Option F: Millaquin Bend
This option involves deepening, widening and regular maintenance dredging of a section of the left bank of the Burnett River by excavation and dredging to improve flood conveyance through a constricted part of the river.
- Option overview (
1.52 MB).
- Technical discussion paper (
1.04 MB).
Last updated: 09 Nov 2021