View information previously released through the Right to Information Act 2009 in the table below. You can filter the list for keywords using the search box above the table.
You can also view applications made under the Right to Information and Integrity (Openness and Transparency) Amendment Act 2012.
* Where documents are marked with asterisk, this document exceeds the recommended file size limit for publishing PDF documents. Please contact the department by email or telephone to receive the document in an alternative format free of charge.
2013 - 2018
RTI reference | Date of valid application | Description of information | Name of applicant / entity | Status |
---|---|---|---|---|
RTIP1718-058-DSDMIP | 24 May 2018 |
Advice provided by QIC to former DILGP in relation to Cross River Rail. Time period: 1 January 2015 to 24 May 2018 |
Office of the Leader of the Opposition | Application refused |
RTIP1718-056-DSDMIP | 16 May 2018 |
The following documents regarding Gympie Regional Council’s application for funding for the Mary Valley Rattler revitalisation project under the Building Our Regions (BoR) program:
|
Newscorp | Application finalised Documents for publication – RTIP1718-056 ( ![]() |
RTIP1718-054-MIN-DSDMIP | 16 May 2018 |
1) Notice given by the Minister to Ipswich City Council under Planning Act 2016 section 27(2) related to the proposed Temporary Local Planning Instrument TLPI 01/18 - Waste activity regulation Ipswich Planning Scheme. 2) Response received from Ipswich City Council to the Minister to Notice given by the Minister to Ipswich City Council in the item number 1 above. 3) Documents the Minister had regard to in deciding to exercise power under section 27 of the Planning Act 2016 to issue TLPI 01/18. Including ministerial correspondence number MBN18/759, and any planning assessment report and annexures. Time period: 1 January 2018 to 16 May 2018 |
Name withheld | Application withdrawn |
RTIP1718-057-DSDMIP | 18 April 2018 |
1) Notice given by Minister Cameron Dick to Ipswich City Council under Planning Act 2016 section 27(2) related to the proposed Temporary Local Planning Instrument TLPI 01/18 - Waste activity regulation Ipswich Planning Scheme. 2) Response received from Ipswich City Council to Minister Cameron Dick to Notice given by Minister Cameron Dick to Ipswich City Council in the item number 1 above. 3) Documents the Minister had regard to in deciding to exercise power under section 27 of the Planning Act 2016 to issue TLPI 01/18. Including ministerial correspondence number MBN18/759, and any planning assessment report and annexures. Time period: 1 January 2018 to 18 April 2018 |
Remondis Australia | Application withdrawn |
RTIP1718-053- DSDMIP | 18 April 2018 |
1. The submission made by Gympie Regional Council in response to the 2010 community consultation and review of the Draft Wide Bay Burnett Regional Plan and the Draft Wide Bay State Planning Regulatory Provisions 2010 (including all attachments except for the attachment that comprises a private submission relating to properties on Potter Street, Gympie) 2. Documents disclosing all information supplied by officers of Gympie Regional Council to the former Department of Infrastructure and Planning regarding 49 Claffey Road, Gympie (lot 7 RP152197) including, but not limited to, communications during the 2010 community consultation and review of the Draft Wide Bay Burnett Regional Plan and the Draft Wide Bay State Planning Regulatory Provisions 2010. |
Name withheld | Application Finalised. Please contact This email address is being protected from spambots. You need JavaScript enabled to view it.) to access the documents for release |
RTIP1718-052-MIN-DSDMIP | 16 April 2018 |
Copies of all emails and attachments sent by the minister and/or staff from private email accounts to their office in accordance with the decision of Cabinet on 19 March 2018 banning the use of private email accounts and giving Ministers and staff 20 days to forward copies of all/any private emails to their office for cataloguing. Time period: 19 March 2018 to 16 April 2018 |
Office of the Leader of the Opposition | Application refused |
RTIP1718-051-DSDMIP | 21 March 2018 |
All correspondence and referral agency responses received from or sent to Name withheld, Isaac Regional Council or Brazier Motti Town Planners regarding the properties situated at Lot1 on CP DK150 (Whitsunday Regional Council), Lot 8 on CP DK136 (Isaac Regional Council) and Lot 9 on CP DK136 (Isaac Regional Council). Time period: 17 September 2015 to 19 March 2018 |
Taylors Solicitors | Application withdrawn |
RTIP1718-050-DSDMIP | 19 March 2018 |
Any documents (including any letters, emails or file notes) in relation to the acquisition by Corbet Property Pty Ltd ACN 162344916 as trustee for the Alvin Corbet Family Trust from the Coordinator-General of 1944 Bruce Highway, Traveston (being Lot 520on SP263809). Any documents (including any letters, emails or file notes) in relation to any other sites Corbet Property Pty Ltd ACN 162 344 916was considering acquiring from the Coordinator-General. Any properties greater than 10 hectares which were available for Corbet Property Pty Ltd ACN 162 344 916 to purchase from the Coordinator-General prior to 24 July 2015. A copy of the Development Lease between Corbet Property Pty Ltd ACN 162 344 916 and the Coordinator-General, and any documents relating to it. Time period: 1 July 2011 to 31 July 2015 |
Name withheld | Application withdrawn |
RTIP1718-049-DSDMIP | 8 March 2018 |
All types of documents including memos, reports, assessment and recommendation documents, decision documents, emails and letters from 01 January 2017 to present (i.e. 8 March 2018). Documents being sought relate to all documents relevant to the development application and the assessment by the assessment manager under the Planning Act 2016 for the construction of the "Eastern Division Channel". The Channel is an integrated component of the Stage 2A Category 3 Levy and diversion channel operational works in Roma which has not commenced. The Maranoa Regional Council (MRC) is the constructor of the operational works. At the pre-lodgement meeting held in Toowoomba on 02 September 2015, the MRC were advised by DNRM that a licence under the Water Act 2000 to take and/or interfere with water was required for the "Diversion Channel". The proposed "Diversion Channel" was not a component of the development assessment for the category 3 levy which was approved by Ministerial Call-in decision under the Sustainable Planning Act 2009 as this was not required under those laws at the time. The 'Diversion Channel' is now an assessable development under The Planning Act 2016 and the Planning Regulations 2017, Schedule 10 (see also schedules 7 and 8 and The Water Act 2000) at:
The proposed "Diversion Channel" extends over areas mapped as category B area containing of concern regional ecosystems, especially Lot 342 WV219, but also Lot 96 M5398, Lot 343 R8614, Lot 41 R8614 and Lot 21 R8614. The attached Google Earth image dated 04 October 2016 shows activity on behalf of MRC - clearing regulated vegetation on Lot 342 WV219. Regulated vegetation standing on the other lots will be subject to clearance with the "Diversion Channel" operational work. |
Name withheld | Application finalised Documents for publication – RTIP1718-049 ( ![]() |
RTIP1718-048-DSDMIP | 8 March 2018 |
All types of documents including memos, reports, assessment and recommendation documents, decision documents, emails and letters from 01 January 2016 to present (08 March 2018). Documents being sought relate to the decision notice under the Sustainable Planning Act 2009 (and the related Vegetation Management Act 1999) to approve clearance of regulated native vegetation with the construction of the category 3 levy as a component of the Stage 2A category 3 levy and channel operational works in Roma. The Maranoa Regional Council (MRC) is the constructor of the operational works. Approvals to clear native vegetation were discussed at the pre-lodgement meeting held in Toowoomba on 02 September 2015 between representatives of DILGP / DNRM and MRC. An approval decision to clear regulated native vegetation for operational work under the Sustainable Planning Act 2009 including an assessment against the relevant tables in SDAP module 8 - native vegetation clearing was reportedly issued on 19 December 2016. The proposed category 3 levy component of the operational works extends over areas mapped as category B area containing of concern regional ecosystems, including Lot 22 RP863, Lot 2 SP110498, Lot 2 RP4380, Lot 1 RP4380, Lot RP8684 and Lot 1 WV1882. |
Name withheld | Application finalised Documents for publication – RTIP1718-048 ( ![]() |
RTIP1718-047- DSDMIP | 6 March 2018 |
All documents in relation to Temporary Local Planning Instrument No.5 Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5) including, but not limited to:
Date range: from the date the department was created to the present day. |
Walker Robina Pty Ltd | Currently being processed |
RTIP1718-046-MIN-DSDMIP | 6 March 2018 |
