and Infrastructure, Minister for Industrial Relations and Minister for Racing | RTI2324-043-MSDI | 20 December 2023 | Briefing papers and correspondence prepared by the South Bank Corporation for the incoming Minister, Grace Grace. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-041-DSDILGP | 11 December 2023 | Time period / date range for request: 1 March 2022 to 30 November 2023 | Name withheld1 | Application Withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2324-038-DPMSDILGP | 30 November 2023 | All departmental briefings to the Deputy Premier, and all correspondence between the Deputy Premier and Federal Infrastructure Minister Catherine King, regarding the Independent Strategic Review of the Infrastructure Investment Program. Time period / date range for the request: 1 July 2023 to 30 November 2023 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-036-DSDILGP | 23 November 2023 | The following documents that relate to specific land in Burrum Heads, Queensland: Time period / date range for the request: 1 March 2021 to 23 November 2023 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-035-DSDILGP | 15 November 2023 | Copies of the following ministerial briefing notes (MBN) as referenced from the list released in response to RTI application RTI2324-019-DSDILGP: | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-034-DSDILGP | 15 November 2023 | All correspondence (including SMS and messenger service messages) regarding the announcement made on 15 November 2023 in relation to a desalination plant on Bribie Island. Time period / date range for the request: 27 October 2023 to 15 November 2023 | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2324-033-DPMSDILGP | 15 November 2023 | All correspondence (including SMS and messenger service messages) regarding the announcement made on 15 November 2023 in relation to a desalination plant on Bribie Island. Time period / date range for the request: 27 October 2023 to 15 November 2023 | Leader of the Opposition | Documents for RTI2324-033-DPMSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-031-DSDILGP | 7 November 2023 | Issues briefs and briefing notes (including ministerial briefing notes) that include the word ‘contentious’ and are locatable by electronic searches only of record titles and content. Time period / date range for the request: 1 October 2023 to 7 November 2023 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-030-DSDILGP | 31 October 2023 | Documents concerning ownership of a retaining wall along a common boundary of the applicant’s property in Albany Creek. Time period / date range for the request: January 1980 to January 1990 | Name withheld1 | Application Withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-029-DSDILGP | 31 October 2023 | All correspondence and communications in relation to the Facilitation Agreement between CPS Hervey Bay Pty Ltd, Hervey Bay Boat Club Inc and the State of Queensland. Time period / date range for the request: 1 July 2022 to 31 October 2023. | Name withheld1 | Application Withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-027-DSDILGP | 31 October 2023 | All documents relating to the State Assessment and Referral Agency (SARA) assessment of Orchard (Blewers) Developments Pty Ltd development application in respect of 49 & 57 Blewers Road, Morayfield (Lot 81 on RP186546 and Lot 82 on RP186546). Time period / date range for the request: 1 January 2022 to 20 December 2022 | Orchard (Blewers) Development | Documents for RTI2324-027-DSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-026-DSDILGP | 30 October 2023 | Documents relating to a dog attack. | Name withheld1 | Application Withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-025-DSDILGP | 30 October 2023 | All correspondence and communications relating to: Time period / date range for the request: 1 July 2022 to 30 October 2023. | CPS Hervey Bay Pty Ltd | Application finalised3 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2324-024-DPMSDILGP | 13 October 2023 | All SMSs and messenger service messages to/from the Deputy Premier. Time period / date range for request: 11 October 2023 between 10am and 11:30am | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-023-DSDILGP | 10 October 2023 | Time period / date range for the request: 1 March 2023 to 30 September 2023 | Redlands City Council | Documents for RTI2324-023-DSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-020-DSDILGP | 22 September 2023 | Reports, ministerial briefing notes and correspondence (including emails) relating to one or more of the following: The application is limited to the Director-General and the Deputy Directors-General. Time period / date range for the request: 1 February 2023 to 22 September 2023 | Seven Network (Operations) Limited | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-019-DSDILGP | 22 September 2023 | List of the ministerial briefing notes that have been sent to the Minister. Time period / date range for the request: 1 July 2023 to 22 September 2023. | Seven Network (Operations) Limited | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-018-DSDILGP | 11 September 2023 | Tablelands Regional Council minutes of meetings in relation to Malanda Falls Caravan Park. Time period / date range for the request: 27 October 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-015-DSDILGP | 25 August 2023 | All briefing notes prepared for Mike Kaiser and Andrew Hopper ahead of their appearance at a public hearing of the Senate inquiry into Australia's preparedness to host Commonwealth, Olympic and Paralympic Games on 22 August. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-014-DSDILGP | 25 August 2023 | A spreadsheet or summary document detailing all properties purchased under the Voluntary Home Buy-Back scheme by property type (for example, house, unit, townhouse, complex or land), town or suburb, street and price. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-012-DSDILGP | 1 August 2023 | QUT’s correspondence and the types of departmental advice being applied for is referred to in draft ministerial briefing note MBN21/430 (as published to the Department’s disclosure log in relation to RTI2021-077-DSDILGP). Time period / date range for the request: 1 April 2020 to 1 February 2021 | Nine Entertainment Co. Pty Limited | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-011-DSDILGP | 1 August 2023 | The ‘Gambling Impacts Report’ contained in the ‘Queen's Wharf Longitudinal Benefits and Impacts Study: Phase 1 Final Report 30.11.18’ The Gambling Impacts Report is referred to in draft ministerial briefing note MBN21/430 (as published to the Department’s disclosure log in relation to RTI2021-077-DSDILGP). | Nine Entertainment Co. Pty Limited (Brisbane Times) | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-010-DSDILGP | 27 July 2023 | Correspondence between Arrow Energy (and associated companies) and the Department in relation to processes and requirements for claiming an exemption under section 22 of the Regional Planning Interest Act 2014 for the Surat Gas Project. Time period / date range for the request: 1 January 2020 to 27 July 2023 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-009-DSDILGP | 25 July 2023 | All documents relating to the applicant’s submission made through the Housing Opportunities Portal in relation to housing ideas and opportunities. Time period / date range for the request: April 2023 to 25 July 2023 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-006-DSDILGP | 14 July 2023 | Summaries of phases one, two, three and four of Queensland University of Technology's studies into the impacts/benefits of the Queen's Wharf Brisbane development. Time period / date range for the request: 30 November 2018 to 31 December 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-004-DSDILGP | 14 July 2023 | Ministerial briefing notes that relate to the studies conducted by Queensland University of Technology into the benefits/impacts of the Queen’s Wharf Brisbane development. Time period / date range for the request: 19 May 2021 to 13 July 2023 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-002-DSDILGP | 3 July 2023 | The government's "cost assessment" of exiting the contract(s), signed in September 2021, for the Queensland Regional Accommodation Centre (Wellcamp quarantine facility) and any accompanying recommendations. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2324-001-DSDILGP | 3 July 2023 | Documents showing dates of assent and proclamation for the Local Government Act 2009 and Queensland Constitution 2001. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-094-DSDILGP | 30 June 2023 | Copy of the PwC report, associated documents, and all emails, letters, text messages and other communications between the Scenic Rim Regional Council and DSDILGP in relation to the preparation of the reports commissioned by the DSDILGP in collaboration with Scenic Rim Regional Council about the future of the Bromelton State Development Area and relating to the completed report. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-093-DSDILGP | 20 June 2023 | Correspondence between the Department and Gasfields Commission Queensland (GFCQ) that relates to GFCQ's role as advice agency in providing advice about two Arrow Energy applications currently under assessment (References RPI22/004 and RPI21/028). | Name withheld1 | Documents for RTI2223-093-DSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-092-DSDILGP | 15 June 2023 | All documents including emails, call logs, complaint forms and responses relating to an individual. | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-090-DPMSDILGP | 2 June 2023 | All correspondence, ministerial briefing notes and emails, both received and generated by the Office of the Deputy Premier, regarding Ballymore Stadium’s status as a venue for Olympic hockey. Time period / date range for the request: 9 March 2023 to 26 April 2023. | Nine Entertainment Co. Pty Ltd (Brisbane Times) | Documents for RTI2223-090-DPMSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-089-DSDILGP | 29 May 2023 | CCTV footage outside of an address in Brisbane City on 23 May 2023. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-088-DSDILGP | 26 May 2023 | Documents in relation to a property located at Chermside. Time period / date range for the request: 2014 to 2019 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-086-DSDILGP | 23 May 2023 | Communications between then Minister Jackie Trad and a named individual from AEG Ogden. Time period / date range for the request: 1 September 2017 to 25 November 2017. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-085-DSDILGP | 19 May 2023 | All documents relating to an application to rezone part of a property within the local government area of the former Maroochy Shire Council. Time period / date range for the request: 1 January 1989 to 31 December 1991 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-083-DSDILGP | 9 May 2023 | All communications between the Department and Trenert Group Pty Ltd (or representatives) regarding developments, work, sites or any other relevant activities in the South Brisbane electorate. Time period / date range for the request: 1 October 2020 to 3 May 2023. | Name withheld1 | Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $501.00 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-082-DPMSDILGP | 3 May 2023 | All communications between the Office of the Deputy Premier and Trenert Group Pty (or representatives). Time period / date range for the request: 1 October 2020 to 3 May 2023. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-081-DSDILGP | 28 April 2023 | The preliminary research completed by or for the Department, as announced by the Deputy Premier on 18 October 2022, into the impacts of the short-term rental market on Queensland's housing supply. Time period / date range for the request: 18 October 2022 to 31 December 2022 | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-080-DPMSDILGP | 26 April 2023 | All correspondence, ministerial briefing notes and emails, both received and generated by the Office of the Deputy Premier, regarding Ballymore Stadium’s status as a venue for Olympic hockey. Time period / date range for the request: 24 October 2022 to 26 April 2023 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-079-DSDILGP | 19 April 2023 | All documents relating to certain properties in Airlie Beach, Queensland. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-078-DSDILGP | 19 April 2023 | All documents regarding the prosed crisis accommodation at Griffith University. Time period / date range for the request: 9 September 2022 to 19 April 2023 | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-077-DPMSDILGP | 19 April 2023 | All documents regarding the prosed crisis accommodation at Griffith University. Time period / date range for request: 9 September 2022 to 19 April 2023 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-076-DSDILGP | 19 April 2023 | The report produced by Queensland-based architecture firm, Populous, delivered to the state government for the purposes of completing the International Olympic Committee's Olympics host questionnaire. Time period / date range for the request: 2021 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-074-DSDILGP | 3 April 2023 | Name withheld1 | Application withdrawn | |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-071-DPMSDILGP | 22 March 2023 | Any text message correspondence between the Deputy Premier and a named individual from ASM Global/AEG Ogden. Time period / date range for the request: 1 January 2021 to 21 March 2023. | The Australian Financial Review | Application finalised Documents for RTI2223-071-DPMSDILGP ( ![]() |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-070-DPMSDILGP | 21 March 2023 | With regards to items 1 and 2, the request is limited to documents mentioning the terms “Brisbane Live”, “Brisbane live”, “Brisbane Arena”, “Roma Street”, “Roma St”, “Olympic” or “Cross River Rail”. Time period / date range for the request: 1 October 2022 to 21 March 2023 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-069-DSDILGP | 17 March 2023 | The report produced by Queensland-based architecture firm, Populous, delivered to the state government for the purposes of completing the International Olympic Committee's Olympics host questionnaire. Time period / date range for request: 2020 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-068-DSDILGP | 17 March 2023 | Name withheld1 | Application finalised1 | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-063-DSDILGP | 1 March 2023 | Time period / date range for the request: 1 April 2021 to 24 February 2023. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-060-DSDILGP | 21 February 2023 | Correspondence (including emails) and ministerial briefing notes concerning: Time period / date range for the request: 16 January 2023 to 21 February 2023. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-059-DSDILGP | 15 February 2023 | A copy of the register maintained by the Department that documents the reasons for non-disclosure of particular contracts in accordance with clause 1.8.1 of the Procurement guidelines: Contract disclosure issued by the Director-General of the Department of Energy and Public Works. Time period / date range for the request: 1 July 2020 to 30 June 2022. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-057-DSDILGP | 13 February 2023 | All inter-governmental communications, responses within the Department and communications between the Department and certain individuals, relating to a complaint(s) lodged by the applicant. | Name withheld1 | Application finalised2 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-054-DSDILGP | 3 February 2023 | Any documents detailing a direction or suggestion about extending an engagement agreement with any entities for the Brisbane Live or Roma Street station projects. The parties to the agreement would include AEG Ogden or ASM Global, or their representatives, and the Cross River Rail Delivery Authority. Time period / date range for the request: 30 June 2020 to 1 November 2020. | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-053-DPMSDILGP | 3 February 2023 | Briefing notes, memos, notes and emails detailing meetings with Live Nation (or its representatives) that involved the following officers: | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-052-DSDILGP | 2 February 2023 | Briefing notes, memos, notes, emails, SMS messages and messenger service messages relating to a meeting with ASM Global (or its representatives) that involved the following officers: | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-051-DPMSDILGP | 2 February 2023 | Name withheld1 | Application withdrawn | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-050-DSDILGP | 2 February 2023 | All documents, created by the former Department of Local Government, that were used to brief the incoming minister as a result of the 2012 Queensland state election. Time period / date range for the request: 1 March 2012 to 30 June 2012 | Name withheld1 | Application finalised |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-049-DPMSDILGP | 1 February 2023 | All emails, SMS messages, messenger service messages, memos, letters and briefing notes sent or received by anyone in the Deputy Premier's office (including the Deputy Premier) regarding the death of a named individual or the new youth justice measures announced on 29 December 2022. The time period / date range for the request: 26 December 2022 to 31 December 2022 | Name withheld1 | Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $242.15 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-047-DSDILGP | 16 January 2023 | Time period / date range for the request: 1 January 2018 to 1 January 2023. | Mad Axe Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-046-DSDILGP | 19 December 2022 | Agreement entered into between the Urban Land Development Authority and Australand Northshore Pty Ltd, for material change of use in relation to a block of land in the Hamilton Northshore Development. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-045-DSDILGP | 15 December 2022 | Ministerial briefing notes, correspondence (including emails) held by the Director-General reports and audits relating to Cross River Rail. Time period / date range for the request: 1 March 2022 to 15 December 2022 | Seven Network | Application finialsed |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-044-DPMSDILGP | 15 December 2022 | All correspondence and other documents from or to Councillor/Mayor Mark Jamieson, Sunshine Coast Regional Council (SCRC), any SCRC councillors, representatives or officers and/or the Department of State Development, Infrastructure, Local Government and Planning (the Department), relating to: The time period / date range for the request is 1 June 2022 to 9 December 2022 | Name withheld2 (Member of Parliament) | Application finialsed |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-043-DSDILGP | 8 December 2022 | All email communications containing the terms "smart city", "smart cities", "world economic forum" "wef" "weforum". The terms may be in the body, subject or sender/receiver of the email. Time period / date range for request: 1 January 2016 to 8 December 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-039-DSDILGP | 16 November 2022 | The most recent document(s), produced by the Department and/or EDQ, detailing progress of the Priority Development Areas (PDAs). | Nine Entertainment Co. Pty Ltd (Nine Newspapers) | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-034-DSDILGP | 3 November 2022 | All documents relating to the proposed site specific amendments to the Sunshine Coast Regional Council (SCRC) planning scheme relating to the Buddina Urban Village in the Kawana Waters Local Plan Area (also referenced as KAW LPP-4 and KAW LPSP-4a). The application is to exclude minutes and agendas of SCRC meetings that are publicly available. Time period / date range for the request: 1 April 2022 to 2 November 2022. | Friends of Buddina Ltd | Application finalised Documents for RTI2223-034-DSDILGP - Part1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-031-DSDILGP | 29 September 2022 | Documents relating to planning advice the Department provided in relation to specific lots located in Thornlands, Queensland. | Redland City Council | Application finalised2 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-027-DSDILGP | 19 September 2022 | All documents relating to the grant awarded to Ellume Limited (and any subsidiary) under the Essential Goods and Supply Chain Program. Time period / date range for the request: 31 March 2020 to 19 September 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-023-DSDILGP | 1 September 2022 | The following documents in relation to Echo Entertainment (now called Star Entertainment) and the construction of a new theatre at Southbank: Time period / date range for the request: 21 January 2015 to 21 July 2015 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-022-DSDILGP | 30 August 2022 | Time period / date range for the request: 1 March 2020 to 30 August 2022 | Name withheld1 | Application withdrawn |
The Coordinator-General | RTI2223-020-TCG | 18 August 2022 | Time period / date range for the request: 1 January 2021 to 28 January 2022. | Name withheld1 | Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $826.65 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-015- DPMSDILGP | 11 August 2022 | All correspondence (text messages, emails, whatsapp messages) between the Minister (or ministerial or departmental staff) and the Wagner Corporation Board. All correspondence between the Minister (or ministerial or departmental staff) and any member of the Wagner Corporation Board. Time period / date range for request: 1 May 2019 to 30 August 2021 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-012-DSDILGP | 3 August 2022 | Documents relating to the decision to nominate the Gabba/Brisbane Cricket Ground as the main Olympic stadium, replacing a proposed stadium at Albion Park. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-011-DSDILGP | 3 August 2022 | Documents regarding the suitability of Perry Park, Bowen Hills, as a potential Olympic venue. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-008-DSDILGP | 3 August 2022 | Documents concerning the selection and suitability of Ballymore Stadium, Herston, as an Olympic hockey venue, including documents outlining alternative sites. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-006-DSDILGP | 8 August 2022 | Ministerial or Director-General briefing notes that are about the Ballymore Stadium, Perry Park or the Brisbane Cricket Ground (Gabba) being considered as Olympic Venues. | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2223-005- DPMSDILGP | 11 August 2022 | All correspondence between the Minister (or departmental staff) and the Wagner Corporation Board. All correspondence between the Minister (or departmental staff) and any member of the Wagner Corporation Board. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-004-DSDILGP | 27 July 2022 | All agreements (including lease agreements) and contracts (including construction contracts) between the State of Queensland and Wagner Corporation in relation to the Wellcamp quarantine facility in Toowoomba (that is formerly named the Queensland Regional Accommodation Centre) | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2223-003-DSDILGP | 18 July 2022 | All transitioned approvals under the Regional Planning Interests Act 2014 for Petroleum Lease 230 (also known as PL230). Time period / date range for the request: 1 June 2014 to 17 July 2022 | Name withheld1 | Application withdrawn Documents for RTI2223-003- DSDILGP – Administratively released ( |
Assistant Minister for Local Government | RTI2223-002-AMLG | 7 July 2022 | The diary of the Assistant Minister for Local Government for the period between 1 February 2022 and 4 July 2022. | Seven Network | Application finalised Documents for RTI2223-002- AMLG ( |
