Project change application 7 – Design refinements and condition changes 2020

DateActivity
16 July 2020 Coordinator-General’s report on project change (PDF icon2.6 MB) released, approving the change
4 June 2020 to 25 June 2020

Public consultation of project change application.

Volume 1 – Request for project change 7 application (PDF icon851 KB)

Volume 2 – Cross River Rail Design Drawings:

Drawing index and locality plans

General arrangement drawings:

General construction site plans:

Long section drawings (PDF icon3.3 MB)

Property impact drawings:

Station drawings (PDF icon9.1 MB)

Tunnel and portal drawings (PDF icon23 MB)

Volume 3 – Technical Reports (PDF icon1.4 MB)

Response to pre-lodgement information request (PDF icon4.7 MB)

Construction Environmental Management Plan enabling and advanced works (PDF icon7.9 MB)

21 May 2020

Proponent’s change application submitted.