Appendices
- Appendix 1.1 - Final terms of reference May 2009 (
438 KB)
- Appendix 1.2 - Cross reference with terms of reference (
23 KB)
- Appendix 1.3 - Applicable legislation and interpretation (
1.6 MB)
- Appendix 1.4 - QCLING project EIS study team (
37 KB)
- Appendix 1.5 - Proponent commitments (
112 KB)
- Appendix 1.6 - Projects considered in the assessment of cumulative impacts (
3.0 MB)
- Appendix 3.1 - Gas field soils study (
18.6 MB)
- Appendix 3.2 - Gas field terrestrial and freshwater flora and faunaassessment (
30.3 MB)
- Appendix 3.3 - Gas field surface water report (
15.5 MB)
- Appendix 3.4 - Gas field groundwater report (
21.8 MB)
- Appendix 3.5 - Gas field and pipeline air quality impact assessment (
3.5 MB)
- Appendix 3.6 - Gas field and pipeline noise impact assesment (
1.1 MB)
- Appendix 3.7 - Gas field transport assessment (
6.7 MB)
- Appendix 3.8 - Gas field landscape and visual assessment (
11.5 MB)
- Appendix 3.9 - Gas field preliminary hazard analysis (
410 KB)
- Appendix 3.10 - Gas field dangerous goods assessment (
3.9 MB)
- Appendix 4.1 - Pipeline soil and water assessment (
10.5 MB)
- Appendix 4.2 - Pipeline terrestrial and freshwater flora and fauna assessment (
33.0 MB)
- Appendix 4.3 - Pipeline noise vibration impact assessment (
462 KB)
- Appendix 4.4 - Pipeline transport assessment (
14.7 MB)
- Appendix 4.5 - Pipeline landscape and visual assessment (
9.8 MB)
- Appendix 5.1 - LNG facility geology and soils assessment (
1.9 MB)
- Appendix 5.2 - LNG facility acid sulfate soils investigation (
20.8 MB)
- Appendix 5.3 - LNG facility infrastructure audit (
2.5 MB)
- Appendix 5.4 - LNG facility phase i and ii site assessment (
2.1 MB)
- Appendix 5.5 - LNG facility flora report (
10.2 MB)
- Appendix 5.6 - LNG facility reptiles and amphibians survey (
350 KB)
- Appendix 5.7 - LNG facility targeted bird survey (
8.5 MB)
- Appendix 5.8 - LNG facility supplementary targeted bird survey (
19.1 MB)
- Appendix 5.9 - LNG facility marine water quality assessment (
19.0 MB)
- Appendix 5.10 - LNG facility coastal process and modelling report (
1.4 MB)
- Appendix 5.11 - LNG facility hydronamic assessment (
1.0 MB)
- Appendix 5.12 - LNG facility coastal legislation and policy (
14.7 MB)
- Appendix 5.14 - LNG facility noise and vibration impact assessment (
7.3 MB)
- Appendix 5.15 - LNG facility traffic and transport impact assessment (
6.2 MB)
- Appendix 5.16 - LNG facility microsimulation assessment (
1.5 MB)
- Appendix 5.17 - LNG facility gladstone intersection upgrade (
9.8 MB)
- Appendix 5.18 - LNG facility landscape visual assessment (
37.9 MB)
- Appendix 8.1 - Social baseline data (
2.5 MB)
- Appendix 8.2 - Summary of UMR community attitudes survey (
41 KB)
- Appendix 8.3 - Social infrastructure baseline assessment report (
820 KB)
- Appendix 8.4 - Non-indigenous cultural heritage baseline (
2.6 MB)
Last updated: 25 Jul 2024