All documents in relation to Temporary Local Planning Instrument No.5 Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5) including, but not limited to:
Date range: from the date the department was created to the present day. |
Walker Robina Pty Ltd | Application finalised Documents for publication – RTIP1718-046 ( ![]() |
RTIP1718-045-DSDMIP | 6 March 2018 |
|
New Acland Coal Pty Ltd | Application finalised Documents for publication – RTIP1718-045 ( ![]() |
RTIP1718-044-DSDMIP | 20 February 2018 |
The building records for the approval and certification of the multi-unit residential complex located at F block - Duhig - BUP - 106965, Cathedral Place, 41 Gotha Street, Fortitude Valley in the State of Queensland. Date range: 1 January 1998 to 31 December 1999. |
Name withheld | Application refused |
RTIP1718-040-DSDMIP | 1 February 2018 |
A copy of all documentation from the Minister to Gold Coast City Council in relation to Temporary Local Planning Instrument No.5 (Minimum Land Above Designated Flood Level and Residential Risk Reduction) 2017 (TLPI No. 5). Date range: 12 December 2017 to 5 February 2018. |
Walker Group Holdings Pty Ltd | Application refused |
RTIP1718-039-DSDMIP | 1 February 2018 |
All documents regarding the SEQ Regional Plan and environmental auditing/planning documents that relate to numerous lots at East Coomera. |
Zone Planning | Application finalised |
RTIP1718-038-DSDMIP | 30 January 2018 |
Contract for tender for the department’s Health and Wellbeing Program 2016-17 (DSD399516) awarded to Ford Health from 8 June 2016. |
Name withheld | Application withdrawn |
RTIP1718-037-DSDMIP | 24 January 2018 |
The 30 most recent Ministerial Briefing Notes on different subjects provided to the Minister for the period prior to and including 23 January 2018. |
Seven Network | Application withdrawn |
RTIP1718-036-DSDMIP | 2 January 2018 |
Correspondence, emails and meeting notes between the department and Moreton Resources Limited about the proposed South Burnett Coal Project at Kingaroy (including mine, rail and port proposals). Date range: 1 October 2016 to 1 March 2017 |
Kingaroy Concerned Citizens Group | Application withdrawn |
RTIP1718-035-DSDMIP | 2 January 2018 |
All documents which have any mention of Oceania Contaminated Specialists & Associates Pty Ltd and W2E Pty Ltd. Date range: 1 January 2017 to 2 January 2018 |
Oceania Contaminated Specialists & Associates Pty Ltd | Application refused |
RTIP1718-034-DSDMIP | 2 January 2018 |
All documents relevant to the Temporary Local Planning Instrument 03/17 Civic Spaces and Iconic Vistas. Including any communication with the Brisbane City Local Council |
Brisbane Square Pty Ltd | Application finalised Documents for publication – RTIP1718-034 ( ![]() |
RTIP1718-033-DSDMIP | 17 January 2018 |
Meeting Minutes and Agenda from a meeting in April 2013 between the Office of the Coordinator General, Department of Main Roads & Boral regarding the Gold Coast Quarry EIS project. |
Elesanar Constructions Pty Ltd | Application finalised Documents for publication – RTIP1718-033 ( ![]() |
RTIP1718-032-DSDMIP | 15 December 2017 |
Rookwood Weir business case produced by Building Queensland. |
Office of the Leader of the Opposition | Application refused |
RTIP1718-031-DSDMIP | 15 December 2017 |
All documents containing strategic advice about the PPP model for the Cross River Rail Project Date range: 1 May 2017 to 15 December 2017 |
Office of the Leader of the Opposition | Application withdrawn |
RTIP1718-030-DSDMIP | 15 December 2017 |
Beerburrum to Nambour rail upgrade project business case produced by Building Queensland. |
Office of the Leader of the Opposition | Application refused |
RTIP1718-029-DSDMIP | 15 December 2017 |
Nullinga Dam business case produced by Building Queensland |
Office of the Leader of the Opposition | Application refused |
RTIP1718-028-DSDMIP | 3 January 2018 |
Documents related to whether the clearing of "category x" land can be regulated by local planning schemes or under the Planning Act 2016 (or now repealed Sustainable Planning Act 2009), particularly correspondence or submissions regarding that issue and any proposals to change the relevant law. Date range: 1 January 2015 to 1 December 2017 |
Cooper Grace Ward | Application withdrawn |
RTIP1718-027-DSDMIP | 11 December 2017 |
Documents related to official meetings of the ShapingSEQ Environment & Community Reference Group and the Industry Reference Group and a copy of the SEQ Regional Plan Community Attitudes Research 2016 prepared by TNS. |
Name withheld | Application finalised |
RTIP1718-026-DSDMIP | 4 December 2017 |
All documents relating to clearing activities or planning approvals involving Bluewater Airport, including certification by the Department of Natural Resources and Mines (DNRM) of a Property Map of Assessable Vegetation (PMAV) in November 2017. Date range: 1 January 2012 to 4 December 2017 |
Bluewater MFS Pty Ltd | Application finalised |
RTIP1718-025-DSDMIP | 27 November 2017 |
The Terms of Reference, Terms of Engagement and Scope of Works related to the government’s engagement of WMA Water Ltd to conduct an Independent Review. Date range: 1 June 2017 to 31 August 2017 |
Twin Waters West & Surrounds Inc | Application finalised Documents for publication – RTIP1718-025 ( ![]() |
RTIP1718-024-DSDMIP | 16 November 2017 |
Documents relevant to processing and deciding the assessment application for RPI17/004/Bengal Coal |
Landholder Services Pty Ltd | Currently being processed |
RTIP1718-023-DSDMIP | 14 December 2017 |
Final submission document lodged by the Sanctuary Cove Primary Thoroughfare Body Corporate (the Body Corporate) within the timeframe of May to July 2009 for the proposed amendments to the Sanctuary Cove Resort Act 1985 and the final approval document issued to the Body Corporate confirming gazettal of proposal and confirmation of new Proposed Use Plan for the Sanctuary Cove site. |
Sanctuary Cove Primary Thoroughfare Body Corporate | Application withdrawn |
RTIP1718-022-DSD | 23 November 2017 |
All documents from 1 July 2017 to 21 November 2017 related to the South Burnett Coal Project, Moreton Resources and MRV Tarong Basin Coal. |
Moreton Resources Limited | Application finalised Documents for publication – RTIP1718-022 ( ![]() |
RTIP1718-021-DSD | 23 November 2017 |
All documents from 1 March 2017 to 30 June 2017 related to the South Burnett Coal Project, Moreton Resources and MRV Tarong Basin Coal. |
Moreton Resources Limited | Application finalised Documents for publication – RTIP1718-021 ( ![]() |
RTIP1718-020-DSD | 21 November 2017 |
Cultural Heritage Management Plans for the Carmichael coal mine and rail project sites Date range: 1 January 2016 to 21 November 2017 |
Australia Conservation Foundation | Application withdrawn |
RTIP1718-019 | 17 November 2017 |
A copy of the Project Manager's Report dated on or around 11 September 2017 referred to in the Statement of Reasons for the Coordinator-General's decision not to discontinue the resumption or amend the Notices of Intention to Resume (NIRs) issued on 7 March 2017 to Aurizon Network Pty Ltd over lots in the Abbot Point and Galilee Basin State Development Areas. Date range: 1 September 2017 to 13 September 2017 |
King & Wood Mallesons | Application finalised |
RTIP1718-018-DSD | 20 November 2017 |
All executive briefings/meeting minutes and emails to or from the Director-General referring to: "not for media" "not to media" or "not for publication". Date range: 1 July 2017 to 20 November 2017 |
Seven Network | Application finalised Documents for publication – RTIP1718-018 ( ![]() |
RTIP1718-017 | 15 November 2017 |
All documents related to potential state government funding of the upgrade of the Elgin-Moray Road and the Moray-Carmichael Road to a sealed road. Date range: 1 January 2017 to 15 November 2017 |
Name withheld | Application refused |
RTIP1718-016 | 25 October 2017 |
All documents related to the South Burnett Coal Project, Moreton Resources and MRV Tarong Basin Coal. Date range: 1 January 2017 to 25 October 2017 |
Moreton Resources Limited | Application refused |
RTIP1718-015 | 21 September 2017 |
The Submission and any correspondence by the Cairns Regional Council regarding the Potential Cairns South State Development Area. Date range: 1 July 2017 to 1 August 2017 |
Name withheld | Application finalised Documents for publication – RTIP1718-015 ( ![]() |
RTIP1718-014 | 10 October 2017 |
A report called "Department of State Development Investigation into a Suitable Industrial Precinct in Cairns - Phase 2 Potential Impacts on Strategic Cropping Land and Sugar Industry (18 May 2017)". Date range: 1 January 2017 to 1 May 2017 |
Name withheld | Application refused |
RTIP1718-013 | 10 October 2017 |
A report called "Department of State Development - Investigation into a Suitable Industrial Precinct in Cairns - Phase 1 Demand Review and Identification of Preferred Site (18 May 2017)" and any documents used to prepare this report Date range: 1 January 2017 to 1 May 2017 |
Name withheld | Application refused |
RTIP1718-012 | 6 October 2017 |
