New Acland Coal Stage 3 project’s Environmental Impact Assessment documents
Additional information to the EIS (August 2014) – Chapters
- Table of Contents (
200 KB)
- Chapter 01 – Introduction (
8.4 MB)
- Chapter 02 – AEIS Structure (
282 KB)
- Chapter 03 – Revised Project Amendments (
3.3 MB)
- Chapter 04 – Project Approvals (
344 KB)
- Chapter 5.1 - Key Issues requiring further clarification (
56 MB)
- Chapter 5.2 - Advisory Agency Responses (
67 MB)
- Chapter 5.3 - Other Responses (
6.7 MB)
- Chapter 06 – Errata (
9.5 MB)
- Chapter 07 – References (
292 KB)
- Abbreviations (
231 KB)
Additional information to the EIS (August 2014) – Appendices
- Appendix A – Revised Regulatory Approvals Plans (
25 MB)
- Appendix A1– Submission Analysis Register (
2.5 MB)
- Appendix B – Koala Management Plan Acland Mine (
46 MB)
- Appendix C – Revised Environmental Management Plan (
48 MB)
- Appendix D – Commitments Register (
1.1 MB)
- Appendix E– Social Impact Management Plan (
26 MB)
- Appendix F – Update Groundwater Modelling – Technical Report (
44.9 MB)
- Appendix G – Additional Landholder Bore Survey (
79 MB)
- Appendix H – Groundwater Monitoring and Impact Management Plan (
30 MB)
- Appendix I – Acland Management Plan (
64.9 MB)
- Appendix J – Intersection Counts (
206 KB)
- Appendix K– SIDRA summary (
3.1 MB)
- Appendix L – Threatened Species Translocational Plan (
32 MB)
- Appendix M – Revised Biodiversity Offset Strategy (
15 MB)
- Appendix N – IESC Submission Response (
47.7 MB)
- Appendix O – Tank Water Quality Sampling Results (
106 KB)
EIS (January 2014) - Chapters
Volume 1
- Executive Summary (
4.8 MB)
- Table of Contents (
1.3 MB)
- Chapter 01 – Introduction (
6.6 MB)
- Chapter 02 – Project Justification and Sustainability (
4.7 MB)
- Chapter 03 – Project Description (
26.6 MB)
- Chapter 04 – Land Resources (
12.7 MB)
- Chapter 05 – Surface Water Resources (
61.1 MB)
- Chapter 06 – Groundwater Resources (
13.4 MB)
- Chapter 07 – Terrestrial Resources (
12.6 MB)
Volume 2
- Chapter 08 – Aquatic Ecology (
3.9 MB)
- Chapter 09 – Air quality (
7.4 MB)
- Chapter 10 – Greenhouse Gas Emissions (
1.3 MB)
- Chapter 11 – Noise and Vibration (
14.5 MB)
- Chapter 12 – Cultural Heritage (
2.2 MB)
- Chapter 13 – Traffic and Transport (
4.4 MB)
- Chapter 14 – Waste Management (
1.3 MB)
- Chapter 15 – Visual Amenity (
10.8 MB)
- Chapter 16 – Social Environment (
2.2 MB)
- Chapter 17 – Economics (
3.4 MB)
- Chapter 18 – Health Safety and Risk (
1.3 MB)
- Chapter 19 – Community Consultation (
1.6 MB)
- Chapter 20 – Cumulative Impacts (
1.7 MB)
- Chapter 21 - Environmental Management Plan (
1.3 MB)
- Chapter 22 - Conclusions and Recommendations (
1.3 MB)
- Chapter 23 - References (
1.3 MB)
- Glossary and Abbreviations (
95 KB)
EIS (January 2014) - Appendices
Volume 3
- Appendix A - Corporate Information (
6.7 MB)
- Appendix B - Study Team (
2.1 MB)
- Appendix C - Project Regulatory Approval Plan (
4.2 MB)
- Appendix D - Terms of Reference (
2.5 MB)
- Appendix E - Terms of Reference Cross Reference Table (
2.6 MB)
- Appendix F - Project Key Policies and Guidelines (
2.1 MB)
- Appendix G - Supporting Technical Reports and Data
- G.1 Land Resources (
22.7 MB)
- G.2 Geochemistry (
8.9 MB)
- G.3 Surface Water (
2.1 MB)
- G.4 Groundwater
- G4.1 Aquifer Testing Report (
3.6 MB)
- G4.2 Landholder Bore Survey Results (
38.1 MB)
- G4.3 WSA Water Quality Lab Reports (
3.1 MB)
- G4.4 Stage 3 Groundwater Quality Lab Reports (
2.1 MB)
- G4.5 Groundwater Numerical Modelling Report (
22.8 MB)
- G4.1 Aquifer Testing Report (
- G.1 Land Resources (
Volume 4
- Appendix G - Supporting Technical Reports and Data
- G.5 Terrestrial Ecology (
12.2 MB)
- G.6 Air Quality (
5.5 MB)
- G.7 Noise and Vibration (
2.8 MB)
- G.8 Traffic (
32.4 MB)
- G.9 Economics (
2.1 MB)
- G.10 Hazard and Risk (
2.3 MB)
- G.5 Terrestrial Ecology (
- Appendix H - EPBC Act Assessment
- H.1 MNES Report (
59.9 MB)
- H.2 IESC Submission (
49.3 MB)
- H.1 MNES Report (
- Appendix I - Biodiversity Offset Strategy (
6.3 MB)
Volume 5
- Appendix J - Environmental Management Framework
- J.1 In-Pit Tailing Storage Facility Management Plan (
2.5 MB)
- J.2 Final Land Management and Rehabilitation Plan (
8.5 MB)
- J.3 Topsoil Management Plan (
3.6 MB)
- J.4 Water Resources Management Plan (
3.8 MB)
- J.5 Groundwater Monitoring and Impact Management Plan (
3.3 MB)
- J.6 Conservation Zone Management Plan (
5.1 MB)
- J.7 Threaten Species Translational Plan (
3.2 MB)
- J.8 Bluegrass Offset Management Plan (
3.8 MB)
- J.9 Pest and Weed Management Plan (
2.8 MB)
- J.10 Air Quality Management Plan (
6.3 MB)
- J.11 Noise and Vibration Management Plan (
2.7 MB)
- J.12 Acland colliery Conservation Management Plan (
10.1 MB)
- J.13 Waste Management Plan (
1.8 MB)
- J.14 Social Impact Management Plan (
2 MB)
- J.15 Emergency Management Plan (
8.4 MB)
- J.16 Strategic and Corporate Risk Management Framework (
3 MB)
- J.17 Aviation Hazard Management Plan (
4.5 MB)
- J.18 Local Stakeholder Management Plan (
1.8 MB)
- J.19 Environmental Management Plan (
13.1 MB)
- J.1 In-Pit Tailing Storage Facility Management Plan (
- Appendix K - Consultation (
28.4 MB)
- Appendix L - Proponent Commitments (
4.6 MB)
Last updated: 16 Mar 2023