The Coordinator-General | RTI2122-102-TCG | 28 June 2022 | Time period / date range for the request: 1 September 2021 to 30 November 2021 | Name withheld7 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-101-DSDILGP | 23 June 2022 | Documents concerning the permit to clear protected vegetation on the land described as Lot 5 on SP106985 (formerly Lot 5 on SP235661) (reference SDA-0714-013023). Time period / date range for the request: 1 January 2013 to 31 December 2015 | Name withheld1 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-100-DSDILGP | 23 June 2022 | All documents that the Department used and/or relied upon in formulating its decision that Arrow Energy was exempt from the Regional Interests Development Approval for the Dalby Expansion Project (reference EPPG00972513). | Name withheld2 | Application finalised Documents for RTI2122-100-DSDILGP ( |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-098-DSDILGP | 14 June 2022 | Name withheld2 | Application finalised | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-097-DSDILGP | 6 June 2022 | The executed delivery arrangement agreements for the environmental offset for the following: | Landarch Properties Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-094-DSDILGP | 10 May 2022 | Documents relating to the application and change requests (references APC2015/030, APC2018/002 and APC2021/015) for the Barro extractive industry approval at Sandy Creek, Bromelton. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-093-DSDILGP | 4 May 2022 | All documents about the installation of the HillClose Estate timber outside boundary fence. | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-092-DSDILGP | 5 May 2022 | Briefing notes, presentations and reports held by Policy, Portfolio and Government Services, Quarantine Management Task Force or Office of the Director-General, about Compass Group Australia between 26 August 2021 and 3 May 2022, in regards to the Queenslander Regional Accommodation Centre. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-091-DSDILGP | 4 May 2022 | Briefing notes, presentations and reports held by Quarantine Management Task Force, Policy, Portfolio and Government Services or Office of the Director-General, about Aspen Medical between 26 August 2021 and 3 May 2022, in regards to the Queensland Regional Accommodation Centre. | Name withheld1 | Application withdrawn |
The Coordinator-General | RTI2122-089-TCG | 6 May 2022 | The development approval and development application for Kiernan Investments Pty Ltd’s Cleveland Bay Industrial Park. | Name withheld7 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-088-DSDILGP | 20 April 2022 | All correspondence regarding the Local government electoral expenditure caps discussion paper of April 2022. Time period / date range for request: 1 March 2022 to 20 April 2022 | Name withheld1 | Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $1,947.85 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-084-DSDILGP | 28 March 2022 | Documents relating to the Australian Government’s Financial Assistance Grant (FA Grant) allocations for the 2022-23 financial year, as administered/determined by the Queensland Local Government Grants Commission. The time period / date range for the request: 10 September 2020 to 23 March 2022. | Name withheld1 | Application withdrawn |
The Coordinator-General | RTI2122-083-TCG | 22 March 2022 | The Coordinator-General’s request(s) for additional information in relation to the Inland Rail - Border to Gowrie project, arising from the draft Environmental Impact Statement. | Name withheld7 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-082-DSDILGP | 21 March 2022 | All documents that informed the State Assessment Referral Agency’s (SARA) assessment and decision in relation the development application made by Hinchinbrook Shire Council (Reference 2008-18147 SRA). The development application was for a permit for: Time period / date range for the request: 1 August 2020 to 18 March 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-081-DSDILGP | 18 March 2022 | All documents relating to Tungamah Feedlot. Time period / date range for the request: 22 October 2021 to 31 December 2021 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-079-DSDILGP | 11 March 2022 | All correspondence to or from Noise Measurement Services that was provided to and/or considered by the Department or Minister in connection with the development application for the Mount Emerald Wind Farm located at Springmount Road and Kippin Drive, Arriga. | Mount Emerald Wind Farm Pty Ltd | Application finalised |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2122-075-DPMSDILGP | 3 March 2022 | Correspondence and briefings between the Deputy Premier (or staff within the Office of the Deputy Premier) and Wagner Corporation, between 1 October 2021 to the 24 February 2022, about the progress and operations of the Regional Quarantine Centre. Time period / date range for the request: 1 October 2021 to 24 February 2022. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-073-DSDILGP | 17 February 2022 | Ministerial briefing note (reference MBN21/1689) concerning a change application for SkyRidge (formerly Pacific View Estate). | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2122-068-DPMSDILGP | 2 February 2022 | All documents considered by Deputy Premier in deciding to call-in the development application for the recycling park proposed by Wanless Recycling Park Pty Ltd in Ebenezer. The Deputy Premier gave notice of the decision to call-in the development application on 27 January 2022. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-067-DSDILGP | 2 February 2022 | All documents considered by the Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure (Deputy Premier) in deciding to call-in the development application for the recycling park proposed by Wanless Recycling Park Pty Ltd in Ebenezer. The Deputy Premier gave notice of the decision to call-in the development application on 27 January 2022. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-064-DSDILGP | 28 January 2022 | Time period / date range for the request: 1 January 2021 to 28 January 2022 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-061-DSDILGP | 20 January 2022 | Correspondence concerning the Wellcamp quarantine facility in Toowoomba, created between 15 October 2021 and 20 January 2022, between any of the following entities: The application excludes correspondence that relates to any media enquiry. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-062-DSDILGP | 17 January 2022 | All material before the Director-General relating to the decision to make the policy entitled ‘COVID-19 vaccination requirements – 1 William Street’ including, but not limited to, all material relating to the consideration of the risk posed by COVID-19 including risk to employees and others, business continuity risks, and operational requirements. The application excludes: Time period / date range for the request: 1 October 2021 to 12 January 2022 | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-060-DSDILGP | 17 January 2022 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-058-DSDILGP | 22 December 2021 | All documents relating to the Ipswich City Council Temporary Local Planning Instrument No. 1 of 2021 (Resource Recovery and Waste Activity Regulation). | Cleanaway Solid Waste Pty Ltd | Application finalised Documents for RTI2122-058-DSDILGP- Part1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-057-DSDILGP | 21 December 2021 | The Ganden Report titled ‘STP Detailed Design for the Port Hinchinbrook sewage treatment plant’ which was provided to the Cassowary Coast Regional Council and the department in 2021. | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-055-DSDILGP | 20 December 2021 | Name withheld2 | Application finalised | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-056-DSDILGP | 16 December 2021 | All documents held by Coordinator-General, Economic Development Queensland (in particular documents held by the General-Manager and Executive Director, Development Strategy) and Legal Services (except legally privileged documents) in relation to the proposed compulsory acquisition of land at Currumbin owned by Martha’s Farm Pty Ltd. The application excludes: Time period / date range for the request: 1 September 2021 to 1 December 2021 | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2122-050-DPMSDILGP | 6 December 2021 | The time period / date range for the request: 1 September 2021 to 29 November 2021 | Name withheld1 | Application withdrawn |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2122-049-DPMSDILGP | 6 December 2021 | Time period / date range for the request: 1 September 2021 to 29 November 2021 | Name withheld1 | Application finalised1 |
Deputy Premier, Minister for State Development, Infrastructure, Local Government and Planning and Minister Assisting the Premier on Olympics Infrastructure | RTI2122-048-DPMSDILGP | 3 December 2021 | All documents relating to the ‘Proposed Call In Notice for a Development Application under the Planning Act 2016’ for 266-304 and 350 Coopers Road, Ebenezer, dated 29 November 2021 (Proposed Call In Notice), created between 1 July 2021 and 2 December 2021, and passing to, from or between one or more of the following: | McCullough Robertson Lawyers | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-047-DSDILGP | 3 December 2021 | All documents relating to the ‘Proposed Call In Notice for a Development Application under the Planning Act 2016’ for 266-304 and 350 Coopers Road, Ebenezer, dated 29 November 2021 (Proposed Call In Notice), created between 1 July 2021 and 2 December 2021, and passing to, from or between one or more of the following: The application excludes: | McCullough Robertson Lawyers | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-046-DSDILGP | 1 December 2021 | Documents revealing all interactions regarding the Wanless Recycling Park at Ebenezer, between the department and: The Planning Minister gave notice of a proposed call-in for the Wanless Recycling Park at Ebenezer on 29 November 2021. Time period / date range for the request: 1 May 2021 to 1 December 2021 | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-044-DSDILGP | 15 November 2021 | The decision brief and the assessment reports for both the Kaban and Chalumbin wind farms. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-043-DSDILGP | 12 November 2021 | All documents created for, or in relation to, the meeting between Minister Cameron Dick and Three Plus that was conducted on 10 September 2018, and is stated in the Minister’s diary as ‘Three Plus Connect Event with Departmental and Ministerial Staff’ Time period / date range for the request: 1 January 2018 to 1 October 2018 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-041-DSDILGP | 8 November 2021 | All documents concerning interaction between the department and the waste company REMONDIS Australia Pty Ltd, which has submitted an application to build a waste incinerator at its Swanbank site in Ipswich. Time period / date range for the request: 1 January 2020 to 8 November 2021 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-039-DSDILGP | 1 November 2021 | Name withheld1 | Application withdrawn | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-038-DSDILGP | 28 October 2021 | Having regard to proposed amendments to the Northshore Hamilton PDA Development Scheme (Scheme) and Development Charges Offset Plan (DCOP) to facilitate the Olympic Athletes Village: Time period / date range for the request: 1 January 2021 to 28 October 2021 | Northshore Group Qld Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-035-DSDILGP | 26 October 2021 | All documents lodged by REMONDIS Australia Pty Ltd (REMONDIS) as part of the application to gain coordinated project status for the REMONDIS Waste to Energy Facility, that was declared to be a coordinated project under Queensland Government Gazette No. 60 of Vol. 384, dated 29 June 2020. This includes, but is not limited to, all versions of the Initial Advice Statement, the last of which is dated 29 April 2020. Time period / date range for the request: 1 September 2018 to 1 October 2021 | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-031-DSDILGP | 1 October 2021 | The following documents relating to the Wellcamp quarantine facility, the Queensland Regional Accommodation Centre, from 1 April 2021 and 1 October 2021: | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-029-DSDILGP | 14 September 2021 | The application excludes: | Seven Network (Operations) Limited | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-027-DSDILGP | 6 September 2021 | Mount Emerald Wind Farm Pty Ltd | Application finalised Documents for RTI2122-027-DSDILGP | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-026-DSDILGP | 2 September 2021 | The contents of a database established by Economic Development Queensland to register classify and summarise submissions about the Toondah Harbour Priority Development Area Development Scheme (excluding information regarding the identity of people or organisations that made submissions). The existence of this submissions database is referred to in section 2.2 of the publicly available document titled ‘Toondah Harbour Priority Development Area Development Scheme Submissions Report: Under the Economic Development Act 2012’ dated May 2014. | Redlands2030 Inc. | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-025-DSDILGP | 30 August 2021 | Time period / date range for the request: 1 July 2020 to 30 August 2021. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-024-DSDILGP | 30 August 2021 | With respect to any emails captured by the scope of the application, the application is limited to final email chains and any one-off emails only, as well as any individual email(s) that form part of a relevant final email that contained an attachment(s) (where the attachment does not form part of the final chain email). The application also excludes: | Martha’s Farm Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-017-DSDILGP | 17 August 2021 | Australian Conservation Foundation | Application finalised Documents for RTI2122-017-DSDILGP: | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-015-DSDILGP | 12 August 2021 | Documents in relation to the Director-General’s expenses specifically: Time period / date range for the request: 1 July 2020 to 12 August 2021 | Seven Network | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-009-DSDILGP | 14 July 2021 | Name withheld1 | Application withdrawn | |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-007-DSDILGP | 13 July 2021 | Time period / date range for the request: January 2002 to December 2005 and January 2016 to July 2021 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-004-DSDILGP | 6 July 2021 | Official notices and emails, between the then Department of State Development, Manufacturing and Planning and Gympie Regional Council (GRC) or Department of Environment and Science, in relation to GRC Temporary Local Planning Instrument 02/19 - Southside Structure Plan and/or Temporary Local Planning Instrument03/19 - Protection of Biodiversity Values. With regards to emails, the application is limited to: Time period / date range for the request 8 November 2019 to 29 November 2019 and 3 February 2020 to 23 February 2020. | The Gympie Times / News Corp Australia | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2122-001-DSDILGP | 6 July 2021 | Time period / date range for the request: 29 June 2020 to 29 June 2021. | BMI Group Pty Ltd | Application finalised |
The Coordinator-General | RTI2021-082-TCG | 29 June 2021 | All submissions to the Coordinator-General concerning the draft Environmental Impact statement for the Border to Gowrie Project of Inland Rail. Time period / date range for the request: January to May 2021 | Name withheld7 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-081-DSDILGP | 2 June 2021 | The following documents, created between 1 January 2021 and 2 June 2021, concerning Cross River Rail: The application excludes: | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-079-DSDILGP | 28 May 2021 | All correspondence between Australia Country Choice Production Pty Ltd, Cannon Hill Investments, Kinneally Miley Law or a nominated individual and the Department of State Development, Infrastructure, Local Government and Planning in relation to: Time period / date range for the request: 1 January 2019 to 28 May 2021 | BMI Group Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-077-DSDILGP | 19 May 2021 | Ministerial briefing notes relating to Queen’s Wharf Documents, created between 1 February 2021 and 19 May 2021, that are held by the Director-General and/or Deputy Directors-General. | Seven Network (Operations) Limited | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-076-DSDILGP | 13 May 2021 | Communication and records of decision-making between the former Department of State Development, Manufacturing and Planning and Gympie Regional Council (GRC), and between the former Department of State Development Manufacturing and Planning and the Department of Environment and Science, in relation to the proposed GRC Temporary Local Planning Instrument 02/19 - Southside Structure Plan Area (TLPI 02/19) and Temporary Local Planning Instrument 03/19 - Protection of Biodiversity values (TLPI 03/19). Time period / date range for the request: 30 April 2019 to 30 April 2020. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-068-DSDILGP | 19 April 2021 | Any material relating to the funding granted to Central Highlands Regional Council for the 'Emerald Saleyards Upgrade' project. Time period / date range for the request: 1 July 2017 to 19 April 2021 | Name withheld1 | Application withdrawn |
Former Deputy Premier and Minister for State Development, Infrastructure, Local Government and Planning | RTI2021-067-DPMSDILGP | 9 April 2021 | All documents relating to the development application regarding the Mount Emerald Wind Farm project at Kippen Drive, Arriga, Queensland (also identified as Lot 7 on SP298413, formally described at Lot 7 on SP235244), as: Time period / date range for the request: 11 June 2014 to 6 April 2021 | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-066-DSDILGP | 7 April 2021 | Documents and files relating to noise requirements, noise assessments and/or noise impact assessments for the development application for the Mount Emerald Wind Farm project as: Time period / date range for the request: 11 June 2014 to 6 April 2021 | Marshall Day Acoustics Pty Ltd | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-065-DSDILGP | 31 March 2021 | Ministerial briefing notes, reports, correspondence such as emails and text messages, relating to Queen's Wharf, created between 1 February 2021, to 31 March 2021, that are held by the Director-General and/or Deputy Directors-General. The application excludes: | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-064-DSDILGP | 31 March 2021 | Ministerial briefing notes, reports, correspondence such as emails and text messages, relating to Cross River Rail, created between 1 February 2021 and 31 March 2021 that are held by the Director-General and/or Deputy Directors-General. The application excludes: | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-060-DSDILGP | 8 March 2021 | The following documents concerning the REMONDIS waste incinerator project that was gazetted by the Queensland Government on 29 June 2020: Time period / date range for the request: 1 September 2018 to 22 February 2021 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-061-DSDILGP | 2 March 2021 | Time period / date range for the request: 1 January 2014 to 31 December 2020 | Name withheld1 | Application finalised Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $1,672.00. |
The Coordinator-General | RTI2021-057-TCG | 1 March 2021 | All documents regarding any interaction between the waste company REMONDIS Australia Pty Ltd and the Coordinator-General regarding an application for any waste activity at Willowbank or Ebeneezer in Ipswich. Time period / date range for the request: 1 January 2020 to 18 February 2021. | Name withheld7 | Application withdrawn |
The Coordinator-General | RTI2021-056-TCG | 1 March 2021 | All documents regarding any interaction between the waste company REMONDIS Australia Pty Ltd and the Coordinator-General regarding an application for a waste incinerator (waste to energy) at Swanbank in Ipswich. Time period / date range for the request: 1 January 2020 to 31 December 2020 | Name withheld7 | Application withdrawn |
The Coordinator-General | RTI2021-055-TCG | 1 March 2021 | All documents regarding any interaction between the waste company REMONDIS Australia Pty Ltd and the Coordinator-General regarding an application for a waste incinerator (waste to energy) at Swanbank in Ipswich. Time period / date range for the request: 1 January 2019 to 31 December 2019 | Name withheld7 | Application withdrawn |
The Coordinator-General | RTI2021-054-TCG | 1 March 2021 | All documents regarding any interaction between the waste company REMONDIS Australia Pty Ltd and the Coordinator-General regarding an application for a waste incinerator (waste to energy) at Swanbank in Ipswich Time period / date range for the request: 1 January 2018 to 31 December 2018 | Name withheld7 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-058-DSDILGP | 18 February 2021 | All documents created between June 2015 and 5 February 2021 concerning representations made by the applicant in relation to: | Name withheld1 | Application finalised2 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-050-DSDILGP | 1 February 2021 | Correspondence and enclosures between the Noosa Shire Council and the department about the proposed planning scheme amendment dealing with Natural Hazards (Erosion). Time period / date range for the request: 1 August 2020 to 31 January 2021 | Name withheld2 | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-049-DSDILGP | 21 January 2021 | The internal investigation report prepared in response to a complaint made by the applicant. Time period / date range for the request: June 2019 to February 2020 | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-043-DSDILGP | 21 December 2020 | Any emails, correspondence or other documents relating to, but not limited to, lobbyist activities, submissions, requests, passing between Departmental staff, the Minister or the Minister's office, any representative of Stockwell and any representative of the Coles Group in relation to the proposed Noosa Shire Council Planning Scheme that relate to the following issues: Time period / date range for the request: 1 July 2019 to 31 March 2020 | Noosa Shire Council | Application finalised |
Queensland Treasury | RTI2021-041-QT | 10 December 2020 | The final report authored by Ganden Engineers and Project Managers relating to the Sewerage Treatment Plant at Port Hinchinbrook. Time period / date range for the request: 1 July 2020 to 10 December 2020. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-040-DSDILGP | 9 December 2020 | Time period / date range for the request: 29 July 2020 to 19 August 2020. | Name withheld2 | Application finalised |
Queensland Treasury | RTI2021-038-QT | 2 December 2020 | The Ganden Report on the sewerage system at Cardwell/Port Hinchinbrook and any affiliated documents such as the brief provided to Ganden or specifications outlining the required scope of works. Time period / date range for the request: 1 January 2019 to 2 December 2020. | Name withheld2 | Application finalised |
Queensland Treasury | RTI2021-037-QT | 2 December 2020 | Time period / date range for the request: 1 January 2019 to 2 December 2020. | Name withheld1 | Application withdrawn |