All documents relating to Gamarard Pty Ltd / Aurukun BioFutures as an applicant to the Regional Jobs and Growth Fund and the lead up briefings from June 2017 to 6th October 2017. |
Gamarard Pty Ltd | Application withdrawn |
RTIP1718-008 | 31 August 2017 |
A copy of development application number MCU682/03 and all documents relating to the permissible change request made to the Minister for State Development on or about 22 September 2015 for the Development Approval. Date range: 1 January 2003 to 31 August 2017 |
Lipoma Pty Ltd | Application withdrawn |
RTIP1718-007 | 15 August 2017 |
All documents relating to expenses incurred by the department providing hospitality and entertainment with representatives of GVK and/or Adani and/or Mac Mines Austasia. Date range: 26 June 2014 – 14 August 2017 |
Name withheld | Application refused |
RTIP1718-005 | 12 September 2017 |
Decisions taken by the Queensland Government and their impacts on the state's forecast GST distribution revenue; and on-shore gas development and the impact on the Queensland Government forecast GST distribution revenue |
Brand Partners Commercial Lawyers | Application refused |
RTIP1718-004 | 7 August 2017 |
All (final) Ministerial Briefing Notes (MBN) related to Adani from 1 April 2017 to 4 August 2017 |
Energy and Resource Insights | Application refused |
RTIP1718-003 | 7 August 2017 |
All documents related to the decision of the Coordinator-General to state a new project declaration lapse date of 9 March 2018 for the China Stone Coal Project. Date range: 4 February 2017 - 5 July 2017 |
Energy and Resource Insights | Application finalised |
RTIP1718-002 | 12 July 2017 |
Final approved departmental or ministerial briefing notes relating to the ASF Consortium proposal for an Integrated Resort Development on The Spit, and any correspondence to the department and/or minister's office from the ASF Consortium relating to the proposal. Date range: 1 January 2016 - 30 June 2017 |
Name withheld | Application refused |
RTIP1718-001 | 17 July 2017 |
All documents created between 14 May and 14 July 2017, or if none the most recent before 14 May 2017 containing any calculation, or the results of such a calculation, of the value of the royalty deferment deal the Queensland government offered to Adani for its Carmichael coal mine; outlining the Queensland government process for application and assessment for a royalty deferment under the new framework; or outlining the Queensland government process for due diligence and decision making on proposals for financial assistance via the Northern Australia Infrastructure Facility. |
The Australia Institute | Application finalised |
RTIP1617-047 | 5 June 2017 |
Documents relating to projects awaiting approval in the last 12 months, including those produced in the last 12 months about projects awaiting approval, the extent of any delay in approval and the reasons for any such delays in approval. Date range: 1 June 2016 to 5 June 2017 |
ABC Brisbane | Application withdrawn |
RTIP1617-046 | 30 May 2017 | Copies of written submissions made by private individuals and local governments on the EIS for the following coal mines located in the Galilee Basin:
Date range: December 2010 to December 2012 |
Name withheld | Application withdrawn |
RTIP1617-045 | 16 May 2017 | Documents that are referred to in the Queen’s Wharf Casino Agreement 2016 (see page reference below):
|
Name withheld | Application refused |
RTIP1617-044 | 5 May 2017 | All documents and correspondence of any kind held by any unit of the Department of State Development which discuss or refer to royalties to be paid by Adani for coal extracted and sold from the proposed Carmichael coal mine, or by any company from the first mine to be built or to extract coal from the Galilee Basin from July 2016 to today (5/05/2017), including:
In your search please include all documents containing the words: ("Carmichael" or "Galilee" or "Adani") and ("royalty" or "royalties" or "holiday" or "rampup" or "ramp-up" or "ramp up" or "first mover advantage"). |
The Australia Institute | Documents not accessed by applicant. To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access. Processing charge: $1483.20 |
RTIP1617-043 MIN | 18 April 2017 | All emails (including attachments) received from and sent to a.lynham@uq.edu.au by any member of staff within the Office of Minister Lynham. | Name withheld | Application refused |
RTIP1617-042 | 30 May 2017 | The applicant is seeking access to documents that are non-personal in nature.
The following documents in relation to the Queen's Wharf Brisbane (QWB) project:
Date range: January 2012 to present |
Name withheld | Application refused |
RTIP1617-041 | 10 April 2017 |
|
Name withheld | Application refused |
RTIP1617-039 MIN | 13 February 2017 | Documents or correspondence mentioning the personal information of identified individuals. (This application was made to the Office of the Minister for State Development). | Name withheld | Application refused |
RTIP1617-038 | 14 February 2017 | Documents or correspondence mentioning the personal information of identified individuals. | Name withheld | Application withdrawn |
RTIP1617-037 | 6 February 2017 | The report done by KPMG regarding a Master Plan for The Spit. The consultation was done in January and I understand that the report was submitted by KPMG towards the end of January 2017.
Date range: 1 January 2017 to 3 February 2017 |
Name withheld | Application refused |
RTIP1617-036 | 16 January 2017 | All documents regarding:
|
Name withheld | Application withdrawn |
RTIP1617-035 | 25 January 2017 |
Date range: 01 January 2014 to 01 July 2016 |
Donnie Harris Law | Currently subject to an External |
RTIP1617-034 | 22 December 2016 | All documents regarding:
Date range: 1 January 2013 to 7 December 2016 |
Name withheld | Application withdrawn |
RTIP1617-033 | 22 December 2016 | The community impact statement in relation to the proposed Queen's Wharf Integrated Resort Development. | Name withheld | Application refused |
RTIP1617-032 | 12 December 2016 | All documents regarding:
Date range: 1 January 2013 to 7 December 2016 |
Name withheld | Application withdrawn |
RTIP1617-030 | 28 October 2016 | Documents relating to the consideration and declaration of Adani's combined mine, rail and associated water infrastructure as critical infrastructure. Specifically:
|
Greenpeace Australia Pacific | Application finalised Documents for publication – RTIP1617-030 ( ![]() |
RTIP1617-028 | 24 October 2016 | Survey questions and results regarding The Spit, Gold Coast that Gold Coast residents were asked in February or early March.
Date range: 1 February 2016 to 31 March 2016 |
Name withheld | Application refused |
RTIP1617-025 MIN | 18 October 2016 | All documents related to the declaration of the Adani Combined Project a critical infrastructure project pursuant to section 76E(1) of the State Development and Public Works Organisation Act 1971 on Friday, 7 October 2016 including all documents relating to the decision to make the declaration.
Date range: 1 January 2016 to 18 October 2016 |
Name withheld | Application withdrawn |
RTIP1617-024 | 18 October 2016 | All documents related to the declaration of the Adani Combined Project a critical infrastructure project pursuant to section 76E(1) of the State Development and Public Works Organisation Act 1971 on Friday 7 October 2016 including all documents relating to the decision to make the declaration.
Date range: 1 January 2016 to 18 October 2016 |
Name withheld | Application finalised Documents for release – RTIP1617-024 ( |
RTIP1617-023 | 18 October 2016 | The most recent document or documents that describes to the fullest extent the North Galilee Water Scheme Project. This being the Project declared a critical infrastructure project as a component of the Adani Combined Project pursuant to section 76E(1) of the State Development and Public Works Organisation Act 1971. | Name withheld | Application finalised Documents for release – RTIP1617-023 ( |
RTIP1617-020 | 5 October 2016 | The Applicant is seeking the following information:
Date range: 1 January 2014 to 1 July 2016 |
Name withheld | Application withdrawn |
RTIP1617-016 | 22 September 2016 | All communications between the department internally, between the department and Reedlodge Pty Ltd, and between the Department and Minister Lynham, in relation to Reedlodge Pty Ltd or solicitors acting on their behalf (Girgenti Lawyers) regarding Lot 20 on Crown Plan NR7137, Lot 231 on SP 129908, Lot 201 on SP 129905, Lot 79 on SP 136292, Lot 67 on SP 136294 and Lot 78 on SP 152626. | Mareeba Shire Council | Application finalised Documents for release – RTIP1617-016 ( |
RTIP1617-011 | 22 November 2016 | Documents regarding lot 23, SP 124797.
Date range: 1 January 2007 to 24 August 2016. |
Name withheld | Application withdrawn |
RTIP1617-007 | 5 August 2016 | Traveston Crossing Dam/Mary Valley Property Divestment Program:
|
Name withheld | Application refused |
RTIP1617-006 | 2 August 2016 | All documents relating to Australian Indigenous Resources Pty Ltd (AIR) and/or Aurukun Bauxite Development (ABD) as an unsuccessful proponent of the Aurukun Bauxite Project.
