Project's draft environmental impact statement documents
Additional Information to the Draft EIS - Chapters
- Part 1 – Chapters 1-4 (
21.8 MB) - Executive summary
- Table of contents
- Chapter 01 - Introduction
- Chapter 02 - Consultation
- Chapter 03 – Legislation, regulatory frameworks and project approvals
- Chapter 04 - Land
- Part 2 – Chapters 5-15 (
27.3 MB) - Chapter 05 – Fitzroy River turtle and white-throated snapping turtle
- Chapter 06 – Terrestrial fauna
- Chapter 07 - Surface water resources
- Chapter 08 - Water quality
- Chapter 09 - Noise and vibration
- Chapter 10 - Transport
- Chapter 11 – Consequential impacts
- Chapter 12 - Environmental management plan
- Chapter 13 – Project commitments
- Chapter 14 - Conclusions
- Chapter 15 - References
Additional Information to the Draft EIS - Appendices
- Appendix A – EIS submission Analysis Register (
653 KB) - Appendix B – Consultation material (
7.4 MB) - Appendix C - Connectivity (
761 KB) - Appendix D – Revised Project commitments (
517 KB) - Appendix E – Fitzroy River turtle and White-throated Snapping turtle species management program (
24.9 MB) - Appendix F – Revised draft environmental management plan (
948 KB) - Appendix G – Offset proposal for the Fitzroy River turtle and White-throated Snapping turtle (
3.5 MB) - Appendix H – Daily flow duration curves (
8.9 MB) - Appendix I – Sensitivity analysis (wewt and dry years) daily flow duration curves (
540 KB)
Draft EIS - Volume 1 Chapters
- Executive summary (
4.0 MB) - Table of contents (
546 KB) - Chapter 01 - Introduction (
1.3 MB) - Chapter 02 - Project description (
19.3 MB) - Chapter 03 - Legislation and project approvals (
856 KB) - Chapter 04 - Climate, natural hazards and climate change (
591 KB) - Chapter 05 - Land (
34.1 MB) - Chapter 06 - Flora (
27.8 MB) - Chapter 07 - Aquatic ecology (
21.4 MB) - Chapter 08 - Terrestrial fauna (
30.3 MB) - Chapter 09 - Surface water resources (
13.5 MB) - Chapter 10 - Groundwater resources (
2.1 MB) - Chapter 11 - Water quality (
7.5 MB) - Chapter 12 - Air quality (
3.5 MB) - Chapter 13 - Greenhouses gas emissions (
370 KB) - Chapter 14 - Noise and vibration (
3.0 MB) - Chapter 15 - Waste (
320 KB) - Chapter 16 - Transport (
4.6 MB) - Chapter 17 - Cultural heritage (
7.8 MB) - Chapter 18 - Social (
2.1 MB) - Chapter 19 - Economics (
1.7 MB) - Chapter 20 - Hazard and risk (
1.4 MB) - Chapter 21 - Cumulative impacts (
4.5 MB) - Chapter 22 - Offsets (
3.2 MB) - Chapter 23 - Environmental management plan (
1.1 MB) - Chapter 24 - Conclusions and recommendations (
229 KB) - Chapter 25 - References (
620 KB)
Draft EIS - Volume 2 Chapters
- Executive summary (
5.5 MB) - Table of contents (
410 KB) - Chapter 01 - Description of the action (
1.2 MB) - Chapter 02 - Project description (
19.2 MB) - Chapter 03 - Planning and approvals (
466 KB) - Chapter 04 - Consultation (
574 KB) - Chapter 05 - Alternatives to the Project (
265 KB) - Chapter 06 - Methodology (
13.6 MB) - Chapter 07 - Existing environment (
25.4 MB) - Chapter 08 - General impacts (
1.6 MB) - Chapter 09 - World Heritage properties and National Heritage places (
3.0 MB) - Chapter 10 - Threatened species and ecological communities (
9.0 MB) - Chapter 11 - Migratory and marine species (
608 KB) - Chapter 12 - Cumulative and consequential impacts (
1.9 MB) - Chapter 13 - Environmental Management System (
560 KB) - Chapter 14 - Offsets (
3.0 MB) - Chapter 15 - Conclusion (
253 KB) - Chapter 16 - Information sources and reference list (
459 KB)
Draft EIS - Appendices
- Appendix A - Final terms of reference (
1.1 MB) - Appendix B - Terms of reference cross-reference (
1.1 MB) - Appendix C - Glossary and abbreviations (
395 KB) - Appendix D - Study team (
264 KB) - Appendix E - Proponents' environmental policies (
478 KB) - Appendix F - Consultation report (
8.8 MB) - Appendix G - Land - detailed mapping:
- Eden Bann Weir (
64.8 MB) - Rookwood Weir (
