Skip to content

Boggo Road Cross River Rail

Key details

The Boggo Road Cross River Rail (CRR) Priority Development Area (PDA) was declared on 2 October 2020 and an Interim Land Use Plan (ILUP) given effect.

The Cross River Rail Delivery Authority is responsible for planning and development assessment within the Boggo Road CRR PDA.

The 39-hectare PDA is generally bounded by the existing rail corridor to the north, Cornwall Street to the south, Annerley Road to the west, and Ipswich Road to the east.

The PDA contains significant existing facilities and government land holdings including the Boggo Road Urban Village (which includes the Ecosciences Precinct, Dutton Park Police Station and the heritage listed Boggo Road Gaol), the Pharmacy Australia Centre of Excellence, the Translational Research Institute and the Princess Alexandra Hospital to support the continued focus and investment in health, science, innovation, research and education services.

Proposed Boggo Road CRR PDA Development Scheme

A development scheme is a regulatory document which assists with planning, carrying out, promoting, coordinating and controlling development within a PDA.

Prior to finalising a development scheme for the Boggo Road CRR PDA, a Proposed Development Scheme has been prepared and, in accordance with the Economic Development Act 2012, was made available for public comment between 23 February 2022 and 6 April 2022 (the submissions period).

Download the Boggo Road CRR PDA Proposed Development Scheme ( 22.2 MB).

The Cross River Rail Delivery Authority has also prepared a Draft Development Charges and Offset Plan, which identifies infrastructure required to service the PDA, development charges and how these charges are calculated, levied and administered. The Draft Development Charges and Offset Plan was also available for public comment during the submission period. The information contained within the Infrastructure Plan Background Report was used to inform the infrastructure plan and is included below as supporting information for reference purposes only.

Download the Boggo Road CRR PDA Draft Development Charges and Offset Plan ( 6.7 MB).

Download the Boggo Road CRR PDA Infrastructure Plan Background Report ( 49.6 MB).

Visit the Cross River Rail Delivery Authority Website to find out more information on the Proposed Boggo Road CRR PDA development Scheme, Boggo Road CRR PDA Draft Development Charges and Offsets Plan and other supporting materials.

Boggo Road CRR PDA Interim Land Use Plan

Until the development scheme is finalised, development within the PDA will be regulated under the Boggo Road CRR PDA Interim Land Use Plan (PDF icon 1.1 MB).

Boggo Road CRR PDA regulatory map

Download the Boggo Road CRR PDA regulatory map (PDF icon 411 KB).

Boggo Road CRR PDA boundary map

Cross River Rail project

For further information on the CRR project please contact the Cross River Rail Delivery Authority or visit their website.

Last updated: 03 Jun 2022