Date range: 1 November 2012 to 31 July 2016 |
Name withheld | Application refused |
RTIP1617-003 | 4 July 2016 |
|
Name withheld | Application withdrawn |
RTIP1516-076 | 14 July 2016 | Internal and external communications, reports or approvals between the Coordinator-General (CG) office and any other Government body or Government Contractor relating to:
This RTI Application excludes:
|
Name withheld | Application refused |
RTIP1516-075 | 21 June 2016 | All documents including any attachments or copies thereof created, produced, received or sent in the possession or in the control of CG relating to the resumption of part of the Land for the purposes of the Project, including:
Date range: 12 June 2009 to 21 June 2016. |
Name withheld | Application withdrawn |
RTIP1516-074 | 13 July 2016 | All internal and external communications and correspondence, drawings (technical in nature or otherwise), plans, memos, designs, reports or approvals between the CG office and any other Government body or Government Contractor relating to:
This RTI Application excludes:
Date range: 12 June 2009 up to and including 21 June 2016. |
Name withheld | Application refused |
RTIP1516-073 | 21 July 2016 | This RTI Application seeks provision of information and documentation as set out below but only as they may relate to Lot 1 on RP603319 and/or Lot 3 on RP605157. Internal and external communications and correspondence, reports or approvals between the CG office and any other Government body or Government Contractor relating to:
This RTI Application excludes:
|
Name withheld | Application withdrawn |
RTIP1516-072 | 13 July 2016 | This RTI Application seeks provision of information and documentation in the possession of or in the control of CG, regarding Feetham Street, Mineham Street or Racecourse Road in Cluden or Development Approval 2012/030. | Name withheld | Application refused |
RTIP1516-070 | 24 May 2016 | Copies of all written approvals, if any, by the Minister under section 9(4)(b)(i) of the Local Government Act 2009 giving approval to the Local Government of the City of Gold Coast to exercise its powers outside its local government area. | Name withheld | Application withdrawn |
RTIP1516-069 | 10 May 2016 | On 17 May 2007 (which declaration was gazetted 25 May 2007) the Coordinator-General declared the Linc Energy Underground Coal Gasification (UCG) project (MDL 309, near Chinchilla) incorporating demonstration plants of gas–to-liquids and gas turbine power generation a "significant project" for which an Environmental Impact Statement (EIS) was required under the State Development and Public Works Organisation Act 1971 (Qld). We request the following information:
The responses and submissions reviewed and considered by the Coordinator-General in finalising the Terms of Reference dated November 2007 for an Environmental Impact Statement (EIS) under Part 4 of the State Development and Public Works Organisation Act 1971 (Qld) including the response. |
Name withheld | Application withdrawn |
RTIP1516-067 | 26 April 2016 | Emails regarding Springborg, LNP and voting between 21 – 24 April 2016. | Name withheld | Application withdrawn |
RTIP1516-066 MIN | 26 April 2016 | Leader of the Opposition requesting any emails between staff in the Ministerial office (including with or from the Minister) that mention 'Springborg, LNP and voting' from 8:30pm on 21 April 2016 until 24 April 2016. Time period: 21 April 2016 to 24 April 2016. |
Name withheld | Application refused |
RTIP1516-065 | 21 April 2016 | Emails, briefing notes, memos or any other written correspondence that refer to or mention the Crime and Corruption Commission. | Name withheld | Application withdrawn |
RTIP1516-063 | 29 April 2016 | Internal memos, emails and letters to and from the Department of State Development and Boral regarding Country Road Quarries (Willa Pty Ltd trading as Country Road Quarries)and/or in relation to Peter David Watkins.
Date range: 1 December 1999 - 31 December 2000. |
Name withheld | Application refused |
RTIP1516-062 | 7 April 2016 | All documents and communications between Adani Mining Pty Ltd and its representative and the Department of State Development regarding the grant of mining leases 70505 and 70506 to Adani Mining Pty Ltd on 3 April 2016. All documents and communications between Department of State Development and the Department of Premier and Cabinet regarding the grant of mining leases 70505 and 70506 to Adani Mining Pty Ltd on 3 April 2016. 3 April 2016. | Name withheld | Application finalised |
RTIP1516-061 | 21 March 2016 | All correspondence received from Brisbane City Council (BCC), Logan City Council (LCC) & any other material received in relationship the approval or objection to this matter proceeding. (This matter is in relationship to our proposal for properties currently in BCC to be changed to LCC due to services etc.) Any documents that give information for the reasons why the proposal did not proceed and any documents in support of the proposal. Date range: 1 June 2015 to 21 March 2016 |
Name withheld | Application finalised Documents for release – RTIP1516-061 ( |
RTIP1516-060 MIN | 17 March 2016 | All documents, including emails (and attachments) and internal memos that refer to or mention the Member for Cairns or Rob Pyne. This should include incoming, outgoing and internal documents within the ministerial office. | Name withheld | Application withdrawn |
RTIP1516-059 MIN | 14 March 2016 | All communications, financial assessments, and asset registers between the Minister for Infrastructure, Local Government and Planning, the Department of Infrastructure, Local Government and Planning and its predecessors, the local government authorities of Noosa Shire Council and Sunshine Coast Council and other external parties relating to a proposed review of the boundary between the two council areas and any views on such a proposal. Date range: 1 January 2015 to 8 March 2016 |
Name withheld | Application withdrawn |
RTIP1516-058 | 14 March 2016 |
Date range: 1 October 2004 to 30 June 2005 |
P & E Law | Application refused |
RTIP1516-057 | 11 March 2016 | Documents relating to Wellcamp Airport development application. | Banki Haddock Fiora | Application finalised Documents for release – RTIP1516-057 ( ![]() |
RTIP1516-054 | 14 March 2016 | All communications, financial assessments, and asset registers between the Minister for Infrastructure, Local Government and Planning, the Department of Infrastructure, Local Government and Planning and its predecessors, the local government authorities of Noosa Shire Council and Sunshine Coast Council and other external parties relating to a proposed review of the boundary between the two council areas and any views on such a proposal. Excluding:
Date range: 1 January 2015 to 8 March 2016 |
Name withheld | Application finalised Documents for release – RTIP1516-054 ( ![]() |
RTIP1516-052 | 8 February 2016 | Toowoomba Regional Council Strategic Long Term Asset Management Plan as required under Section 74 and 104 of the Local Government Act 2009 and Section 57 and 168 of Local Government Regulations 2012 and Department of Infrastructure, Local Government and Planning Financial Management (Sustainability) Guideline 2013. | Name withheld | Application refused |
RTIP1516-051 | 25 January 2016 | Documents relating to economic and financial modelling and cost-benefit analysis related to the medium and long-term future of the NSI economy and community following the cessation of mining operations in 2019 and any consideration and/or decision made by the department or the Minister as a result of such modelling and/or analysis. Such documents should include any impact on:
Date range: 1 June 2014 to 25 January 2016 |
Australian Workers Union (AWU) | Application refused |
RTIP1516-050 | 15 January 2016 | Documents relating to proposed changes to the Sunshine Coast Council Local Planning Scheme 2014 with regards to all 'place of worship applications'. Date range: 1 October 2015 to 31 December 2015 |
Sunshine Coast Safe Communities | Application withdrawn |
RTIP1516-049 | 13 January 2016 | Independent consultant report from Lockyer Valley Regional Council. | Laidley Jewellers | Application withdrawn |
RTIP1516-048 | 5 January 2016 | All leases, rental agreements and or licence agreements between EDQ & Gateway Airport Parking relating to the area of land consisting of 15,500 square meters on the corner of Barcham Street & MacArthur Ave Hamilton which forms part of Lot 13 SP 214221. Date range: 1 July 2015 to 5 January 2016 |
Name withheld | Documents not accessed by applicant To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access. Processing charge: $194.60 |
RTIP1516-047 | 04 January 2016 | All documents related to the sale of a property by the Coordinator-General. Date range: 1 January 2012 to 28 February 2014 |
Name withheld | Application finalised Documents for publication – RTIP1516-047 ( ![]() |
RTIP1516-046 | 11 January 2016 | Any documents relating to 2012 BMT study into water quality at Caley Valley Wetland or its findings in the context of the proposed expansion of Abbot Point coal terminal. Any documents relating to proposed additional testing, information needs or remediation steps for the Caley valley Wetlands and adjacent coal stockpile. Date range: 1 January 2012 to 24 December 2015 (first and last drafts only) |
Name withheld | Application withdrawn |
RTIP1516-045 | 11 January 2016 | All documents relating to research proposed or being undertaken on dolphins at Abbot Point (Snubfin, Irawaddy and Indo-Pacific); All documents regarding these dolphins that is required in order to make informed assessments of;
Any documents relating to the need for additional data in the context of the Environmental Impact Assessment process (under the EPBC Act) at Abbot Point. Date range: 1 January 2013 to 24 December 2015. |
