Six Mile Creek Dam Safety Upgrade project’s IAR documents
If you have difficulty downloading documents, please email cpdinfo@coordinatorgeneral.qld.gov.au
Supplementary Report to the IAR
Supplementary report to the IAR ( 32.6 MB)
IAR – Chapters
- Glossary (
3 MB)
- Executive Summary (
2.6 MB)
- Chapter 1 – Introduction (
6.7 MB)
- Chapter 2 – Project Description (
17.95 MB)
- Chapter 3 – Regulatory Approvals and Planning (
10.5 MB)
- Chapter 4 – Hazard and Risk (
2.8 MB)
- Chapter 5 – Matters of National Environmental Significance (
13.7 MB)
- Chapter 6 – Water Resources (
20.2 MB)
- Chapter 7 – Aquatic Ecology (
10.1 MB)
- Chapter 8 – Terrestrial Ecology (
20.5 MB)
- Chapter 9 – Traffic and Transport (
7 MB)
- Chapter 10 – Air Quality (
4.4 MB)
- Chapter 11 – Noise and Vibration (
4.4 MB)
- Chapter 12 – Social (
9.1 MB)
- Chapter 13 – Cultural Heritage (
5.2 MB)
- Chapter 14 – References (
2.7 MB)
IAR– Appendices
- Appendix A – Hydrology Graphs and Flooding Maps (
21.9 MB)
- Appendix B – Draft Environmental Management Plan (
3 MB)
- Appendix C – Lake Macdonald Water Lowering Adaptive Management Plan (
3.3 MB)
- Appendix D – Concept Design (
10.4 MB)
- Appendix E – Species Management Plans (
12.4 MB)
- Appendix F – Groundwater Impact Assessment (
9.8 MB)
- Appendix G – Aquatic Ecology and Water Quality Impact Assessment (
12.7 MB)
- Appendix H – Preliminary Acid Sulfate Soil Report (
11.3 MB)
- Appendix I – Terrestrial Ecology Field Survey Report (
12.9 MB)
- Appendix J – Air Quality Impact Assessment (
6.9 MB)
- Appendix K – Noise and Vibration Assessment (
8.5 MB)
- Appendix L – Cultural Heritage (Aboriginal and Historical) (
14.5 MB)
- Appendix M – Preliminary Approvals Application (
3.4 MB)
- Appendix N – Consultation Report (
4.5 MB)
- Appendix O – Fish Passage Assessment (
4.5 MB)
Last updated: 19 Jun 2023