Declared in November 2011, the Surat Basin Infrastructure Corridor State Development Area (SDA) is a 214-kilometre rail corridor between the towns of Wandoan and Banana.

It will accommodate the proposed Surat Basin Rail - often referred to as the 'Southern Missing Link' - which will connect the existing Western Railway and Moura Railway systems.

The rail corridor will support the development of new mines in the Surat Basin by enabling the transport of coal via the rail network to the Port of Gladstone for export.

The route was chosen following an analysis of a range of geographic, social, cultural, environmental and engineering design criteria.

The Surat Basin Infrastructure Corridor SDA development scheme

The Surat Basin Infrastructure Corridor SDA development scheme is a regulatory document that controls planning and development in the SDA.

The current development scheme for the Surat Basin Infrastructure Corridor State Development Area February 2014 was approved by the Governor in Council in March 2014.

Download the current Development Scheme for the Surat Basin Infrastructure Corridor State Development Area (PDF icon 304 KB).

The development scheme contains a development assessment framework for making, assessing and deciding applications and requests relating to development within the Surat Basin Infrastructure Corridor SDA. The most common of these is an SDA application for a material change of use.

The development scheme for the Surat Basin Infrastructure Corridor SDA is supported by a Public consultation policy (PDF icon 65 KB) that provides information on matters the Coordinator-General may consider when determining whether public consultation of an SDA application is required.

Amendments

The development scheme was amended in 2014 as a result of a mutual agreement between the Queensland Government and Surat Basin Rail Joint Venture to end an exclusive mandate to develop a rail line from the proposed Wandoan thermal coal mine to Banana.

Earlier versions of the development scheme:

The Surat Basin Infrastructure Corridor SDA maps

The Surat Basin Infrastructure Corridor SDA map (PDF icon 259 KB) shows the complete boundary of the declared SDA.

Seven additional maps show the various segments of the corridor in further detail:

Further information

For further information on the Surat Basin Infrastructure Corridor SDA contact the SDA Division on 1800 001 048 or via This email address is being protected from spambots. You need JavaScript enabled to view it..