Name withheld | Application withdrawn |
RTIP1516-044 | 23 December 2015 | All documents between the Coordinator General or his office, and the Land Court of Queensland, regarding the process, timing and/or status of mining project objections hearings under the Mineral Resources Act 1989 and/or Environmental Protection Act 1994 from 1 July 2015 to 23 December 2015. | Name withheld | Application finalised Documents for publication – RTIP1516-044 ( ![]() |
RTIP1516-043 | 21 December 2015 | Any documents relating to a proposed tug harbour at Abbot Point for the period 1 January 2015 to 21 December 2015. | North Queensland Conservation Council | Documents not accessed by applicant. To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access. Processing charge: $681.10 |
RTIP1516-041 | 2 December 2015 | Documents submitted by Sunshine Coast Council (SRC) to the Minister responsible for Local Government and Planning regarding changes to SRC's Local Government Plan. | Name withheld | Application transferred to another agency |
RTIP1516-039 | 24 November 2015 |
|
Name withheld | Application refused |
RTIP1516-038 | 24 November 2015 | All correspondence between the Deputy Premier, and her office staff, and Clive Palmer, and other representatives of Queensland Nickel and Waratah Coal, since February 13, along with any agendas or file notes of meetings between the same. | The Australian | Application transferred to another agency |
RTIP1516-035 | 20 November 2015 | Reply from Toowoomba Regional Council (TRC) to the Acting Director-General's letter to TRC written on the 15 September 2015. The letter is dated 13 November 2015. | Name withheld | Application finalised Documents for release – RTIP1516-035 ( ![]() |
RTIP1516-034 | 17 November 2015 | All current and applicable decision notices and planning approvals issued over Lot 1 on RP736303 and Lot 1 on RP736304, and any other relevant development approvals issued in respect of Cairns Airport land, either whilst it was under the ownership of Far North Queensland Ports Corporation Ltd (t/a Ports North) or changes since becoming privately wondered by Cairns Airport Property Holdings Pty Ltd. | Cairns Regional Council | Finalised and released administratively |
RTIP1516-032 | 10 November 2015 | All communications (emails, letters, and meeting notes) between Cockatoo Coal Limited (and its subsidiaries and representatives) and the State Government of Queensland between 1 September 2011 and 31 July 2012 regarding the use of the Theodore-Baralaba Road (also known as Middle Road) as a coal haul route. | Name withheld | No documents located |
RTIP1516-031 | 28 October 2015 | All correspondence, emails, memos, letters, briefing notes and reports created between 1 July 2015 and 27 October 2015 that are held within the Office of the Deputy Premier, Minister for Transport, Minister for Infrastructure, Local Government and Planning and Minister for Trade and which relate to the Member for Cook and/or the Cook Electorate Office. (This application was made to the Office of the Deputy Premier, Minister for Transport, Minister for Infrastructure, Local Government and Planning and Minister for Trade.) |
Name withheld | Transferred to Office of the Deputy Premier, Minister for Transport, Minister for Infrastructure, Local Government and Planning and Minister for Trade |
RTIP1516-028 MIN | 28 October 2015 | All correspondence, emails, memos, letters, briefing notes and reports created between 1 July 2015 and 27 October 2015 that are held within the Office of the Minister for State Development and Minister for Natural Resources and Mines and which relate to the Member for Cook and/or the Cook Electorate Office. (This application was made to the Office of the Minister for State Development) |
Office of the Leader of the Opposition | Application refused |
RTIP1516-027 | 21 October 2015 |
|
Name withheld | Application finalised Documents for release - RTIP1516-027 ( ![]() |
RTIP1516-026 | 22 October 2015 |
|
Name withheld | Application withdrawn |
RTIP1516-025 MIN | 19 October 2015 | All documents created between 31 January 2015 and 19 October 2015 relating to the Great Keppel Island Resort (GKIR) project including but not limited to:
|
Name withheld | Application withdrawn |
RTIP1516-024 | 19 October 2015 | All documents created between 31 January 2015 and 19 October 2015 relating to the Great Keppel Island Resort (GKIR) project including but not limited to:
|
Not yet released | Application transferred to The Office of the Minister for State Development. |
RTIP1516-023 | 15 October 2015 | The Aurecon environmental report that was completed as part of the call in assessment for Cedar Woods development - Upper Kedron and referenced in the Ministerial Direction dated 1 September 2015. | Huntsman Property Pty Ltd | Application finalised Documents for release - RTIP1516-023 ( ![]() |
RTIP1516-022 | 15 October 2015 | Letter dated 15 September 2015 from Office of Director General to the Toowoomba Regional Council (TRC) seeking information on issues raised in a meeting on 14 July about TRC performance in rural areas. | Name withheld | Application finalised Documents for release - RTIP1516-022 ( ![]() |
RTIP1516-021 | 8 October 2015 | Results from water tests undertaken at properties at 4 Carbine Court, Karalee and 13 Pharlap Parade, Karalee | Name withheld | Application withdrawn |
RTIP1516-020 | 28 September 2015 | Records of communications during the period 1 August 2015 to 25 September 2015 that relate to development application SPD-1114-013485 and were between any of the following entities:
|
Name withheld | Application withdrawn |
RTIP1516-019 | 17 September 2015 | All correspondence between Dave Hanna (formerly of the Builders Labourers Federation (BLF) and Construction Forestry Mining Energy Union of Queensland (CFMEU)) and the Deputy Premier on any issue since the last election | Name withheld | Application refused (subscript 1) |
RTIP1516-018 | 14 September 2015 | All documents referred to as attachments to the Briefing Note for Clare Solar Farm, Clare determination of call in signed on 28 August 2015 (MBN15/1360), excluding:
|
Name withheld | Documents not accessed by applicant To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access. Processing charge: $569.90 |
RTIP1516-017 MIN | 02 September 2015 | All documents detailing who the Minister was scheduled to meet as part of the business observers program at the Queensland Labor State Conference in August, including diary entries, correspondence with the party and correspondence with the observers. Please note this information has been released previously under RTI in a former Labor government. | Not yet released | Application withdrawn |
RTIP1516-016 | 31 August 2015 | All documents detailing who the Minister was scheduled to meet as part of the business observers program at the Queensland Labor State Conference in August, including diary entries, correspondence with the party and correspondence with the observers. | Name withheld | Application transferred to Office of the Deputy Premier, Minister for Transport, Minister for Infrastructure, Local Government and Planning and Minister for Trade' |
RTIP1516-015 | 31 August 2015 | All documents detailing who the Minister was scheduled to meet as part of the business observers program at the Queensland Labor State Conference in August, including diary entries, correspondence with the party and correspondence with the observers. Please note this information has been released previously under RTI in a former Labor government. | Not yet released | Application transferred to The Office of the Minister for State Development |
RTIP1516-014 | 26 August 2015 | The GHD technical specialist report prepared in relation to a development application made by Pacific View Farm (Queensland) Pty Ltd that was called in and approved (subject to conditions) by the Deputy Premier. | Pacific View Farm (Queensland) Pty Ltd | Application finalised Documents for release - RTIP1516-014 ( ![]() |
RTIP1516-013 MIN | 25 August 2015 | All notes and correspondence created since 1 January 2015 concerning or referring to meetings between representatives of Adani, including but not limited to lobbyist Cameron Milner, and:
|
Greenpeace Australia Pacific | Application finalised Documents for publication – RTIP1516-013 ( ![]() |
RTIP1516-012 | 25 August 2015 | All documents created between 23 April 2014 and 24 August 2015 concerning the investigation into the alleged inappropriate conduct by a Councillor. | Country Focus | Application withdrawn |
RTIP1516-011 | 24 August 2015 | The following documents created between 1 January 2013 and 31 August 2014 concerning the Aurukun bauxite project:
|
News Corp Australia (Cairns Post) | Application finalised Documents for publication – RTIP1516-011 ( ![]() |
RTIP1516-010 | 24 August 2015 | All notes and correspondence created since 1 January 2015 concerning or referring to meetings between representatives of Adani, including but not limited to lobbyist Cameron Milner, and:
Type of documents requested: notes and correspondence including staff notes reporting on meetings, emails, letters, diary entries |
Not yet released | Application transferred |
RTIP1516-009 | 20 August 2015 | Records relating to Kennedy Regiment Memorial Pool in Charters Towers. | Name withheld | Application withdrawn |
RTIP1516-007 | 17 August 2015 | The following documents relating to the call-in notice dated 27 July 2015 for a proposed solar farm at Clare:
|
Wilmar Sugar Pty Ltd | Application finalised Documents for release - RTIP1516-007 ( ![]() |
RTIP1516-006 | 26 August 2016 | Documents held by State Development and Regional Services that were created since 1 January 2012 and which refer to:
|