Former Minister for Regional Development and Manufacturing and Minister for Water | RTI2021-035-MRDMMW | 26 November 2020 | Communications to or from, or in relation to, Anacta Strategies, Evan Moorhead or David Nelson. Time period / date range for the request: 11 May 2020 to 15 October 2020. | Name withheld1 | Application finalised1 |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-036-DSDILGP | 26 November 2020 | Working for Queensland survey results for the former Department of Local Government, Racing and Multicultural Affairs, as provided to the department. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-033-DSDILGP | 23 November 2020 | Time period / date range for the request: 1 March 2020 – 20 November 2020. | Name withheld1 | Application finalised1 |
Queensland Treasury | RTI2021-032-QT | 20 November 2020 | Engineering report into option to renew a sewerage treatment plant at Port Hinchinbrook in North Queensland. The report was prepared by an engineering consultancy firm called Ganden Engineers and Project Managers. Time period / date range for the request: January 2020 to June 2020. | Name withheld1 | Application withdrawn |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-028-DSDILGP | 12 November 2020 | Time period / date range for the request: 10 January 2018 to 10 November 2020. | Name withheld1 | Application finalised Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $776.00. |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-025-DSDILGP | 2 November 2020 | Time period / date range for the request: 18 May 2016 to 14 September 2016. | The Courier-Mail | Application finalised |
Department of State Development, Infrastructure, Local Government and Planning | RTI2021-024-DSDILGP | 30 October 2020 | Any guidance, advice or similar provided to staff, consultants or agents of Walker Toondah Harbour Pty Ltd, Walker Group Holdings Pty Ltd or associated organisations regarding the Toondah Harbour development environmental impact statement process’ relevant to, or interaction with, the Toondah Harbour Priority Development Area Development Scheme, Toondah Harbour Priority Development Area and other State assessment processes. Time period / date range for the request: 1 April 2019 to 30 October 2020 | Name withheld1 | Application withdrawn |
Queensland Treasury | RTI2021-022-QT | 22 October 2020 | Time period / date range for the request: 27 May 2020 to 22 October 2020 | Roubaix Properties No 3 Pty Ltd | Application finalised |
Queensland Treasury | RTI2021-020-QT | 22 October 2020 | The letter dated 30 May 2018 sent by the former Minister for State Development, Manufacturing, Infrastructure and Planning to Councillor Tom Gilmore, Mayor of Mareeba Shire Council, regarding approvals issued by Council for rural residential and rural lifestyle subdivisions. | Name withheld2 / Kuranda Region Planning Group | Application finalised |
Former Treasurer, Minister for Infrastructure and Planning | RTI2021-021-TMIP | 21 October 2020 | Time period / date range for the request: 22 August 2020 to 21 October 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Tourism and Innovation | RTI2021-016-DSDTI | 25 September 2020 | Any guidelines provided to staff, consultants or agents of Walker Toondah Harbour Pty Ltd, Walker Group Holdings Pty Ltd or associated organisations regarding the environmental impact statement process for the proposed Toondah Harbour development at Moreton Bay, including relevant to the Toondah Harbour Priority Development Area and other State assessment processes. Time period / date range for the request: 1 April 2019 to 25 September 2020 | Name withheld1 | Application finalised1 |
Former Department of State Development, Tourism and Innovation | RTI2021-014-DSDTI | 11 September 2020 | The following documents concerning the REMONDIS waste incinerator project that was gazetted by the Queensland Government on 29 June 2020: Time period / date range for the request: 1 September 2018 to 11 September 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Tourism and Innovation | RTI2021-012-DSDTI | 2 September 2020 | Contract(s) for the River to Bay project. | Name withheld1 | Application withdrawn |
Queensland Treasury | RTI2021-011-QT | 28 August 2020 | Time period / date range for the request: 2019 to 2020 | Name withheld2 | Application finalised |
Queensland Treasury | RTI2021-010-QT | 21 August 2020 | Time period / date range for the request: 1 March 2015 to 26 November 2016. | Australian Conservation Foundation | Application finalised |
Former Department of State Development, Tourism and Innovation | RTI2021-008-DSDTI | 12 August 2020 | Time period / date range for the request: 1 January 2016 to 12 August 2020 | Riverside Development Pty Ltd | Application finalised |
Former Department of State Development, Tourism and Innovation | RTI2021-005-DSDTI | 29 July 2020 | Documents concerning the creation of a book for the Commonwealth Games. | Name withheld1 | Application finalised1 |
Former Department of State Development, Tourism and Innovation | RTI2021-003-DSDTI | 17 July 2020 | All documents having regard to planning controls such as the Logan City Planning Scheme 2015 and/or the South East Queensland Regional Plan 2009 and/or the South East Queensland Regional Plan 2017 (Schemes) which refer to, identify or consider the land use outcomes for the applicant’s land. Time period / date range for the request: 1 June 2016 to 1 October 2019. | Name withheld1 | Application finalised1 |
Former Department of State Development, Tourism and Innovation | RTI2021-002-DSDTI | 17 July 2020 | All documents having regard to planning controls such as the Logan City Planning Scheme 2015 and/or the South East Queensland Regional Plan 2009 and/or the South East Queensland Regional Plan 2017 (Schemes) which refer to, identify or consider the land use outcomes for the applicant’s land. Time period / date range for the request: 1 June 2016 to 1 October 2019. | Name withheld1 | Application finalised1 |
Queensland Treasury | RTI2021-001-QT | 2 July 2020 | All application documents, supporting documents, reports, plans memoranda, letters and approval documents related to: Time period / date range for the request: 1 January 2006 to 31 October 2013 | Name withheld1 | Application withdrawn |
Former Department of State Development, Tourism and Innovation | RTI1920-073-DSDTI | 23 June 2020 | The legal instrument that gives effect to the appointment of the Chief Entrepreneur and any briefing note or memo to the decision-maker about the terms of the instrument. | Name withheld2 (Member of parliament) | Application finalised |
Former Minster for State Development, Tourism and Innovation | RTI1920-072-MSDTI | 19 June 2020 | Any correspondence between the Minister, the Minister's office and Virgin Australian’s management about Queensland’s border closure. Time period / date range for the request: 1 May 2020 to 19 June 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Tourism and Innovation | RTI1920-062-DSDTI | 16 June 2020 | Name withheld1 | Application withdrawn | |
Former Department of State Development, Tourism and Innovation | RTI1920-067-DSDTI | 28 May 2020 | Report/s related to the contamination of the Oxley Priority Development Area. Time period / date range for the request: 1 January 2018 to 31 December 2019 | Name withheld1 | Application withdrawn |
Queensland Treasury | RTI1920-061-QT | 26 May 2020 | Name withheld2 | Application finalised | |
Queensland Treasury | RTI1920-060-QT | 26 May 2020 | Name withheld2 | Application finalised | |
Former Department of State Development, Tourism and Innovation | RTI1920-065-DSDTI | 14 May 2020 | All briefs and correspondence provided to Minister Kate Jones between 11 and 14 May 2020. Time period / date range for the request: 11 May 2020 to 14 May 2020 | Name withheld1 | Application withdrawn |
Former Department of Regional Development and Manufacturing | RTI1920-066-DRDM | 14 May 2020 | All briefing notes and correspondence provided to Minister Glenn Butcher between 11 and 14 May 2020. Time period / date range for the request: 11 May 2020 to 14 May 2020 | Name withheld1 | Application withdrawn |
Queensland Treasury | RTI1920-063-QT | 29 April 2020 | Operational Works Application and development application submitted by the City of Gold Coast for Shared Path Project Surfers South Oceanway in the coastal management district. Time period / date range for the request: 1 March 2019 to 28 April 2020 | Name withheld1 | Application finalised1 |
Queensland Treasury | RTI1920-059-QT | 6 April 2020 | The assessment report prepared by the Department of State Development, Manufacturing, Infrastructure and Planning regarding the request from Noosa Shire Council for approval to adopt the proposed Noosa Plan 2020 | Name withheld2 | Application finalised |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1920-057-MLGMRMMA | 31 March 2020 | Correspondence, memos and briefing notes between Queensland mayors, councillors, the Minister, Queensland Health, Local Government Association of Queensland and the former Department of Local Government, Racing and Multicultural Affairs relating to the decision to keep the Queensland 2020 local government elections going during the coronavirus pandemic. Time period / date range for the request: 1 January 2020 to 27 March 2020. | Name withheld1 | Application withdrawn |
The Coordinator-General | RTI1920-038-TCG | 12 March 2020 | Name withheld7 | Application finalised Documents were not accessed by the applicant. The documents may be accessed by contacting the Right to Information team and paying the applicable processing charge. Processing charge: $777.15 | |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-051-DSDMIP | 5 March 2020 | The following documents relating to the Lake Eyre Basin (LEB) Review conducted by Department of Environment and Science and/or the department: | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1920-054-DLGRMA | 5 March 2020 | Any briefing notes, emails, memos or correspondence (in final or draft form) to or from Andrew Sly in relation to Cronulla Park and PCYC Queensland. Time period / date range for the request: 1 December 2017 to 5 March 2019 | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1920-053-DLGRMA | 5 March 2020 | Any briefing notes, emails or correspondence to or from the Minister's office in relation to the Cronulla Park master plan and PCYC Queensland. Time period / date range for the request: 1 December 2017 to 5 March 2019 | Office of the Leader of the Opposition | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1920-052-DLGRMA | 5 March 2020 | Feedback in any replies received in response to a letter dated 19 November 2019 co-signed by the Premier and Minister Hinchliffe about the Works for Queensland program. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-048-DSDMIP | 27 February 2020 | The minister's approval of the draft Planning Scheme for Noosa Shire Council given in accordance with Step 17 of the Chief Executive's Notice under section 18(3) of the Planning Act 2016 to the Noosa Shire Council. Time period / date range for the request: 14 February 2020 to 21 February 2020 | Name withheld2 | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-047-MSDMIP | 25 February 2020 | The official diaries of Assistant Minister for State Development, Julieanne Gilbert MP, that set out meetings taken in the official capacity as Assistant Minister. Time period / date range for the request: 23 September 2019 to 22 February 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-046-DSDMIP | 19 February 2020 | Time period / date range for the request: 11 December 2019 to 19 February 2020. | Name withheld2 | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-041-MSDMIP | 11 February 2020 | Time period / date range for the request: 1 December 2019 to 11 February 2020 | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-045-DSDMIP | 11 February 2020 | All reports, findings, letters and memo's prepared by the Department of Infrastructure and Planning and submitted to the Crime and Corruption Commission directly relating in relation to a complaint made by the applicant to the Department of Infrastructure and Planning. Time period / date range for the request: 22 May 2019 to 11 February 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-044-DSDMIP | 11 February 2020 | Advice and/or report prepared by the department in response to an internal investigation. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-043-DSDMIP | 11 February 2020 | The full report, findings and recommendations that the department compiled to develop their conclusions summarised in a letter to the applicant regarding an internal investigation of a complaint made by the applicant. Time period / date range for the request: May 2019 to February 2020 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-042-DSDMIP | 11 February 2020 | Time period / date range for the request: 1 May 2019 to 11 February 2020 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-039-DSDMIP | 10 February 2020 | Time period / date range for the request: 1 December 2019 to 10 February 2020. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1920-040-DLGRMA | 10 February 2020 | Time period / date range for the request: 1 July 2017 to 31 December 2019 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-037-DSDMIP | 31 January 2020 | Time period / date range for the request: 27 September 2014 to 31 January 2020 | Flight Path Forum Inc | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-035-DSDMIP | 28 January 2020 | All ministerial briefing notes and correspondence to or from the Minister's office concerning a Development Application by Ridong (Australia) International Pty Ltd in relation to a proposed resort at Tallebugera Connection Road, Tallebudgera (COM/2018/47). The application excludes: | Office of the Leader of the Opposition | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-034-DSDMIP | 15 January 2020 | The Scenic Rim Regional Council (SRRC) submission to the state government draft 2017 Regional Plan as it relates specifically to Beechmont Plateau RLRPA designation. Time period / date range for the request: 2017 | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-033-DSDMIP | 15 January 2020 | The following documents concerning two nominated recruitment processes: Time period/date rage of the request: 1 October 2019 to 10 January 2020 | Name withheld1 | Application finalised2 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-031-DSDMIP | 11 December 2019 | For land situated at 600 Coronation Drive, Toowong (the former ABC site), all documents in relation to: Time period / date range for the request: 1 January 2019 to 11 December 2019 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-028-DSDMIP | 29 November 2019 | Correspondence exchanged between the Department of State Development, Manufacturing, Infrastructure Planning and Brisbane City Council in relation to Brisbane City Council's Major Amendment Package H to Brisbane City Plan 2014, from the end of public notification on 26 August 2019 to 29 November 2019. | YQ Property Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-021-DSDMIP | 18 November 2019 | The following documents held by Economic Development Queensland (EDQ) concerning the properties situated at 45 and 57 Curtin Avenue West, Hamilton and 60 and 240 Macarthur Avenue, Hamilton in the Hamilton North Shore Priority Development Area: | Portside Cruise and Airport Parking Pty Ltd | Application finalised5 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-022-DSDMIP | 23 October 2019 | An Infrastructure Agreement dealing with the municipal charges for the Yarrabilba Priority Development Area, likely executed between the Minister for Economic Development Queensland (MEDQ) and Lendlease. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-019-DSDMIP | 14 October 2019 | The Chief Executive's notice to Noosa Shire Council dated 19 March 2018 concerning Council’s new planning scheme lists (in Step 3 on page 3) a number of documents the Council is required to give with its notice to commence the State interest review. The document being sought is the document referred to at number 2 of the list, namely ‘A written statement addressing the state interests in the relevant regional plan and State Planning Policy (SPP)…'. | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-018-DSDMIP | 11 October 2019 | Report prepared by the Department in response to a complaint. | Name withheld1 | Application finalised1 |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-016-MSDMIP | 9 October 2019 | Documents created in the Office of the Minister or the department containing information prepared in advance for the Minister’s meetings on 24 August 2019 at the ALP Business Partnership Program. Time period / date range for the request: 30 June 2019 to 24 August 2019. | Name withheld1 | Application finalised1 |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-015-MSDMIP | 2 October 2019 | Documents concerning the decision-making process to lower the Paradise Dam wall. | Name withheld1 | Application finalised1 |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1920-014-MLGMRMMA | 2 October 2019 | Documents concerning the decision-making process to lower the Paradise Dam wall. Time period / date range for the request: 1 January 2018 to 24 September 2019. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-013-DSDMIP | 2 October 2019 | Time period / date range for the request: 1 August 2018 to 2 October 2019 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-012-DSDMIP | 26 September 2019 | Documents concerning the decision-making process to lower the Paradise Dam wall. | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1920-011-DLGRMA | 26 September 2019 | Documents concerning the decision-making process to lower the Paradise Dam wall. Time period / date range for the request: 1 January 2018 to 24 September 2019. | Name withheld1 | Application finalised1 |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-009-MSDMIP | 25 September 2019 | Documents containing or evidencing communication between Anacta Strategies and any of the following: Time period / date range for the request:17 May 2019 and 24 September 2019 | Office of the Leader of the Opposition | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-008-DSDMIP | 17 September 2019 | All documents relating to communication to and from City of Gold Coast for the management of koalas in respect of Lots 6, 7, 8, 11, 12, 13, 14, 15 and 16 on RP50178, Lot 121 of RP903491; Lot 15 on SP14531 and Lot 71 on W31402 (collectively known as the ‘Greenridge Land’) in respect of preparation of: | Hamelech Basodeh Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-006-DSDMIP | 9 September 2019 | All correspondence between the State and the Moreton Bay Regional Council (MBRC) regarding the State's review and the current position of the MBRC Planning Scheme. | Brisbane Times | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1920-003-MSDMIP | 2 September 2019 | Time period / date range for the request: 2014-2018 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1920-004-DSDMIP | 29 August 2019 | The development proposals submitted by all short-listed proponents for the Toondah Harbour PDA, following the 2014 request for Expressions of Interest (E-Tender Ref #: EDQ-10-229/14). | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-090-DSDMIP | 24 July 2019 | Documents provided by the Cross River Rail Delivery Authority to the department to consult about a potential Priority Development Area centered around the Boggo Road Cross River Rail station. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-088-DSDMIP | 11 July 2019 | The report produced out of the 'Assessment of value for money - Made in Queensland’. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-087-DSDMIP | 2 July 2019 | An itemised summary/copy of all costs/expenses paid by the department, as the respondent to appeal proceedings in the Planning and Environment Court (appeal no. 3705/17). Time period / date range for the request: 29 March 2019 to 2 July 2019 | Name withheld1 | Application finalised5 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-078-DSDMIP | 17 June 2019 | All documents relating to a recruitment process that contain the applicant’s personal information. Time period / date range for the request: 1 October 2018 to 22 May 2019. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-084-DSDMIP | 14 June 2019 | Name withheld1 | Application finalised1 | |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-083-DSDMIP | 7 June 2019 | Name withheld1 | Application withdrawn | |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1819-081-MLGMRMMA | 4 June 2019 | All documents concerning the Ipswich Turf Club upgrade. Time period / date range for the request: 1 February 2015 to 9 May 2019 | Name withheld1 | Application withdrawn |
The Coordinator-General | RTI1819-080-TCG | 3 June 2019 | The Coordinator-General’s diary relating to meetings in the last 18 months concerning: | Name withheld7 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-082-DSDMIP | 3 June 2019 | All planning approvals and approved plans for, and correspondence with the local authority for Blackwater in relation to, development approvals for a property in Doon Street, Blackwater from 1 September 2011 to 30 September 2013. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-079-DSDMIP | 31 May 2019 | All documents and materials related to communications and/or complaints to and from the community group Save the North Lakes Golf Course Inc (and/or any of its representatives or members) in respect of: Time period / date range for the request: 1 July 2018 to 27 May 2019. | The Village Retirement Group | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-077-DSDMIP | 10 May 2019 | Name withheld1 | Application withdrawn | |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1819-075-MLGMRMMA | 9 May 2019 | All documents concerning the Ipswich Turf Club upgrade. Time period / date range for the request: 1 February 2015 to 9 May 2019 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-074-DSDMIP | 8 May 2019 | Time period / date range for the request: 1 December 2016 to 31 March 2019. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-073-DSDMIP | 26 April 2019 | Seven Network | Application finalised | |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-072-DSDMIP | 23 April 2019 | Seven Network | Application finalised | |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-071-DLGRMA | 12 April 2019 | Documents relating to a property in the City of Gold Coast local government area. | Name withheld1 | Application withdrawn |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1819-066-MSDMIP | 3 April 2019 | Documents relating to the infrastructure charges raised by the Minister for Economic Development Queensland for the Greater Flagstone Priority Development Area, as detailed in the document dated 30 November 2018 titled ‘Infrastructure Funding Framework’. | Maclean Bridge Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-067-DSDMIP | 3 April 2019 | Documents relating to the infrastructure charges raised by the Minister for Economic Development Queensland for the North Maclean Precinct of the Greater Flagstone Priority Development Area, as detailed in the document dated 30 November 2018 titled ‘Infrastructure Funding Framework’. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-070-DSDMIP | 29 March 2019 | An itemised summary/copy of all costs/expenses paid by the department, as the respondent to appeal proceedings in the Planning and Environment Court (appeal no. 3705/17). | Name withheld1 | Application finalised5 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-069-DSDMIP | 28 March 2019 | All documents sent between the Department of State Development, Manufacturing, Infrastructure and Planning and Department of Environment and Science or Noosa Shire Council, about the proposed Noosa planning scheme and any of the following: Time period / date range for the request: 31 May 2018 to 21 January 2019 | Name withheld2 | Application finalised Documents for RTI1819-069-DSDMIP: |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-065-DLGRMA | 21 March 2019 | Documents regarding a complaint pertaining to an illegal structure allegedly being constructed at a property in the Burdekin Shire Council. Time period / date range for the request: September 2018 to March 2019. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-063-DLGRMA | 8 March 2019 | Documentation and information supplied by the Cassowary Coast Regional to Queensland Fire and Emergency Services Cairns regarding property at Murrigal. Time period / date range for the request: November 2016 to March 2017. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-064-DLGRMA | 5 March 2019 | Documents relating to Lakeview Caravan Park. Time period / date range for the request: 1 June 2015 to 31 July 2017. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-060-DLGRMA | 13 February 2019 | Contaminated land matters, Environmentally Relevant Activities and documents, lab reports or drawings relating to contaminated land investigation for the site at a property in Rockhampton. Time period / date range for the request: 1960 to 13 February 2019. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-059-DSDMIP | 12 February 2019 | The application excludes: Time period / date range for the request: 1 January 2018 to 31 January 2019. | Australian Broadcasting Corporation | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-058-DLGRMA | 11 February 2019 | Documents relating to a parking ticket issued by the City of Gold Coast. | Name withheld1 | Application withdrawn |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1819-057-MSDMIP | 1 February 2019 | All correspondence (including letters and emails) between the Minister and federal Opposition Infrastructure spokesman Anthony Albanese during 1 July 2018 to 1 February 2019. | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-056-DLGRMA | 30 January 2019 | The following documents relating to the establishment of the Picnic Bay Mall on Magnetic Island: Time period / date range for the request: 1984 to November 1986. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-053-DSDMIP | 14 January 2019 | All permits, registrations, development approvals (self-assessable development approvals) and certifications issued to Eureka Aquarium Supplies for the operation as a freshwater aquaculture facility in Queensland under the regulation of Queensland Fisheries. | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-052-DSDMIP | 21 December 2018 | in respect of the Period and in connection with or relating to the matter of: Time period / date range for the request: 1 January 2016 to 19 December 2018. | Name withheld2 | Application finalised Documents for RTI1819-052-DSDMIP: |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-051-DLGRMA | 21 December 2018 | Documents regarding correspondence I have had with Toowoomba Regional Council in regard to Drains affecting a property in Ravensbourne. Time period / date range for the request: 1 January 2013 to 21 December 2018. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-050-DLGRMA | 18 December 2018 | Any documents, reports or emails concerning the risk of fraud related to rolling-out the Works for Queensland project. Time period / date range for the request: 2017 to 2018 | Australian Broadcasting Corporation | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-048-DSDMIP | 23 November 2018 | With reference to the public consultation for the Southport Spit Master Plan, a document containing a list detailing how many surveys were completed by each individual IP address. Time period / date range for the request: 16 February 2018 to 25 March 2018 | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-047-DLGRMA | 13 November 2018 | All documents relating to the appointment and selection of panel members for the Inquiry know as a Review of the Conduct on the 2016 Local Government Elections, the Referendum and the Toowoomba South By-Election. Time period / date range for the request: 1 March 2016 to 31 October 2016 | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-046-DLGRMA | 6 November 2018 | All documents that relate to shell grit harvesting businesses in Hervey Bay and Fraser Coast. | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-033-DLGRMA | 29 October 2018 | Documents in relation to a complaint involving the applicant. Time period / date range for the request: 1 October 2017 to 31 October 2018 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-043-DSDMIP | 25 October 2018 | The stage 1 initial proposal and the stage 2 detailed proposal submitted in relation to AEG Ogden's market-led proposal for the Brisbane Live development. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-042-DSDMIP | 23 October 2018 | Aquaculture development approvals (with their conditions) given by the State Assessment and Referral Agency. Time period / date range for the request: 1 July 2013 to 23 October 2018 | Name withheld2 | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-040-DLGRMA | 23 October 2018 | Documents related to all lantana and weeds operations across Moreton Bay Regional Shire in relation to Works programs and Eradication programs. Time period / date range for the request: 1 January 2016 to 23 October 2018 | Name withheld1 | Application withdrawn |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1819-041-MLGMRMMA | 22 October 2018 | Seven Network (Operations) Limited | Application finalised | |
The Coordinator-General | RTI1819-039-TCG | 19 October 2018 | The following documents in relation to the Abbot Point State Development Area development application AP2017/011- Port Facilities (T1): Time period / date range for the request: 1 May 2018 to 19 October 2018 | Name withheld7 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-037-DSDMIP | 18 October 2018 | The formal notice that was issued in October 2018 to Moreton Bay Regional Council (MBRC) advising of the Minister's decision not to proceed with amendment to MBRC's planning scheme. | Trask Development Corporation No. 14 Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-036-DSDMIP | 17 October 2018 | Documents in relation to a change to the Proponent for the following projects: The change may include a notice given by a Proponent under sections 27AE of the State Development and Public Works Organisation Act 1971 to the Coordinator-General. | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-035-DSDMIP | 11 October 2018 | All correspondence between the State and the Moreton Bay Regional Council (MBRC) regarding the State's review and the current position of the MBRC Planning Scheme. This includes, but is not limited to: Time period / date range for the request: 7 June 2018 to 1 August 2018 | Trask Development Corporation No. 14 Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-027-DSDMIP | 3 October 2018 | Correspondence (including electronic communications) regarding or in connection with any of Societe Miniere de Sud Pacifique (SMSP) or named representatives of SMSP between: Time period / date range for the request: 1 May 2018 to 8 June 2018 | Mineralogy Pty Ltd | Application finalised5 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-031-DSDMIP | 27 September 2018 | The draft dated October 1996 of the document referenced as: Major district centres: scoping study/prepared for SEQ 2001 by Planning Workshop Australia Spring Hill: Planning Workshop Australia, 1995. Time period / date range for the request: 1 January 1995 to 31 December 1996 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-030-DSDMIP | 26 September 2018 | Briefing notes (including drafts) regarding any market-led proposals for a Brisbane aquarium. Time period / date range for the request: 1 July 2017 to 16 August 2018 | Office of the Leader of the Opposition | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-029-DSDMIP | 26 September 2018 | The following documents relating to the Cairns Marine Precinct Growth Strategy (the Strategy) that the professional services firm, GHD, was contracted to undertake: | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-028-DSDMIP | 25 September 2018 | Name withheld1 | Application withdrawn | |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1819-032-MSDMIP | 19 September 2018 | For the period 1 May 2018 to 8 June 2018, correspondence (including electronic communications) between the Minister for State Development, Manufacturing, Infrastructure and Planning and any staff member of the Department of State Development, Manufacturing, Infrastructure and Planning regarding or in connection with any of Societe Miniere de Sud Pacifique (SMSP) or named representatives of SMSP. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-025-DSDMIP | 14 September 2018 | All submissions made by Shadforth Industries Pty Ltd or Covey Associates Pty Ltd on the draft South East Queensland Regional Plan 2016, Shaping SEQ. | Name withheld1 | Application withdrawn |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1819-022-MSDMIP | 4 September 2018 | All documents showing who the Minister was scheduled to meet, and met, as part of the business observers program at the recent Labor Party State Conference, any correspondence with those observers and any briefing notes related to the meetings. | Name withheld1 | Application finalised1 |
Former Minister for Local Government, Minister for Racing and Minister for Multicultural Affairs | RTI1819-021-MLGMRMMA | 4 September 2018 | All documents showing who the Minister was scheduled to meet, and met, as part of the business observers program at the recent Labor Party State Conference, any correspondence with those observers and any briefing notes related to the meetings. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-010-DSDMIP | 21 August 2018 | Name withheld1 | Application withdrawn | |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-019-DLGRMA | 20 August 2018 | All surveying information, cross department record exchange, imagery, aerial photos, memos, notes, phone logs, emails, soil samples, water testing reports including bores and creek/river testing, access points, eviction notices, lease agreements, court proceedings, fire permits, logs and reports of access to property any applications for work on particular properties owned or used by the applicant. | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-018-DSDMIP | 16 August 2018 | The following documents relating to market-led proposals for a Brisbane theatre or for a Brisbane aquarium: Time period / date range for the request: 1 July 2017 to 16 August 2018 | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-016-DLGRMA | 10 August 2018 | Records, communications and details in relation to the distribution of funds under the Community Resilience Fund for 2015/2016, including but not limited to: | Carpentaria Shire Council | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-002-DSDMIP | 9 August 2018 | The following documents in connection with the proposed Townsville lithium-ion battery project for the period 28 May 2018 to 8 June 2018: Schedule 1 | Name withheld2 | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-015-DSDMIP | 9 August 2018 | The following documents in connection with the proposed Townsville lithium-ion battery project for the period 1 May 2018 to 9 May 2018: Schedule 1 | Mineralogy Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-014-DSDMIP | 9 August 2018 | The following documents in connection with the proposed Townsville lithium-ion battery project for the period 19 May 2018 to 27 May 2018: Schedule 1 | QNI Metals Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-013-DSDMIP | 9 August 2018 | The following documents in connection with the proposed Townsville lithium-ion battery project for the period 10 May 2018 to 18 May 2018 inclusive: Schedule 1 | QNI Resources Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-011-DSDMIP | 3 August 2018 | All correspondence between the State and the Moreton Bay Regional Council (MBRC) regarding the State's review and the current position of the MBRC Planning Scheme. Time period / date range for the request: 7 June 2018 to 1 August 2018 | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-008-DLGRMA | 25 July 2018 | The following documents, created since 1 January 2018, relating to the cost of turf at Eagle Farm and Doomben racecourses: The application excludes: | Seven Network (Operations) Limited | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTI1819-009-MSDMIP | 19 July 2018 | The agreement executed by the Mayor of the City of Townsville with Imperium3 and witnessed by Premier Annastacia Palaszczuk on or about 3 June 2018. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-007-DSDMIP | 19 July 2018 | The agreement executed by the Mayor of the City of Townsville with Imperium3 and witnessed by Premier Annastacia Palaszcuk on or about 3 June 2018. | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-006-DLGRMA | 19 July 2018 | Time period / date range for the request: 12 December 2017 to 19 July 2018 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-005-DSDMIP | 12 July 2018 | Time period / date range for the request: 1 January 2008 to 31 December 2017 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTI1819-004-DSDMIP | 9 July 2018 | Responses to correspondence sent by the Director-General, Department of State Development, Manufacturing, Infrastructure and Planning inviting industry stakeholders to provide feedback about the department. Time period / date range for the request: 1 March 2018 to 9 July 2018 | Office of the Leader of the Opposition | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1819-003-DLGRMA | 6 July 2018 | The engineering report provided to Douglas Shire Council for the Sugar Wharf (current version only) | Name withheld1 | Application withdrawn |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-058-DLGRMA | 28 June 2018 | Documents concerning a complaint made against the applicant. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-064-DSDMIP | 25 June 2018 | Documents relating to the Ipswich City Council Temporary Local Planning Instrument No. 1 of 2018 (Waste Activity Regulation). The application excludes documents subject to legal professional privilege. | Bio-Recycle Australia Pty Ltd | Application finalised Documents for RTIP1718-064-DSDMIP: |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-063-MSDMIP | 11 June 2018 | Time period / date range for the request: 1 May 2018 to 8 June 2018 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-062-DSDMIP | 11 June 2018 | Time period / date range for the request: 1 May 2018 to 8 June 2018 | Name withheld1 | Application finalised5 |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-060-MSDMIP | 7 June 2018 | All correspondence between the State and the Moreton Bay Regional Council (MBRC) regarding the State's review and the current position of the MBRC Planning Scheme. This includes, but is not limited to: Time period / date range for the request: 6 October 2017 to 6 June 2018 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-061-DSDMIP | 7 June 2018 | All correspondence between the State and the Moreton Bay Regional Council (MBRC) regarding the State's review and the current position of the MBRC Planning Scheme. This includes, but is not limited to: Time period / date range for the request: 6 October 2017 to 6 June 2018 | Trask Development Corporation No. 14 Pty Ltd | Application finalised Documents for RTIP1718-061-DSDMIP: |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-059-DSDMIP | 6 June 2018 | All written communication between the developer Stockland, their consultants Cardno, SLR Consultants, the Sunshine Coast Regional Council, WMAwater and the Queensland Government regarding: Time period / date range for the request: 1 June 2017 to 31 January 2018 | Twin Waters West and Surrounds Inc. | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-054-DLGRMA | 30 May 2018 | The last five briefing papers to the Minister about Eagle Farm racecourse. Time period / date range for the request: 12 December 2017 to 30 May 2018 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-058-DSDMIP | 24 May 2018 | Advice provided by Queensland Investment Corporation (QIC) to the former Department of Infrastructure, Local Government and Planning in relation to Cross River Rail. Time period / date range for the request: 1 January 2015 to 24 May 2018 | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-056-DSDMIP | 16 May 2018 | The following documents regarding Gympie Regional Council’s application for funding for the Mary Valley Rattler revitalisation project under the Building our Regions (BoR) program: Unsuccessful letter sent to Gympie Regional Council | News Corp Australia | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-057-DSDMIP | 16 May 2018 | Time period / date range for the request: 1 January 2018 to 18 April 2018 | REMONDIS Australia | Application finalised |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-052-DLGRMA | 16 May 2018 | The following documents regarding Gympie Regional Council's allocation of funding for the Mary Valley Rattler revitalisation project under the Works for Queensland program: | News Corp Australia | Application finalised Documents for RTI1718-052-DLGRMA |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-055-DSDMIP | 9 May 2018 | Time period / date range for the request: 1 June 2013 to 31 December 2015 | Glencore Coal Queensland Pty Limited | Application finalised <<Publish Documents for RTIP1718-055-DSDMIP here>> |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-050-DLGRMA | 4 May 2018 | All complaints about corruption at Ipswich City Council received by former Minister Trad. Time period / date range for the request: 1 January 2015 to 31 December 2017 | Office of the Leader of the Opposition | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-054-MSDMIP | 18 April 2018 | Time period / date range for the request: 1 January 2018 to 16 May 2018 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-053-DSDMIP | 18 April 2018 | Name withheld2 | Application finalised | |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-052-MSDMIP | 16 April 2018 | All emails and attachments sent by the Minister and/or staff from private email accounts to their office in accordance with the decision of Cabinet on 19 March 2018 banning the use of private email accounts and giving Ministers and staff 20 days to forward copies of all/any private emails to their office for cataloguing. Time period / date range for the request: 19 March 2018 to 16 April 2018 | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-046-DLGRMA | 16 April 2018 | All emails and attachments sent by the Minister and/ or staff from private email accounts to their office in accordance with the decision of Cabinet on 19 March 2018 banning the use of private email accounts and giving Ministers and staff 20 days to forward copies of all/ any private emails to their office for cataloguing. Time period / date range for the request: 19 March 2018 to 16 April 2018 | Name withheld1 | Application finalised1 |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-051-MSDMIP | 20 March 2018 | All correspondence and referral agency responses received from or sent to name withheld, Isaac Regional Council or Brazier Motti Town Planners regarding the properties situated at Lot 1 on CP DK150 (Whitsunday Regional Council), Lot 8 on CP DK136 (Isaac Regional Council) | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-050-DSDMIP | 19 March 2018 | Time period / date range for the request: 1 July 2011 to 31 July 2015 | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-049-DSDMIP | 8 March 2018 | All documents concerning the development application and the assessment by the assessment manager under the Planning Act 2016 for the construction of the Eastern Division Channel. The Channel is an integrated component of the Stage 2A Category 3 Levy and diversion channel operational works in Roma which has not commenced. The Maranoa Regional Council (MRC) is the constructor of the operational works. | Name withheld2 | Application finalised Documents for RTIP1718-049-DSDMIP: |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-048-DSDMIP | 8 March 2018 | All documents concerning the decision notice under the Sustainable Planning Act 2009 (and the related Vegetation Management Act 1999) to approve clearance of regulated native vegetation with the construction of the category 3 levy as a component of the Stage 2A category 3 levy and channel operational works in Roma. The Maranoa Regional Council (MRC) is the constructor of the operational works. Time period / date range for the request: 1 January 2016 to 8 March 2018 | Name withheld2 | Application finalised |
Former Minister for State Development, Manufacturing, Infrastructure and Planning | RTIP1718-046-MSDMIP | 6 March 2018 | All documents concerning City of Gold Coast Temporary Local Planning Instrument No. 5 (Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5). Time period / date range for the request: 12 December 2017 to 5 March 2018. | Walker Robina Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-047-DSDMIP | 6 March 2018 | All documents in relation to City of Gold Coast Temporary Local Planning Instrument No. 5 (Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5). Time period / date range for the request: 12 December 2017 to 5 March 2018 | Walker Robina Pty Ltd | Application finalised Documents for RTIP1718-047-DSDMIP |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-045-DSDMIP | 6 March 2018 | Any of the following documents relating to the environmental authority (EA) amendment application or the EA decision in relation to the New Acland Coal Mine: The application excludes: Time period / date range for the request: 3 January 2018 to 6 March 2018 | New Acland Coal Pty Ltd | Application finalised |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-044-DSDMIP | 20 February 2018 | The building records for the approval and certification of the multi-unit residential complex located at F block - Duhig - BUP - 106965, Cathedral Place, 41 Gotha Street, Fortitude Valley in the State of Queensland. Time period / date range for the request: 1 January 1998 to 31 December 1999. | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-042-DLGRMA | 15 February 2018 | All documents to and from the minister with respect to the monitoring and enforcing powers contained in Chapter 5 Part 1 of the Local Government Act 2009 regarding Logan City Council. Time period / date range for the request: 12 December 2017 to 15 February 2018 | Name withheld1 | Application finalised1 |
Former Department of Local Government, Racing and Multicultural Affairs | RTI1718-043-DLGRMA | 13 February 2018 | The thirty (30) most recent ministerial briefing notes and attachments for the period prior to and including 13 February 2018, provided to the Minister, that are not related to: | Name withheld1 | Application withdrawn |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-040-DSDMIP | 6 February 2018 | All documents from the Minister to City of Gold Coast in relation to Temporary Local Planning Instrument No. 5 (Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5). Time period / date range for the request: 12 December 2017 to 5 February 2018. | Name withheld1 | Application finalised1 |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-039-DSDMIP | 1 February 2018 | All documents regarding the South East Queensland Regional Plan and environmental auditing/planning documents that relate to numerous lots at East Coomera. | Zone Planning Group Pty Ltd | Application finalised Documents for RTIP1718-039-DSDMIP: |
Former Department of State Development, Manufacturing, Infrastructure and Planning | RTIP1718-038-DSDMIP | 30 January 2018 | The contract for tender for the department’s Health and Wellbeing Program 2016-17 (DSD399516) awarded to Ford Health from 8 June 2016. | Name withheld1 | Application withdrawn |
Last updated: 11 Jun 2025