55.6 MB)
- Eden Bann Weir (
- Appendix H - Assessment of potential implications on native vegetation and terrestrial ecosystems (Nangura 2007) (
1.4 MB) - Appendix 1 - Vascular plant species recorded from the Lower Dawson River study area (
120 KB) - Appendix 2 - Report photo plates (
3.6 MB) - Appendix 3 - Biocondition review - Riparian Offset Zones on Upper Bank (
253 KB) - Appendix 3a - Riparian offset zone photos (
7.8 MB) - Attachment 1 - Vegetation maps (
279.3 MB) - Attachment 1 - Eden Bann Impoundment vegetation maps (
63.6 MB) - Attachment 1 - Rookwood Impoundment vegetation maps (
139.7 MB) - Attachment 1 - Field site vegetation maps (
1.4 MB) - Attachment 1 - Offset location maps (
13.6 MB) - Attachment 2 - Site photo gallery (
170 KB)
- Appendix 1 - Vascular plant species recorded from the Lower Dawson River study area (
- Appendix I - Flora - detailed mapping:
- Eden Bann Weir (FSL 18.2 m) (
6.1 MB) - Eden Bann Weir (FSL 20.2 m) (
6.2 MB) - Rookwood Weir (FSL 45.5 m) (
6.5 MB) - Rookwood Weir (FSL 49.0 m) (
6.8 MB)
- Eden Bann Weir (FSL 18.2 m) (
- Appendix J - Eden Bann Weir baseline aquatic ecology report (
9.2 MB) - Appendix K - Rookwood Weir baseline aquatic ecology report (
9.6 MB) - Appendix L - Fitzroy River turtle (Rheodytes leukops) technical report (
31.6 MB) - Appendix M - Fitzroy River turtle (Rheodytes leukops) species management program (
21.6 MB) - Appendix N - Eden Bann Weir baseline terrestrial fauna report (
16.1 MB) - Appendix O - Rookwood Weir baseline terrestrial fauna report (
16.0 MB) - Appendix P - Surface water resources supporting material:
- Part 1 - Regulatory framework and yield modelling (
3.6 MB) - Part 2 - Existing environment and potential impacts on stream flow patterns (
1.5 MB) - Part 3 - IQQM statistical modelling comparison, hydrologic investigations and modelling (
4.0 MB) - Part 4 - Hydraulic modelling and references (
4.0 MB) - Appendix A - MDS plots (
1.3 MB) - Appendix B - MDS plots (EB1 vs RW2+EB3; theoretical yield) (
899 KB) - Appendix C - Stream flow hydrology (
2.7 MB) - Appendix D - Flow duration curves (
1.6 MB) - Appendix E - Eden Bann Weir existing flood extents:
- E1 - 1 in 2 year AEP (
46.5 MB) - E2 - 1 in 5 year AEP (
46.7 MB) - E3 - 1 in 10 year AEP (
46.5 MB) - E4 - 1 in 20 year AEP (
45.9 MB) - E5 - 1 in 50 year AEP (
45.1 MB) - E6 - 1 in 100 year AEP (
44.6 MB)
- E1 - 1 in 2 year AEP (
- Appendix E - Eden Bann Weir design flood extents:
- E7 - 1 in 2 year AEP (
46.5 MB) - E8 - 1 in 5 year AEP (
46.7 MB) - E9 - 1 in 10 year AEP (
46.4 MB) - E10 - 1 in 20 year AEP (
45.9 MB) - E11 - 1 in 50 year AEP (
45.3 MB) - E12 - 1 in 100 year AEP (
44.6 MB)
- E7 - 1 in 2 year AEP (
- Appendix F - Rookwood Weir existing flood extents:
- F1 - 1 in 2 year AEP (
46.5 MB) - F2 - 1 in 5 year AEP (
46.7 MB) - F3 - 1 in 10 year AEP (
46.4 MB) - F4 - 1 in 20 year AEP (
45.9 MB) - F5 - 1 in 50 year AEP (
45.0 MB) - F6 - 1 in 100 year AEP (
44.4 MB)
- F1 - 1 in 2 year AEP (
- Appendix F - Rookwood Weir design flood extents:
- F7 - 1 in 2 year AEP (
46.5 MB) - F8 - 1 in 5 year AEP (
46.7 MB) - F9 - 1 in 10 year AEP (
46.5 MB) - F10 - 1 in 20 year AEP (
45.9 MB) - F11 - 1 in 50 year AEP (
45.1 MB) - F12 - 1 in 100 year AEP (
44.6 MB)
- F7 - 1 in 2 year AEP (
- Part 1 - Regulatory framework and yield modelling (
- Appendix Q - Traffic and transport supporting material:
- Appendix R - Social impact assessment report (
4.9 MB) - Appendix S - Economic Assessment report (confidential) (
120 KB) - Appendix T - Counter-terrorism and critical infrastructure protection report (confidential) (
114 KB) - Appendix U - EPBC Protected Matters Search Tool Results (
713 KB) - Appendix V - IQQM yield assessment (confidential) (
114 KB) - Appendix W - Project commitments (
367 KB) - Appendix X - Fish passage technical report (
10.0 MB) - Appendix Y - Consolidated mitigation measures under EPBC Act (
378 KB)
Last updated: 16 Mar 2023