Aak-Kunch Aboriginal Corporation (NAK) | Application finalised Documents for publication – RTIP1516-006 ( ![]() |
RTIP1516-004 | 31 July 2015 |
|
Name withheld | Documents not accessed by applicant. To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access. Processing charge: $1098.10 |
RTIP1516-003 | 21 July 2015 | All documents created between 13 May 2014 and 21 July 2015 concerning alleged inappropriate conduct by a Councillor. | Name withheld | Application finalised |
RTIP1516-002 | 21 July 2015 | All documents from 1 January 2013 to the present relating to the Commonwealth Bank’s potential involvement in Adani’s Abbot Point project and Carmichael coal mine in the Galilee Basin, including:
|
350.org Australia | Application refused |
RTIP1415-092 | 3 July 2015 | Report and other information regarding the traffic lights at the intersection of Ellenborough St and East Darling Street at Ipswich Central. | Name withheld | Application withdrawn |
RTIP1415-090 | 15 June 2015 | Correspondence to or from executive level public servants in Department of Natural Resources and Mines, excluding communication with third parties (i.e. only within government communications), in relation to proposed or approved high value agriculture land clearing on Strathmore Station (2 approvals), Olive Vale Station and the Galea approval (SDA-0314-009010). Executive level means DG, DDG, Directors or Executive Directors in this or the previous government. | Name withheld | Application refused |
RTIP1415-088 | 2 June 2015 |
|
Katestone | Application refused |
RTIP1415-085 | 22 May 2015 | All documents provided by the Department of Transport and Main Roads (DTMR) to the Department of State Development, Infrastructure and Planning (DSDIP) in the course of:
|
Name withheld | Application withdrawn |
RTIP1415-082 | 19 May 2015 |
|
Not yet released | Application Withdrawn |
RTIP1415-079 | 7 May 2015 |
|
Name withheld | Application finalised Documents for release - RTIP1415-079 ( |
RTIP1415-076 | 10 April 2015 | Documents revealing the number of regulated dogs living in Queensland, broken down by Council. | Not yet released | Application transferred to another agency |
RTIP1415-074 | 8 April 2015 | Documents created between 1 January 2014 and 31 December 2014 relating to Expression of Interest on purchasing State Land Lot 218 on MCH4901 Lease D. | Name withheld | Application withdrawn |
RTIP1415-071 | 5 March 2015 | Documents concerning the approval process for granting a 'community infrastructure designation' to the haul road referred to as Goondicum Mine's Eastern Access Road. | Name withheld | Application finalised Documents for release - RTIP1415-071 ( |
RTIP1415-059 | 18 December 2014 | Documents relating to the Peak Hill Quarry Lot 2 on RP 618088, Title Reference 30566223. Date range: 1 January 1998 to 18 December 2014 |
Name withheld | Application refused |
RTIP1415-037 | 21 October 2014 | Budget and expenditures for State Emergency Services and Volunteer Coast Guard. | Name withheld | Application withdrawn |
RTIP1415-036 | 16 October 2014 | Copy of internal report produced by the department on the debt situation of all Queensland local councils. Request a breakdown of each council's deficit for 2013-14 and outlook for 2014-15. | Name withheld | Application finalised |
RTIP1415-031 MIN | 13 October 2014 | Emails and diary entries of the Office of the Minister for Local Government, Community Recovery and Resilience. Date range: 6 October 2014 to 9 October 2014 (This application was made to the Office of the Minister for Local Government, Community Recovery and Resilience) |
Name withheld | Application withdrawn |
RTIP1415-029 | 3 October 2014 | Correspondence between Redland City Council and the Department of Local Government in File No MC14/1670. | Raby Bay Ratepayer's Association | Application finalised Documents for release - RTIP1415-029 ( |
RTIP1415-011 | 14 August 2014 | Allegations made against a Councillor. | Name withheld | Application finalised |
RTIP1415-010 | 12 August 2014 | All correspondence, agreements, conditions of use, or any other material that relates to the railway corridor at several properties. | Name withheld | Application withdrawn |
RTIP1415-007 | 4 August 2014 | All complaint letters to the Gladstone Regional Council regarding the relocation of a business. | Name withheld | Application withdrawn | RTIP1415-001 | 2 July 2014 | Documents held by any section of DSDIP that is involved with fluoridation in any way, particularly the Qld Fluoridation Capital Assistance team and the Queensland Water Fluoridation Implementation Program team. | Fluoride Action Network Australia Inc. | Application finalised Documents for publication – RTIP1415-001 ( ![]() |
RTIP1314-129 | 3 June 2014 | All records relating to dealings between Minister and department with Indooroopilly Golf Club and with Brisbane City Council. Date range: 1 January 1946 to 31 December 1985 |
Name withheld | No documents located |
RTIP1314-125 | 26 May 2014 | Any claim application/submission relating to 'Bald Hills Road' and the Quantum of the Claim under NDRRA 2003 by Livingstone Shire Council. Date range: 1 January 2003 to 31 January 2004 |
Glenda Mather | Application finalised Documents for release - RTIP1314-125 ( |
RTIP1314-121 | 8 May 2014 | Driving logs for the Minister's car with any references to trips to or from West End or South Brisbane in Brisbane. Date range: 30 July 2013 to 3 November 2013 (This application was made to the Office of the Minister for Local Government, Community Recovery and Resilience) |
Name withheld | No documents located |
RTIP1314-118 | 6 May 2014 | Any correspondence to and from Premier Campbell Newman since 1 January 2014. (This application was made to the Office of the Minister for Local Government, Community Recovery and Resilience) |
Alison Sandy / Seven Network | Application finalised Documents for release - RTIP1314-118 ( |
RTIP1314-115 | 5 May 2014 | Any documents, including reports, photos and CCTV, relating to dog bites, since 27 May 2012. | Alison Sandy / Seven Network | Application finalised Documents for release - RTIP1314-115 ( |
RTIP1314-086 | 13 March 2014 | All documents relating to a Development Application at Coolum Beach. | Name withheld | No documents located |
RTIP1314-081 | 19 February 2014 | Documents and submissions made in relation to a Tribunal hearing on November 2013. | Name withheld | Application finalised |
RTIP1314-078 | 20 January 2014 | All documents between the Department(s) for Local Government, Infrastructure and Planning and Natural Resources (Mines DERM), (name withheld), Kolan Shire Council, Bundaberg Regional Council and any other third parties. Date range: January 1996 to January 2014 |
Name withheld | Application finalised |
RTIP1314-075 | 15 January 2014 | Documents relating to a disaster declaration made by the Lockyer Valley Regional Council Local Disaster Management Group. | Name withheld | No documents located |
RTIP1314-073 | 17 December 2013 | Documents produced since the election of the Newman Government containing any information about incidents or occasions of harassment and/or bullying and/or abusive behaviour, including swearing, involving the minister and/or ministerial staff and/or any other minister in contact with the office. (This application was made to the Office of the Minister) |
Name withheld | No documents located |
RTIP1314-026 | 25 September 2013 | Documents pertaining to the Sunshine Coast Regional Council in relation to it conducting commercial waste and recycling services and anti-competitive business behaviour. | Rick Ralph / Waster Recycling Industry Association (QLD) Inc | Application finalised Documents for release - RTIP1314-026 ( |
RTIP1314-010 | 8 August 2013 | Documents relating to the development of a Greyhound track at Slacks Creek. | Name withheld | No documents located |
RTIP1314-006 | 15 July 2013 | Correspondence regarding the de-amalgamation of the Tablelands Regional Council. | Kuranda District Residents Group | Application finalised Documents for release - RTIP1314-006 ( |
RTIP1314-002 | 5 July 2013 | Documents containing information including analysis, assessment, evaluation and advice on the impact of a successful referendum on constitutional recognition of local government and whether State Governments will still be able to sack, suspend or discipline councils. | Name withheld | Application Withdrawn |
RTI150 | 24 June 2013 | Documentation in relation to a complaint alleging breach of trust lodged against a Councillor. | Name withheld | Application finalised Documents for release - RTI150 ( |
RTI138 | 14 May 2013 | All documents in relation to s257 Delegation of local government powers of the Local Government Act 2009 were properly performed and properly processed in relation to Lockyer Valley Regional Council. | Name withheld | No documents located |
RTI137 | 14 May 2013 | Review of Local Government Amalgamation Costs Funding Submissions Final Summary Report dated August 2009. | Lake Macquarie City Council (NSW) | Application finalised Documents for release - RTI137 ( |
RTI123 | 23 April 2013 | All documents prepared or produced by the Queensland Reconstruction Authority relating to flooding in St George and all documents prepared by BMT WBM designers or CDM Smith Civil engineers. Date range: 1 January 2010 to 24 April 2013 |
Name withheld | No documents located |
RTI121 | 23 April 2013 | All Ministerial Briefing Notes identified as urgent or requiring some action or detailing reports between the Director-General and Minister of Local Government, Community Recovery and Resilience. Date range: 1 January 2013 and 23 April 2013 |
The Courier Mail | Application finalised Documents for release - RTI121 ( |
RTI118 | 5 April 2013 | Documents relating to stamp duty, Fraser Coast Regional Council and Wide Bay Water Corporation including:
Date range: 1 September 2012 to 5 April 2013 |
Name withheld | Application finalised Documents for release - RTI118 ( |
RTI113 | 8 March 2013 | Investigation by the former Acting Director-General of the former Department of Local Government during the Transport, Housing and Local Government Committee Estimates hearing on the 18 October 2012. | Tim Mulherin / Office of the Leader of the Opposition | Application finalised Documents for release - RTI113 ( |
RTI107 | 1 March 2013 | All correspondence to or from or in relation to a consulting firm held in the Office of the Minister for Local Government, Community Recovery and Resilience. | Waratah Coal Pty Ltd | Application finalised Documents for release - RTI107 ( |
RTI106 | 1 March 2013 | Emails from the Department of Local Government to the Fraser Coast Regional Council relating to the council's attempt to wind up Wide Bay Water Corporation. | Fraser Coast Chronicles | Application finalised Documents for release - RTI106 ( |
RTI105 | 1 March 2013 | Complaint documents relating to a Councillor. | Name withheld | Application finalised |
2009 - 2014
RTI no | Date released to applicant | Released document | Type and size |
---|---|---|---|
RTI065 | 4 February 2014 | All documents relating to Hancock Coal Pty Ltd, GVK and/or Waratah Coal Pty Ltd held by the Office of the Deputy Premier. Document type: All documents whatsoever including but not limited to correspondence, internal memos, file notes, meeting notes, emails etc. Exclude: - correspondence to or from Waratah Coal Pty Ltd; - Queensland Nickel Pty Ltd; - Fairway Coal Pty Ltd; - Mineralogy Pty Ltd; - Clive Palmer; and - publicly available information. Date range: 8 June 2012 to 26 October 2012 |
Documents for release - RTI065 (![]() |
RTI056 | 12 November 2013 | All documents: (a) in respect of the decision to declare the Northeast Business Park Project (the Project), bounded by the Bruce Highway to the west and the Caboolture River to the north, to be a significant project for which an Environmental Impact Statement (EIS) is required under the State Development and Public Works Organisation Act 1971 (the Act) (between 1 May 2006 and 28 February 2008); (b) in respect of the Coordinator-General's assessment of the EIS and Supplementary Environmental Impact Statement (SEIS) for the Project under part 4 of the Act (between 1 January 2008 and 31 October 2009); (c) in respect of any review and consideration of submissions made in respect of the land the subject of the Project during the public consultation period for the SEQ Regional Plan 2005-2026 and the SEQ Regional Plan 2009-2031 (between 1 January 2004 and 31 July 2009); (d) comprising communications with Northeast Business Park Pty Ltd including its officers, agents and representatives in respect of the Project (between 1 January 2004 and 13 September 2012). |
Documents for release - RTI056 - Folio A (![]() Documents for release - RTI056 - Folio B ( ![]() |
RTIP1314-034 | 22 October 2013 | Documents provided by Brisbane City Council to the Planning division to support the change of the proposed Low Density Residential zone of a property to Environmental Protection as part of the Lower Oxley Creek South Neighbourhood Plan. | Documents for release - RTIP1314-034 (![]() |
RTI102 | 7 June 2013 | All documents in respect of development application DEV2011/200 for the Caloundra South Urban Development Area including decisions in respect of the application; All documents in respect of the provision of contributions (land, works or financial) for infrastructure of the Caloundra South Urban Development Area including but not limited to those relating to DEV2011/200. Date range: 1 July 2010 to 17 July 2012. |
Documents for release - RTI102 - Folio A (![]() Documents for release - RTI102 - Folio B ( ![]() |
RTI099 | 23 May 2013 | All correspondence to or from or in relation to Santo Santoro or Santo Santoro Consulting held in the Department of State Development, Infrastructure and Planning (DSDIP). Document type: All documents whatsoever including but not limited to correspondence, meeting notes, file notes, memos, calendar entries, emails etc. Exclude documents to and from: - Waratah Coal Pty Ltd; - Fairway Coal Pty Ltd; - Styx Coal Pty Ltd; - Mineralogy Pty Ltd; - Queensland Nickel Pty Ltd; - Clive Frederick Palmer; and - publicly available documents. Date range: 26 March 2012 to 19 February 2013 |
Documents for release - RTI099 (![]() |
RTI092 | 9 April 2013 | Information about the Broadwater Marine Project announced by the Deputy Premier in November 2012. In particular, any correspondence with the Deputy Premier prior and subsequent to the Government's announcement on November 23. | ![]() |
RTI097 | 27 March 2013 | Any documents regarding the Noosa on Weyba Biodiversity Offset Area (BDOA) made on or after 3 February 2012: (a) received from the Sunshine Coast Regional Council (SCRC), Friends of Lake Weyba (FOLW) or solicitors acting for same; or (b) from DSDIP or the Minister and issued to SCRC, FOLW or solicitors acting for same. |
![]() |
RTI080 | 11 March 2013 | All documentation and correspondence to or from or in relation to GVK, Hancock Coal and Barry Broe. Document type: All documents whatsoever including but not limited to: - correspondence; - file notes; - meeting notes; - internal memos; - diary/calendar entries; and - emails. Date range: 24 March 2012 to 19 November 2012 |
Documents for release - RTI080 (![]() |
RTI079 | 11 March 2013 | All documentation and correspondence recording or in relation to discussions between the Office of the Deputy Premier or its delegates or authorised representatives and the Attorney General and/or the Department of Justice and the Attorney General, its delegates or authorised representatives. Document type: All documents whatsoever including but not limited to: - correspondence; - file notes; - meeting notes; - internal memos; - diary/calendar entries; and - emails. Date Range: 1 August 2012 to 19 November 2012 |
Documents for release - RTI079 (![]() |
RTI073 | 11 March 2013 | All documentation relating to the "Economic Development Bill 2012" held with the Office of the Deputy Premier. Document type: All documents whatsoever including but not limited to: - correspondence; - meeting notes; - file notes; and - calendar entries. Date range: 23 March 2012 to 13 November 2012 |
Documents for release - RTI073 (![]() |
RTI096 | 1 March 2013 | Documents relating to the provision of catering, including but not limited to beverage (including alcohol) and food provided by the Office of the Director-General, Department of State Development, Infrastructure and Planning while having meetings of any nature that are attended by the Deputy Premier and Minister for State Development, Infrastructure and Planning and/or a staff member from the Office of the Deputy Premier | ![]() |
RTI084 | 26 February 2013 | Advice received from contractors RPS referenced in the Coordinator-General's Evaluation Report on the Environmental Impact Statement of the Alpha Coal Project | ![]() |
RTI077 | 20 February 2013 | All documentation and correspondence recording or in relation to discussions between the Department of State Development, Infrastructure and Planning or its delegates or authorised representatives and the Attorney General and/or the Department of Justice and the Attorney General (DJAG), its delegates or authorised representatives in relation to: - the RTI Act; - the Economic Development Bill; - the Mining Act; - the State Development and Public Works Organisation Act; and - all associated legislation, bills, and regulations. Document type: All documents whatsoever including but not limited to: - correspondence; - file notes; - meeting notes; - internal memos; - diary/calendar entries; and - emails. Date Range: 1 August 2012 to 19 November 2012 |
Documents for release - RTI077 (![]() |
RTI078 | 12 February 2013 | All correspondence and communications between the Office of the Deputy Premier and the Office of the Information Commissioner. Document type: All documents whatsoever including but not limited to: - correspondence; - file notes; - meeting notes; - internal memos; - diary/calendar entries; and - emails. Date range: 1 May 2012 to 19 November 2012 |
Documents for release - RTI078 (![]() |
RTI066 | 12 February 2013 | All documents relating to GVK. Document type: All documents whatsoever including but not limited to correspondence, internal memos, file notes, meeting notes, emails etc. Exclude: - correspondence to or from Waratah Coal Pty Ltd; - China First Pty Ltd; - Mineralogy Pty Ltd; - Queensland Nickel Pty Ltd; - Fairway Coal Pty Ltd; - Clive Palmer; and - publicly available documents. Date range: 8 June 2012 to 20 July 2012 |
Documents for release - RTI066 (![]() |
RTI023 | 20 December 2012 | Documents relating to Link Water Project, Toowoomba Pipeline Alliance and 503 Cressbrook Creek Road, Biarra described as Lot 946 on Crown Plan CSH669 | ![]() |
RTI051 | 27 November 2012 | Access to Stanwell, Gladstone Infrastructure Corridor, Phase 3 Report. | * |
RTI032 | 12 November 2012 | Documents in respect of the proposed Palmer’s Wharf project to be approved as an ‘Infrastructure Facility of Significance’ pursuant to the State Development and Public Works Organisation Act 1971, excluding internal emails and file notes generated by the Coordinator-General. Document Type: Documents, correspondence, meeting notes, internal memos, emails. Exclude: All correspondence to or from Waratah Coal Pty Ltd, China First Pty Ltd, Queensland Nickel Pty Ltd, Mineralogy Pty Ltd and Clive Palmer and all publicly available documents. Date Range: 9 July 2011 - 16 August 2012 |
Documents for release – RTI032 (![]() |
RTI029 | 12 November 2012 | Correspondence directly to and from David Stolz relating to Waratah Coal Pty Ltd and any documents, meeting notes, internal memos and emails etc relating to or referring to David Stolz, excluding correspondence to/from Waratah Coal, China First and/or Mineralogy and publicly available information. Date Range: 24 March 2012 to 15 August 2012. |
Documents for release – RTI029 (![]() |
RTI030 | 7 November 2012 | Correspondence directly to or from David Stolz relating to Waratah Coal Pty Ltd, or any reference to David Stolz in documents, correspondence, meeting notes, internal memos and emails etc. Exclude: - correspondence to/from Waratah Coal, China First and/or Mineralogy; and - publicly available information. Date Range: 24 March 2012 to 15 August 2012 |
Documents for release – RTI030 (![]() |
RTI044 | 5 November 2012 | Noosa on Weyba Biodiversity Development Offset Area Infrastructure Agreement dated 20 January 2012. | * |
RTI028 | Documents and correspondence relating to: 1. page 147 of the Extraordinary Queensland Government Gazette dated 27 January 2012; and 2. the QR Limited Central Queensland Integrated Rail Project Application including: 2.1 the original Initial Advice Statement dated 7 October 2011; 2.2 the OR Limited Initial Advice Statement dated 5 December 2011; 2.3 the decision of the Coordinator General to award AR Limited’s Central Queensland Rail Project State Significance status; and 2.4 page 147 of the Extraordinary Queensland Government Gazette dated 27 January 2012 for the entire period from 1 July 2011 to 14 August 2012. |
Documents for release – RTI028 (![]() |
|
RTI 91/11 | 15 October 2012 | All documents relating to GVK only. Date range: 26 March 2012 to 7 June 2012 Exclude: Environmental Impact Statements and information publicly available. |
Documents for release – RTI91-11 (![]() |
RTI003 | 15 October 2012 | Internal documents relating to the decision for 'Infrastructure Facility of Significance' status for Alpha Coal Rail Corridor Project in relation to Hancock Coal Pty Ltd, Hancock Alpha West or Hancock Coal Infrastructure Pty Ltd. Document type: Emails, file notes, and final briefing notes only. Date range: 1 October 2009 to 14 June 2012 |
Documents for release – RTI003 (![]() |
RTI036 | 12 October 2012 | Any communications to/from The Next Consulting Services. Document Type: Correspondence, meeting notes, file notes, internal memos, emails. Date Range: 24 March 2012 to 17 August 2012 |
Documents for release – RTI036 (![]() |
RTI039 | 14 September 2012 | Any documents to or from or in relation to Mr David Moore | ![]() |
RTI021 | 5 September 2012 | Any communication to or from Mr David Moore in relation to GVK, Hancock Coal, Waratah Coal or the Galilee Basin. Document type: Correspondence, meeting notes, file notes, internal memos and emails. Date Range: 24 March 2012 to 17 July 2012 |
Documents for release – RTI021 (![]() |
RTI017 | 20 August 2012 | Meetings between the Deputy Premier, Assistant Minister or Ministerial staff with business people, stakeholders or members of the public at the Liberal National Party's State Convention | ![]() |
RTI 82/11 | 7 August 2012 Deferred Access 24 August 2012 |
The former Minister's decision to define the State Interest identified in the proposal the subject of the development application made by North Queensland Bio-Energy Corporation. | * |
RTI016 | 3 August 2012 | The Queensland Regulated Dogs Register - showing how many regulated dogs live in the state | ![]() |
77/11 | 13 July 2012 | Documents submitted by the Stockland Group during the development of the SEQ Regional Plan in relation to their landholdings at Caloundra South, Bellvista Stage 1 & 2 and Halls Creek * | * |
IA000728 | 10 July 2012 | Application under the Right to Information Act 2009 - All correspondence, internal and inter-agency including DIP, DERM and the Commonwealth DEWHA regarding the assessment of the environmental impact statements for the GLNG and QCLNG projects for the period of 1 May 2010 to 30 June 2010.
File B File C File D File E File F File G |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
78/11 | 19 June 2012 | A change to the urban footprint boundary in the South East Queensland Regional Plan which affected Lot 800 on SP118715 | ![]() |
63/11 | 21 February 2012 | Documents relating to a possible de-amalgamation from Rockhampton Regional Council | ![]() |
43/10 | 20 December 2011 | The application requests access to the selection, approval and assignment of Shane McDowall to the role of Chair of the Board of Directors City North Infrastructure on 8 September 2008 | ![]() |
41/11 | 14 October 2011 | 2011 summary of the decisions of the Remuneration and Discipline Tribunal and the Regional Conduct Review Panel as mentioned in the department's 2010/11 annual report. | ![]() |
18/11 | 16 September 2011 | Isaac Regional Council's assessment of a development application lodged by RPS on behalf of BM Alliance Coal Operations * | * |
31/11 | 29 July 2011 | Letters and emails between Gold Coast City Council (and/or Mayor Clarke) and the Minister's office relating to the removal of land from the urban footprint under the South East Regional Plan 2009-2031 | ![]() |
30/11 | 29 July 2011 | Letters and emails between Gold Coast City Council (and/or Mayor Clarke) and the Department relating to the removal of land from the urban footprint under the South East Regional Plan 2009-2031 | ![]() |
17/11 | 21 June 2011 | Documents in relation to and leading to the amendment to the Town Planning Scheme for the balance of the Shire of Isis and Part of the Shire of Isis (Woodgate and Environs) to include definitions of Rural home Industry, Rural Industry, Rural Tourist Facility and packing shed. | ![]() |
10/11 | 5 May 2011 | Draft Brisbane City Council Local Growth Management Strategy * | * |
11/11 | 21 April 2011 | Documents relating to the 'Background Study Economic Development, Employment Location and Regional Activity Centres Investigations' (SEQ Regional Plan 2009-2031) * | * |
02/11 | 27 January 2011 | The application requests access to the development application drawings for Caval Ridge Buffel Park Village Accommodation. | ![]() |
18/10 | 20 December 2010 | Any documents relating to complaints or investigations into local government employees including Councillors and Mayors since January 1, 2009. Part 1 (pages 1 - 19) Part 2 (pages 20 - 35) Part 3 (pages 36 - 48) |
![]() ![]() ![]() |
37/10 | 17 December 2010 | Details of all reports, briefings, minutes of meetings and correspondence of all kinds between Minister Hinchliffe and representatives of the Stockland Group relating to Stockland landholding at Caloundra South (Caloundra South and Caloundra South - Bells Creek area) and Bellvista Stage 1 and 2 | ![]() |
34/10 | 14 December 2010 | Details of all reports, briefings, minutes of meetings and correspondence of all kinds between the Department of Infrastructure and Planning and representatives of the Stockland Group relating to Stockland landholding at Caloundra South (Caloundra South and Caloundra South - Bells Creek area) and Bellvista Stage 1 and 2 * | * |
42/10 | N/A | The application requests access to all correspondence between the CEO of City North Infrastructure (CNI), the Deputy Director-General Department of Infrastructure and Planning, the Deputy Coordinator-General, and the Chairman of the CNI Board as per section 5(a) (i) of the PMA (Part 1 and 2). | * |
24/10 | 21 October 2010 | The application requests access to the Airport Link documents relating to Traffic Management Plans | ![]() |
02/10 | 2 September 2010 | Documents relating to sex shops | ![]() |
086 | 5 August 2010 | Material relevant to the Minister and Coordinator-General's consideration of applications MCU-2004-1420 and MCU-2002-1079 both being applications submitted by northeast Business Park in relation to an integrated development over 15.2-32 & 34 Nolan Drive and 31 & 60 Trafalgar Drive, Morayfield and 185 & 195-235 Farry Road. Burpengary. * | * |
089 | 27 May 2010 | All documents concerning various investigations, reports and considerations in relation to the South East Queensland Regional Plan 2009-2031 ("the SEQRP") and the State Planning Policy (SPP) for Koala conservation. SEQRP 2009-2031 and SPP for Koala conservation (pages-1-100) SEQRP 2009-2031 and SPP for Koala conservation (pages 101-200) SEQRP 2009-2031 and SPP for Koala conservation (pages 201-300) SEQRP 2009-2031 and SPP for Koala conservation (pages 301-400) SEQRP 2009-2031 and SPP for Koala conservation (pages 401-460) SEQRP 2009-2031 and SPP for Koala conservation (pages 461-520) |
![]() ![]() ![]() ![]() ![]() ![]() |
093 | 13 May 2010 | Draft Acacia Ridge/Archerfield Neighbourhood Plan 2009 | ![]() |
DAV90 | 5 May 2010 | The application requests access to the Airport Link - Project Management Agreement | ![]() |
RUS81 | 9 April 2010 | The application requests access to the Airport Link - Excessive Noise | ![]() |
BRE16 | 10 March 2010 | The application requests access to the Airport Link Volumetric Resumption | ![]() |
04/10 | 28 February 2010 | The application requests access to documents indicating the reasons for declaring the Ella Bay Integrated Resort Project a development of State significance | ![]() |
062 | 22 January 2010 | Documents relating to the issues raised in submission 9 sub No 2085) in response to the Draft South East Queensland Regional Plan 2009 - 2031 | ![]() |
034 | 9 November 2009 | Thornlands Integrated Employment Area withdrawn from SEQ Regional Plan | ![]() |
029 | 6 November 2009 | Thornlands Integrated Enterprise Precinct removal from the SEQ Urban Footprint in the SEQ Regional Plan Review 2009-2031 | ![]() |
012 | 16 September 2009 | Tank Street Pedestrian Bridge | ![]() |
017 | 11 September 2009 | Proposed quarry at Cliff Barons Road, Upper Ormeau | ![]() |
003 | 27 August 2009 | Chinatown Mall redevelopment | ![]() |